Great Western Coffee Shop

Journey by Journey => London to Didcot, Oxford and Banbury => Topic started by: willc on January 17, 2008, 22:03:33



Title: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: willc on January 17, 2008, 22:03:33
Buried away in timetable alterations on the FGW website is the news that from next Monday, the 07.30 from Oxford to Paddington will no longer call at Didcot Parkway, with Didcot passengers instead advised to join a service originating at Swansea, also due to depart at 07.44. Not quite so many empty seats on that one, I'd guess.

Quote
http://www.firstgreatwestern.co.uk/Content.aspx?id=2128


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: smokey on January 19, 2008, 15:37:10
Pain in the A*** for passengers from Oxford going to Didcot


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: Btline on January 19, 2008, 23:10:46
And will the journey time be decreased?

No! Yet more slack that makes no difference! And increased overcrowding on other services!


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: Btline on March 31, 2008, 22:55:39
Why does Didcot get more Down HST services (3-4 per hour) than Up HST services (2-3 per hour)

Basically, why do the HSTs from Swansea stop, but the HSTs to Swansea don't stop?

What's wrong with a bit of consistency....


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: Btline on April 02, 2008, 18:49:04
Does noone know? ???


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: eightf48544 on April 03, 2008, 10:49:16
Best guess some clever carriage roster clerk has discovered that if you don't stop the down Swansea you can save a unit over the day.

Up to December 07 at Taplow we had the same on the off peak London Suburban services.

Trains to Padd ran nearly all stations  Oxford to Slough   then Hayes (some Southall) Ealing Broadway.

This was followed by a Reading Twyford Maidenhead Slough most staions to Padd this was formed off the previous down Reading train as below,

Taplow trains from Padd ran Ealing B, Southall Hayes West Drayton Iver? Langley? then Slough and all stations Reading.

This was followed within 5 minutes by a Padd Ealing B Hayes Slough Maidenhead all stations Oxford which formed the up stopper for Taplow Padd a couple of hours later.

Allegedly this save one unit over the whole service. However it made realiablity a nightmare,  if a Taplow stopper was late this made the following OXford stopper late which made it late coming back to Taplow.

You can be too clever running a railway. After all the South Western pioneered regular interval fixed stoppping pattern services on electrification in the early 1900s. They also used to split and divide trains at places like Staines evry half hour. It worked then it still works now the clever bit is getting the stopping pattern right.

Asymmetry doesn't work.


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: Btline on April 03, 2008, 16:46:22
I am still a little confused...

So does it call on the down to eliminate the need for another stopper (Turbo)?


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: eightf48544 on April 03, 2008, 22:49:03
No,

So does it call on the down to eliminate the need for another stopper (Turbo)?



No, it's probably to save an HST set on the Padd - Swansea runs.

The Thames Valley offpeak service is now symmetrical so there is no missing of stops in one direction to save journey time and reduce number of Turbos required.


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: John R on April 03, 2008, 23:17:23
Maybe it doesn't call because if it did it would conflict somewhere further down the route. Westerleigh Jn, Parkway/Patchway, Severn Tunnel, Newport, and beyond are all potential places where it needs to be in the right place at the right time.


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: Btline on April 04, 2008, 00:01:44
Ar, I see. It is less of "up trains calling additionally" but more "down trains missing out stops."

Thanks.

Still seems a bit silly - a symmetrical consistent timetable would be better.

But then again, FGW released a leaflet talking about the increase in refreshed HSTs calling at Didcot. In the figures, they quoted the number of trains TO London which (because of the inconsistent timetable, that is the subject of this post) makes it look like just as many return journeys!

Or perhaps demand in is spread a lot more than demand out (less likely, but possible).

Thanks again for giving me some possible answers!  :)


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: grahame on April 04, 2008, 06:41:09
Thanks again for giving me some possible answers!  :)

I know I'm a bit late on this thread - but I have a thought. Perhaps there's an answer in this:

http://www.firstgreatwestern.info/coffeeshop/index.php?topic=2330.0

Perhaps the pattern is designed to give excellent fast Paddington to Didcot service, but to ensure that a healthy proportion of services either to or from each station further west do NOT call.





Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: Btline on April 04, 2008, 17:46:38
This some seem possible but probably no, because it is the down Swindon trains that call in addition.

This is really bugging me - and others.

Do any others on this board (who perhaps have more timetable knowledge etc.) know why Didcot has an additional HST (the up Swindon service)?

Thanks.


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: Chris from Nailsea on July 17, 2008, 23:16:29
Police horses will patrol Didcot town centre on Friday night. Thames Valley Police's mounted section will be on duty from 7pm to 1am. Pc Chris Ball said: "It will raise the police profile and act as a deterrent for people. We also hope it will highlight our approach to antisocial behaviour, underage drinking and lower- level antisocial problems, which we will be tackling this summer."

See http://www.oxfordmail.net/news/headlines/display.var.2397198.0.horse_patrol_ordered.php


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: Lee on January 15, 2009, 23:49:55
A long-awaited ^5.4m revamp of Didcot^s railway station forecourt looks set to be given the thumbs-up (link below.)
http://www.oxfordmail.co.uk/news/4046991.Decision_due_on_station_revamp/

Transport officers have recommended that the project to transform the forecourt of the station is given the support of Oxfordshire county councillors at a meeting on Tuesday.

