Sideshoots - associated subjects => The Lighter Side => Topic started by: grahame on February 11, 2018, 10:23:32



Title: Re-aligning tracks
Post by: grahame on February 11, 2018, 10:23:32
Here's an illustration of just how hard it is to move a single track in the centre of a double formation to one side so that the line can be redoubled.   No wonder it costs so much!

https://www.facebook.com/AwesomeMachines121/videos/185078942077634/


Title: Re: Re-aligning tracks
Post by: ellendune on February 11, 2018, 12:31:02
Here's an illustration of just how hard it is to move a single track in the centre of a double formation to one side so that the line can be redoubled.   No wonder it costs so much!

https://www.facebook.com/AwesomeMachines121/videos/185078942077634/

That bit is much easier with the right machine though! 

The real cost comes if:
a) the track has to be lowered because the sides of the bridges are lower than the centre;
b) embankments need 50 years of back maintenance before the edges can stand the load of the track again;
c) the slopes of cuttings need regrading back to their original slope after neglect 50 years of no maintenance;
d) signalling equipment needs moving. 


Title: Re: Re-aligning tracks
Post by: TonyK on February 11, 2018, 15:02:42
That bit is much easier with the right machine though! 

The real cost comes if:
a) the track has to be lowered because the sides of the bridges are lower than the centre;
b) embankments need 50 years of back maintenance before the edges can stand the load of the track again;
c) the slopes of cuttings need regrading back to their original slope after neglect 50 years of no maintenance;

d) signalling equipment needs moving. 

The bits I have emphasised won't apply to Filton Bank. That only needs 34 years of back maintenance.


Title: Re: Re-aligning tracks
Post by: ellendune on February 11, 2018, 18:37:18
The bits I have emphasised won't apply to Filton Bank. That only needs 34 years of back maintenance.

That assumes there wasn't some maintenance backlog before the tracks were taken out!


Title: Re: Re-aligning tracks
Post by: TonyK on February 11, 2018, 19:45:44
That assumes there wasn't some maintenance backlog before the tracks were taken out!

I thought of that, but for once I decided to keep it simple.  :D



This page is printed from the "Coffee Shop" forum at http://gwr.passenger.chat which is provided by a customer of Great Western Railway. Views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that content provided contravenes our posting rules ( see http://railcustomer.info/1761 ). The forum is hosted by Well House Consultants - http://www.wellho.net