This would mean that a planning application can be submitted next month to South Oxfordshire District Council.

The scheme, which will be paid for by the county council, aims to create a gateway for the town with better facilities for walkers, cyclists and bus users.

Redundant buildings on the forecourt will be demolished so that there is separate space for buses, taxis, bikes and cars.

There will be a central pedestrian area flanked by a dedicated bus and delivery area and a larger taxi rank.

More cycle parking will be provided, along with a drop-off point for cars.


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: inspector_blakey on January 16, 2009, 23:28:26
So, plenty of room for the hordes of rail replacement buses when track circuit failures stop the job then?  :D


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: signalandtelegraph on January 18, 2009, 08:16:40
So, plenty of room for the hordes of rail replacement buses when track circuit failures stop the job then?  :D

 ??? 


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: Ollie on January 18, 2009, 22:14:30
So, plenty of room for the hordes of rail replacement buses when track circuit failures stop the job then?  :D

 ??? 

Probably referring to both Fridays just gone where we have had power failures in Didcot area.


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: inspector_blakey on January 18, 2009, 22:15:17
There was a context when I made that post, honest.

http://www.firstgreatwestern.info/coffeeshop/index.php?topic=4185.0 (http://www.firstgreatwestern.info/coffeeshop/index.php?topic=4185.0)


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: gwr2006 on January 20, 2009, 23:08:09
Oxfordshire County Council today agreed to spend ^5.4m transforming the forecourt of Didcot Parkway Station into a high quality transport interchange. Officers can now complete design work so a planning application can be made in February, with work likely to start at the station in the summer.

BBC South Today video (http://news.bbc.co.uk/1/hi/england/7840469.stm)

BBC News website (http://news.bbc.co.uk/1/hi/england/oxfordshire/7839221.stm)

Oxfordshire County Council preess release (http://www.oxfordshire.gov.uk/wps/portal/publicsite/kcxml/04_Sj9SPykssy0xPLMnMz0vM0Y_QjzKL94039HcESZnFO8WHAVnoQpYIoSB9b31fj_zcVP0A_YLc0IhyR0dFAFjFnDo!/delta/base64xml/L3dJdyEvd0ZNQUFzQUMvNElVRS82X01fMU9D?WCM_GLOBAL_CONTEXT=http://apps.oxfordshire.gov.uk/wps/wcm/connect/Internet/Press+releases/Press+Releases+archive/2009/January/PR+-+Didcot%27s+5.4m+rail+station+transformation+moves+closer)

The council is also working with Network Rail and First Great Western to consider complementary improvements to the station concourse and waiting areas on platforms as part of Network Rail's National Station Improvement Programme.


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: G.Uard on January 21, 2009, 07:22:39
I hear that Didders will also be the next station to get a gateline.


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: inspector_blakey on January 21, 2009, 14:38:40
Sounds promising. Hopefully it'll stop the local wildlife from congregating in the waiting rooms, using the platforms for BMX practise and making life difficult for staff and passengers during the school holidays!


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: inspector_blakey on January 21, 2009, 17:30:37
I hear that Didders will also be the next station to get a gateline.

On second thought, how's that going to work? The only access to Didcot Railway Centre is through the subway on the platform 5 side of the station. And won't there be civil unrest amongst the commuters unless there's a ticket examiner posted on the Foxhall car park end of platform 1? I can't see them being too happy about having to double back through the station building to get out to their cars!


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: G.Uard on January 22, 2009, 08:25:57
Sorry, but I have no detailed knowledge of the scheme, other than the fact that some Revenue Protection insiders are less than pleased that resources will be spent at Didcot, rather than at the black spot which is Gloucester station.


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: willc on January 22, 2009, 13:57:43
But Didcot isn't much better for revenue protection, see the passenger quote in this story
http://www.oxfordmail.co.uk/search/4062190.Train_station_to_get___5_4m_revamp/ (http://www.oxfordmail.co.uk/search/4062190.Train_station_to_get___5_4m_revamp/)


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: autotank on January 23, 2009, 10:49:53
Went to Didcot station for the first time in ages on Tuesday and was really impresssed with the job they have done on the underpass. The new lighting and general spruce up has made it much more pleasant. Well done!

Also pleasantly pleased to find that the Reading - Didcot off peak return fare is now just ^5 (^3.30 with a railcard) excellent value!


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: Chris from Nailsea on December 22, 2011, 19:57:56
From the Oxford Mail (http://www.oxfordmail.co.uk/news/9430346.Station_ticket_barriers__could_deter_GWR_centre_visitors_/):

Quote
New ticket barriers at Didcot Parkway could deter visitors from calling in at Didcot Railway Centre, it is feared.

Rail operator First Great Western is planning to introduce ticket barriers at the station by November next year.

If the barriers are brought in at the ticket office at the front of the station it would block off the entrance to the railway centre, which is entered from the subway beneath the platforms.

Staff at the popular steam railway attraction are talking to station managers at First Great Western to find a solution.

First Great Western spokesman John Ratchford said: ^As with any major station improvement, we will work closely with our customers and stakeholders to minimise disruption ^ which in this case also means ensuring any changes to the station won^t adversely affect access to the excellent Didcot Railway Centre.^

Railway Centre manager Roger Orchard said: ^The ticket barriers have been on the cards for a long time and we want to make sure they are set up in such a way that they are not a deterrent for our customers.

^The barriers will come in during the latter part of 2012 so we want to make sure that a system is in place that is acceptable to us.^


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: Chris from Nailsea on January 13, 2012, 20:26:03
From the Oxford Times (http://www.oxfordtimes.co.uk/news/9469345.Drive_to_deter_station_car_park_racers/):

Quote
Police are cracking down on drivers using the long-stay car park at Didcot Parkway railway station to race their cars.

A new CCTV system has been installed at the Foxhall car park, which may end what police say is a longstanding problem.

They have also increased their patrols at the car park.

Pc Bob Burrowes, of British Transport Police^s Oxford unit, said: ^It appears to be young people and we are aware that there are few places for young drivers to go. But the car park is for rail users only. It has been a historic issue and you hear reports periodically of people using the car park in an inappropriate manner. Hopefully the new CCTV system will allow us to solve this.^

The system, which was paid for by rail firm First Great Western, allows the police to view images quickly, instead of having to wait 28 days as they would with the old equipment.

Officers are investigating a report of vehicles being driven ^erratically^ around the car park last Saturday evening, at about 6.30pm.

The three vehicles involved were a black Toyota Corolla, a green Renault Clio and a blue Renault Clio.

Anyone with any information about this incident should call BTP on 0800 405040.


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: Chris from Nailsea on January 17, 2012, 19:49:06
From the Oxford Mail (http://www.oxfordmail.co.uk/news/yourtown/witney/9474725.Vision_for_Oxford_railway_station_overhaul_unveiled/):

Quote
The main building at Oxford railway station could be knocked down to make way for new platforms under plans being considered by transport bosses.

The major redevelopment would see four through platforms ^ with no dead ends ^ built to solve what officials see as a major regional bottleneck.

County councillor Rodney Rose, responsible for Oxfordshire^s transport infrastructure, said the project was the only long-term solution to create enough capacity on Oxfordshire^s Rail network.

The proposal is put forward in a new county council rail strategy covering the next 22 years, which lists a station revamp by 2018 as the ^top priority^.

Under the proposal, the existing station would be demolished with trains pulling up either side of two island platforms, boosting the flow of trains.

The council^s draft Rail Strategy and Delivery Plan, to be discussed by Cabinet today, calls for a new project board to oversee the station^s re-design and link it with scheduled work to electrify the track and update signalling.

The strategy says: ^Oxford station has been identified by Network Rail as being a significant constraint on the network and is our top priority for improvement.

^Once the ^850m redevelopment of Reading station is complete, this will become the biggest single capacity bottleneck in the Thames Valley and a major barrier to rail and economic growth.^

It goes on: ^It is predicted that the number of peak services using the station is close to the maximum that can be accommodated, before any additional passenger or freight growth.^

In 2010, less ambitious plans to add an extra platform on the long stay car park were axed when County Hall lost millions of pounds of Government funding.

Network Rail is still committed to the project, and has asked for funding between 2014 and 2019.

But Mr Rose said in the longer term, the complete redesign of the station was needed.

He said: ^I still think this is something we should push for.

^Oxford is going to be the major bottleneck, and if East-West Rail goes through it will make it even worse.^

Network Rail spokesman Sam Kelly said a complete rebuild was not part of its current plans, but it would ^gladly discuss it^ with the council.

She added: ^In terms of the station itself, we will be working with First Great Western, Oxfordshire County Council and Oxford City Council to review passenger flow through the station to provide better facilities in the future.

^With regards to the railway itself, our plans over the coming years will provide the capacity need for the future.^

First Great Western would not comment on the plans, but said stakeholders and rail users should ^make their aspirations known^ ahead of its attempt to regain the franchise to run trains to London from April 2013.

Chiltern Railways has its own separate plans to build two new platforms on the old parcels platform and part of the short stay car park to serve its new Evergreen 3 link to London via Bicester.

The council^s new rail strategy includes other ambitious projects.

It says ^the time is right to look at again at the potential of a Grove & Wantage station^ and that a train service could be offered by firms competing to win the Great Western franchise in 2013.

And it commits the council to investigate reinstatement of the rail link between Oxford, Witney and Carterton, to improve connections with the west Oxfordshire towns and RAF Brize Norton.

The public will be able to have their say on the proposals in a consultation process due to start next month.

RAIL STRATEGY PRIORITIES

- Major projects already set to go ahead include electrification, the creation of the Evergreen 3 link from Oxford to Bicester, the East-West rail link, and ^5.6m redevelopment of Didcot Parkway forecourt

- A new masterplan for Oxford railway station, the re-development of Frideswide Square and integration of the station into the West End redevelopment

- More parking and bus facilities proposed for Bicester Town station, with a link to Bicester North. There is potential for rail freight facility at Graven Hill, using the Bicester Military Railway network.

- Opening a railway station near Grove and Wantage to serve Science Vale UK

- Redesign of Banbury station forecourt

- Improve buses from Witney to Hanborough station, and investigate long-term reinstatement of a rail link from Oxford to Witney and Carterton

- Improve parking and public transport links to stations in the Cotswolds


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: bigdaz on January 17, 2012, 20:03:29
I haven't got my Quail Track Diagram book to hand - after Hinksey Yard are there any crossovers before the Didcot avoiding line / Didcot Parkway??  If not, would there not still be quite a bottleneck between Didcot and Hinksey yard if there was a broken down train.... or is bidirectionally signalled throughout?? 


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: FremlinsMan on January 17, 2012, 20:30:05
From the Oxford Mail (http://www.oxfordmail.co.uk/news/yourtown/witney/9474725.Vision_for_Oxford_railway_station_overhaul_unveiled/):
....

- Opening a railway station near Grove and Wantage to serve Science Vale UK

Interesting. Would that imply Wantage Road being re-opened? I work at Harwell, but I think I would only benefit from a stop at Steventon - a short cycle ride away from HSIC.


Moderator note: Edited to fix quote marks. bignosemac.


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: paul7575 on January 17, 2012, 21:08:50
From the Oxford Mail (http://www.oxfordmail.co.uk/news/yourtown/witney/9474725.Vision_for_Oxford_railway_station_overhaul_unveiled/):

Quote
Network Rail spokesman Sam Kelly said a complete rebuild was not part of its current plans, but it would ^gladly discuss it^ with the council.

She added: ^In terms of the station itself, we will be working with First Great Western, Oxfordshire County Council and Oxford City Council to review passenger flow through the station to provide better facilities in the future.

Yet only 7 months ago Network Rail's GWML RUS was pretty upbeat about providing additional platform capacity at Oxford, to be done in conjunction with the next resignalling.  It even has a drawing of a twin island platform layout for Oxford Station in Appendix E...

Paul




Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: IndustryInsider on January 17, 2012, 21:31:51
Something does have to be done.  It's ridiculous that the main route towards Didcot/Reading/London only has one platform that trains can depart from.  Though a complete rebuild of that nature, with two new islands and a new concourse, would be very expensive.  Perhaps the south facing bay platform and an additional crossover and signal so that trains can also depart towards Didcot from platform 2 (in conjunction with the other facets of the Oxford Corridor enhancements that NR have recently been talking about) would be better value for money?


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: paul7575 on January 17, 2012, 21:40:21
If I was starting with a clean piece of paper, I think I'd suggest a new platform face on the back of the down island for through down trains, leaving the existing face for some terminating trains, which could then start back south from that platform as you propose. 

With the up side bay as well (on the car park as previously proposed) that should provide a fair amount of capacity increase - and without actually having to rebuild the main station entrance?

Paul


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: IndustryInsider on January 17, 2012, 21:49:54
Yes, that would be a half-way house scheme they could consider.  After all, the panel box would no longer be in the way once its area of control transfers to Didcot.

From the Oxford Mail (http://www.oxfordmail.co.uk/news/yourtown/witney/9474725.Vision_for_Oxford_railway_station_overhaul_unveiled/):
Quote
And it commits the council to investigate reinstatement of the rail link between Oxford, Witney and Carterton, to improve connections with the west Oxfordshire towns and RAF Brize Norton.

They could save a little money by not bothering to progress that idea though.  13 miles of new track to serve two places with a combined population of only just over 30000?  Not a chance of it ever being financially viable with (the usual problem) of housing and business parks and other general clutter now encroaching on the original formation.


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: inspector_blakey on January 17, 2012, 21:59:30
I have a feeling there's an influential local MP somewhere in the Witney area... ;)


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: macbrains on January 27, 2012, 13:24:19
Yes, that would be a half-way house scheme they could consider.  After all, the panel box would no longer be in the way once its area of control transfers to Didcot.

From the Oxford Mail (http://www.oxfordmail.co.uk/news/yourtown/witney/9474725.Vision_for_Oxford_railway_station_overhaul_unveiled/):
Quote
And it commits the council to investigate reinstatement of the rail link between Oxford, Witney and Carterton, to improve connections with the west Oxfordshire towns and RAF Brize Norton.

They could save a little money by not bothering to progress that idea though.  13 miles of new track to serve two places with a combined population of only just over 30000?  Not a chance of it ever being financially viable with (the usual problem) of housing and business parks and other general clutter now encroaching on the original formation.

Have you tried commuting to Oxford from Carterton or Witney via the A40 recently? :o  Doesn't matter what time you start, inevitably you end up in a huge traffic queue...

I do understand your point about viability, but that also applies to lots of other infrastructure projects that get approved as well.  As for new building across the original line, that applies in a few places certainly, but with some ingenuity could be solved.

rgds
m


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: IndustryInsider on January 27, 2012, 13:50:22
No, but I'm well aware that it's a horrible commute, though both places are very well served with an excellent bus service.  Journey time might be unreliable, but what lovely buses are used on that route!  My point about viability remains though - I'd be surprised if that route could be reinstated without spending upwards of half a billion pounds.  That simply isn't realistic, with ingenuity or not!

Better, if not ideal, options would include major improvements to the B4044 - getting rid of that silly tollbridge would be a start - to give a proper second route into the city.  Massive, and long overdue, improvements to parking at Hanborough station would also be a start as I'm sure many more people would commute by train should there be a guaranteed parking space and a regular enough service - I'm not sure how clogged up the A4095 gets which runs straight from Witney to Hanborough of a morning?


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: macbrains on January 27, 2012, 15:26:34
No doubt I'm just nostalgic but I'd love to see trains in Witney once more!

Agree about the splendid bus service, with leather seats...but it isn't cheap.  Regarding Hanborough, as you say, the car park is the key unless the bus service from Witney can be improved - this has been discussed before on these forums.  But the A4095 gets clogged up in tandem with the A40 with commuters looking for any escape they can find from the jams, and thereby causing more.

rgds
m


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: Chris from Nailsea on February 21, 2012, 23:03:44
From the British Transport Police press release (http://www.btp.presscentre.com/Media-Releases/British-Transport-Police-appeal-for-information-after-seven-cars-vandalised-Didcot-Parkway-1920.aspx):

Quote
British Transport Police (BTP) is appealing for information after seven cars were vandalised at Didcot Parkway rail station.

The incident occurred sometime between 3pm on Tuesday, 14 February and 8.30am on Wednesday, 15 February when a member of the public noticed the cars had been vandalised and contacted police.

Sergeant Adrian Naylor, officer in charge of BTP's dedicated team at Oxford, said: ^All seven cars had been left in the car park and when their owners returned to them they discovered windows had been smashed or damaged, some doors had been forced open and in at least one case the cars had had valuables removed from them.^

The cars were all in Foxhall car park, and officers believe the people responsible may have used ballast to damage the vehicles.

Sgt Naylor added: ^We^ve followed a number of leads so far, including viewing CCTV which appears to show someone entering the vicinity on a bicycle around 10.30pm, but our enquiries have so far proved fruitless.

^We are still in the process of speaking with the owners of the cars involved and I am now appealing to anyone who may have been in the area that night and noticed any suspicious activity to contact police ^ your information could be vital to the investigation.^

Anyone with information is asked to contact British Transport Police on 0800 40 50 40 quoting reference B11/LNA of 20/02/2012. Or call the independent charity Crimestoppers on 0800 555 111.


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: Chris from Nailsea on February 23, 2012, 19:53:24
From the British Transport Police press release (http://www.btp.presscentre.com/Media-Releases/CCTV-released-Police-appeal-after-cycles-stolen-from-Didcot-Parkway-station-1923.aspx):

Quote
CCTV released: Police appeal after cycles stolen from Didcot Parkway station

British Transport Police (BTP) is appealing for information after two cycles were stolen from Didcot Parkway station.

Officers are also releasing CCTV images of a group of men they would like to identify in connection with the incidents which took place on Tuesday, 17 January 2012.

PC Bob Burrowes, the officer investigating both incidents, said: ^The bikes were securely locked to the cycle rack at Didcot Parkway rail station by two local passengers early in the morning. When they returned to the station in the afternoon, they discovered the locks had been cut and their bikes had been stolen.^

Police have so far followed a number of leads including circulating the CCTV images on police intelligence sources, but to no avail so far.

PC Burrowes added: ^I am now appealing for the public^s help to identify these men. If you were at Didcot Parkway station or in the vicinity on the day and saw anything suspicious, I would urge you to get in touch.

^Unfortunately cycles are a popular target for thieves but there are several steps people can take to ensure their bikes are adequately marked and secured to help reduce the risk of becoming a victim of bike theft. The best thing to remember is to register your bike and also to ensure a solid lock is used to secure it. If a bike is adequately marked, it makes it much easier to identify and therefore reduces its desirability to thieves.^

BTP officers regularly conduct cycle crime awareness surgeries at stations to offer crime prevention advice and identify the top locations for bike theft each fortnight, targeting them through covert and overt policing operations to try and catch would-be offenders in the act.

Anyone who can name the men in the CCTV images should contact British Transport Police on 0800 40 50 40 quoting reference B9/LNA of 21/02/2012. Alternatively, contact the independent charity Crimestoppers on 0800 555 111.



Edit note: Images now removed due to expiry of copyright permission. CfN


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: Chris from Nailsea on April 18, 2012, 21:20:51
From the Oxford Mail (http://www.oxfordmail.co.uk/news/9653386.Forecourt_work_is_back_on_track/):

Quote
Forecourt work is back on track

(http://www.oxfordmail.co.uk/resources/images/1974137/?type=articleLandscape)

A ^6.7m project to revamp the forecourt at Didcot Parkway railway station is back on track after a year of delays.

Improvement work, first outlined in 2001, was originally due to start in March last year, but was postponed following safety assessments carried out by landowners Network Rail. In October 2011 another start date was postponed.

Demolition work finally started last week at the site off Station Road and the project is due to be completed late next year, in advance of the ^125m extension of the Orchard Shopping Centre.

The transport hub is being reorganised to make it easier and safer for cars, buses, cyclists, taxis and pedestrians to use. Disused buildings in the west car park are being demolished to create a temporary car park, paving the way for construction work to begin in the autumn.

Town council leader Margaret Davies said: ^This is excellent news and when people saw the work starting last week it caused quite a buzz. Hopefully the work will be finished before phase two of the shopping centre is completed. The scheme will also mean an end to the flooding of the station subway as work is being carried out to pump the water away under Cow Lane bridge.^

Oxfordshire County Council is providing the bulk of the funding.

Didcot county councillor Bill Service said: ^This is a significant investment and once it is completed it will be a major improvement. A lot of people living on the Ladygrove estate commute and every day you see the march from Cow Lane bridge to the station.^

The new temporary car park should be ready in the summer and will be in use for 18 months. During the first phase of work, there will be temporary traffic lights in Station Road from 9.30am to 4pm.

First Great Western spokesman John Ratchford said: ^We^re delighted the work is under way, and pleased we can work in partnership with Oxfordshire County Council and South Oxfordshire District Council.^

Didcot Chamber of Commerce president Julia Williams said: ^This is excellent news for the local economy. The forecourt needed tidying up to make it less confusing in terms of where pedestrians and other users are directed, and this is a good opportunity to create new signs showing the way to the town centre.^

TIMELINE...

2001: Plans for a new transport hub put forward in feasibility study.

2009: Oxfordshire County Council announces ^5.4m plan to revamp forecourt.

2010: Contract for ^5.7m scheme goes out to tender.

2011: ^5.7m scheme scheduled to start in February gets delayed six months and then postponed again.

2012: Work starts on ^6.7m scheme, due to finish at end of 2013.



Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: Temple Meads on April 18, 2012, 22:36:24
I can't see how they can install a gateline at Didcot, unless they give an NR ticket to everyone who wants access to the railway centre, as it'd be a lot of manual swipes for the gateline assitant otherwise  ;D

It's that or building a super-duper new entrance for the centre I feel.


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: Chris from Nailsea on August 31, 2012, 13:09:59
From the FGW press release:

Quote
A new station manager and a new future for Didcot Parkway

First Great Western is delighted to announce ^2 million improvements works to Didcot Parkway Station have now started.

This includes upgrading the ticket office and station concourse and the installation of ticket gates. In addition to the ^2 million improvements to the booking hall, Oxfordshire County Council will be creating a new modern forecourt, which will be safer and easier to use.

The improvements will mean a smarter, more welcoming environment in keeping with Didcot^s status as a key station on the Great Western main line.

Dave Martin, the new Station Manager at Didcot Parkway, said: ^Let me first say hello, and how delighted I am to be taking over as Station Manager.

^At First Great Western we recognise our role in the communities we serve. These improvement works will ensure that Didcot Parkway continues to provide the services and environment our customers require.

^Every effort will be made to reduce inconvenience caused by the work, but if you have any queries or comments please speak to me or a member of our staff.^

The improvements works began on Friday 31 August, with the ticket office upgrade due to be completed in 12 weeks. Work on the forecourt will start in September with the closure of the lower level East car park.

A temporary ticket office has been set up while we make the improvements. There will be no change to opening hours, and the office will be fully staffed. Ticket Vending Machines will also be moved but will remain available for use.

Customers wishing to seek more information can do so either by speaking with a member of staff or by telephoning 08457 000 125.


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: didcotdean on September 05, 2012, 13:19:44
They have been cracking on with the work - there was nothing visible last Friday, then when I came back on Saturday most of the booking hall was boarded off and work had started demolishing the old ticket office.

One of the ticket machines is currently inaccessible behind the works. The machine outside has never reliably dispensed tickets bought over the internet so there is only one machine left which is therefore rather popular (and was out of order when I came back on Saturday). There weren't any additional machines in the temporary office in the car park on Friday, but there may be by now.


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: Andrew1939 from West Oxon on September 05, 2012, 16:55:01
At long last! Why does it take so long to get investment projects off the starting blocks?

A friend of mine has a son who lives in Brisbane (Aus) but who came back home to work for 18 months. He said that when he left Brisbane there was a proposal to extend the suburban rail network nearer to his home. When he returned after 18 months it had been built aznd was in operation.

Then look at Chilterns modest proposal to upgrade the Oxford/Bicester line and construct a chord to link it to their main line to Marylebone. Proposed years ago but the enquiries and red tape seem to get longer and longer. Its no wonder that rail projects cost so much with many GRIP studies in ever increasing detail taking years to prepare and needed before you can even seek finance for a project.


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: FremlinsMan on October 04, 2012, 21:38:30
Barriers were in place this evening, but not operational yet. (In fact, they might have been installed much earlier, as this evening was my first visit to the station since last Friday).


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: ray951 on October 05, 2012, 08:59:11
Barriers were in place this evening, but not operational yet. (In fact, they might have been installed much earlier, as this evening was my first visit to the station since last Friday).

They have been there since at least Tuesday.

Still not clear how they wil stop passengers going straight to P1 via the outside ramp (required for people with bikes, luggage,etc. as no lift), or using the side entrance or going to the Railway Centre.


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: didcotdean on October 05, 2012, 10:24:53
The current ramp is going to be replaced by an accessible route to platform 1 built to modern standards according to the leaflet on the works I picked up in the station, although exactly what this will be or where was not detailed further. Not clear what access will remain at the end of platform 1 near the bridge to the Foxhall Car park either.

The town council didn't manage to get the station renamed to Didcot either from the artist's impression of the new large sign to be put on what will become the bus entrance on Station Road.


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: gwr2006 on October 06, 2012, 21:52:48
The existing gates on platform 1 (at the far end for the Foxhall Car Park, and into the East Car Park) will be closed when First Great Western bring the ticket barriers into use.  Ticket barriers will also be put at the top of the ramp on platform in the next few weeks.

The ramp to platform 1 itself will be rebuilt next year as part of the major county council project to improve the forecourt.

The only exit from platform 1 will be either through the subway and the main building, or down the ramp - both controlled by ticket barriers in future.

Hope that helps to clear up any confusion.


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: didcotdean on October 07, 2012, 21:03:38
A long hike round for those in arriving in coach A on platform 1 for the Foxhall car park then. Not quite what I would have had in mind as a station 'improvement'.


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: Oxman on October 08, 2012, 16:06:52
Visitors to the Railway Centre will be required to buy a ticket, for ^1, that will allow them though the barriers. When they present the ticket at the Railway Centre admission kiosk, the pound will be taken off the admission price. Presumably, FGW will transfer the money it takes on this to the Railway Centre.


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: Chris from Nailsea on November 16, 2013, 21:19:11
From the First Great Western press release:

Quote
FGW staff raffle ^1,000 of prizes for Children in Need

First Great Western staff at Didcot Parkway station are to give away over ^1,000 in prizes as the team raise money for Children in Need.

Dressed in full costume, the station team aims to raise funds for Pudsey and friends from Friday 15 through to Sunday 17 November.

From an iPad Mini to Chelsea football tickets, over ^1,000 of raffle prizes will be given away, while cup cakes will be on sale for ravished passengers. Tickets will be drawn out of a hat on Monday 18 November and winners notified.


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: JayMac on November 16, 2013, 21:59:43
"ravished passengers"  ???

Who's doing the ravishing, and is that for charity as well?  :P ;) ;D

Ravish. verb:
1. To seize and carry away by force.
2. To overwhelm with emotion; enrapture.

There's another, more sinister, definition, and I really hope that FGW aren't going to do that to their passengers.::)


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: Chris from Nailsea on November 16, 2013, 22:10:01
I merely quote verbatim the press releases which First Great Western send me. (http://www.msn101.com/content/emoticons/whistle_EHWYHS.gif)


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: JayMac on November 19, 2013, 15:25:55
According to FGW's Facebook and Twitter pages, the FGW team at Didcot Parkway raised a total of ^3324.43 for Children in Need.

https://twitter.com/FGW/status/402811566762246144

Well done!  ;D




Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: Chris from Nailsea on November 30, 2013, 00:46:47
From the British Transport Police press release (http://www.btp.presscentre.com/Media-Releases/CCTV-released-Appeal-continues-after-violent-disorder-at-Didcot-Parkway-station-24b5.aspx):

Quote
CCTV released: Appeal continues after violent disorder at Didcot Parkway station

British Transport Police (BTP) detectives are appealing for information after violent disorder at Didcot Parkway station left a man with cuts to his head.

Investigators have released images of six people they would like to speak to in connection with the incident, which took place on Tuesday, 22 October.

(http://www.btp.presscentre.com/imagelibrary/displaymedia.ashx?MediaDetailsID=12220&SizeID=2) (http://www.btp.presscentre.com/imagelibrary/displaymedia.ashx?MediaDetailsID=12221&SizeID=2) (http://www.btp.presscentre.com/imagelibrary/displaymedia.ashx?MediaDetailsID=12222&SizeID=2) (http://www.btp.presscentre.com/imagelibrary/displaymedia.ashx?MediaDetailsID=12223&SizeID=2) (http://www.btp.presscentre.com/imagelibrary/displaymedia.ashx?MediaDetailsID=12224&SizeID=2) (http://www.btp.presscentre.com/imagelibrary/displaymedia.ashx?MediaDetailsID=12225&SizeID=2)

Detective Constable Chris Church, the investigating officer, said: ^Around 11pm, an altercation began between a group of men and women that had been travelling on a train between Reading and Didcot Parkway. As the train arrived at Didcot Parkway station, words were exchanged between the two groups and a fight took place on the platform. During the assault, a 19-year-old man was hit over the head with a bottle causing a cut to his head.^

BTP officers were alerted and spoke to several witnesses at the scene. An investigation was launched and detectives have today released CCTV images of six people they would like to speak to.

DC Church added: ^This was violent disorder between two groups of people and we are appealing for information from witnesses to help build a picture of exactly what took place. We believe there were people who were waiting at Didcot Parkway station when the train arrived, and who were also involved in the altercation. If you recognise the people pictured, or have key information which you think could assist officers, I^d urge you to come forward.^

Anyone with information is asked to contact British Transport Police on 0800 40 50 40 quoting background reference LNA/B2 of 19/11/2013. Information can also be passed to the independent charity Crimestoppers, anonymously, on 0800 555 111.


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: didcotdean on June 18, 2014, 17:39:06
Last stage of the Didcot Parkway forecourt improvements finds buried asbestos and with other ground difficulties pushes the cost cost up by an additional ^1.3M. Herald series article. (http://www.heraldseries.co.uk/news/hsdidcotnews/11281293.Didcot_Parkway_costs_rise_after_asbestos_discovered/)

I presume the covered walkway that isn't going to happen is that seen all over the impressions on the front of the project's website.


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: didcotdean on July 07, 2014, 10:35:22
The Growth Deal money for Oxfordshire announced today includes provision to increase car parking at Foxhall Road by building a 'deck access car park'.

The remaining aspirations for Didcot as I recall were to have pedestrian access from the north of the railway, and to open a platform on the 'avoiding' line. The first may be funded out of some development 'pot' but the latter would need to come from the railway in some form, and I can't see that happening soon.


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: DidcotPunter on July 07, 2014, 13:03:24
The Growth Deal money for Oxfordshire announced today includes provision to increase car parking at Foxhall Road by building a 'deck access car park'.

The remaining aspirations for Didcot as I recall were to have pedestrian access from the north of the railway, and to open a platform on the 'avoiding' line. The first may be funded out of some development 'pot' but the latter would need to come from the railway in some form, and I can't see that happening soon.

Detail here, pages 20-22:

https://www.oxfordshire.gov.uk/cms/sites/default/files/folders/documents/communityandliving/ourworkwithcommunities/Localtransportboard/04032014DetailedAssessment.pdf

I saw the plans for an additional deck at the Foxhall car park a couple of years ago, they covered the eastern end of the car park but not the western.

On the additional platforms, it seems that the plan is to locate these to the north of platform 5 as an additional island platform where the eastern exit from the sidings currently lies.

The following two pages consider four-tracking Didcot-Oxford (likely to be too expensive) and what looks like a comprehensive rebuild of the station.


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: didcotdean on July 07, 2014, 14:55:59
To illustrate the time span, the northern entrance and extra platform have been knocking around as proposals for over 10 years; the entrance possibly as much as 20 years.


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: DidcotPunter on July 07, 2014, 17:02:32
And will probably be knocking around in another 10  :D


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: Chris from Nailsea on July 15, 2014, 11:17:34
From the First Great Western press release:

Quote
First Great Western welcomes ^9.5m Growth Fund allocation for Didcot Parkway car park upgrade

Train operator First Great Western has welcomed the allocation of ^9.5 million towards a new multi-storey car park and covered walkway at Didcot Parkway station, as part of funding from the Government^s Local Growth Fund.

The funding will help realise the first stages of a 10-year masterplan for improvements to the station that has been drawn up between First Great Western, OxLEP, Oxfordshire County Council and South Oxfordshire District Council. The plan details the expansion and improvement of the station, as a key gateway to Science Vale and Enterprise Zone, to better meet the needs of passengers and the communities it serves.

First Great Western Managing Director, Mark Hopwood said: ^We have been working with the local authorities and LEP for some time to draw together our ten-year vision for the station, and today^s announcement is a key stage in the realisation of that vision. The Great Western rail network is seeing more than ^7.5 billion of investment over the coming years, and it is great to see local communities seizing this as an opportunity to help harness further funding that will directly benefit the local economy.

^FGW has recently delivered a 710-space multi-storey car park at Bristol Parkway on time and on budget for the Department for Transport. We look forward to working with our partners to secure the balance of funding needed and finalise arrangements for the creation of a similar facility at Didcot.^


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: ChrisB on July 15, 2014, 11:33:12
Oxfordshire County Council have a meeting at Didcot Cornerstone Centre this evening to introduce their new Local Transport PLan revision 4, from 7pm to 8.30. Sure this will get a mention....


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: Chris from Nailsea on August 28, 2014, 20:34:19
From the Oxford Mail (http://www.oxfordmail.co.uk/news/11435679.___Rail_station_revamp_offers_a_better_welcome_to_Didcot___/):

Quote
^Rail station revamp offers a better welcome to Didcot^

(http://www.oxfordmail.co.uk/resources/images/3225827/?htype=0)
Taking shape: The revamp of Didcot Parkway railway station as work nears an end

Completion of an ^8m scheme to redevelop the forecourt at Didcot Parkway rail station is set to be completed in the next fortnight.

The transport hub, the county^s busiest station after Oxford, has been reorganised to make it safer for cars, buses, cyclists, taxis and pedestrians to use.

Town councillor Margaret Davies said: ^People in Didcot have been very patient. When they started work in 2012 the estimated finishing date was September 2013, but with such a major project you can expect some delay.^

Work on the new interchange will be completed in the next fortnight, according to Didcot West county councillor Nick Hards.

A new sign has just gone up to welcome commuters and other visitors to the station^s transport interchange and Mr Hards said contractor Birse was now putting the finishing touches to the scheme.

He added: ^I expect the forecourt to be complete in the next fortnight. It^s all looking very impressive and it will be a much better welcome to Didcot. There will be some resurfacing work on Station Road in October but that should be everything. I would like to see some maps go up showing visitors where everything is in Didcot, including the Cornerstone Arts Centre. There are plans for a new hotel on the Didcot island site opposite the station and that would be another big improvement.^

Demolition work started on the forecourt in April 2012 and the scheme is nearing completion despite the discovery in June of buried asbestos, which increased the total cost of the scheme by ^1.3m.

Dave Pryor, of Pryors Taxis in Didcot, said: ^It has been quite chaotic over the past couple of years but we are due to have a completed station any day now ^ they are just finishing it off. Buses will move into the central section ^ it^s imminent and will be a big improvement. A new taxi rank with a bigger capacity has been running since April.^

The station is owned by Network Rail and run by First Great Western (FGW) but Oxfordshire County Council has provided most of the funding as the highways authority. Work inside the station, including the renovation of the ticket office, has been completed by First Great Western and Network Rail.

FGW spokesman James Davis added that a scheme to deck parking areas in the Foxhall Road car park behind the station, backed by City Deal funding from central government, was due to be carried out at a date to be fixed.

A scheme to redesign the forecourt at Didcot Parkway was first mooted in 2001. It was not until 2011 that Oxfordshire County Council was ready to go ahead with the current scheme, but the start date was put back twice while First Great Western and Network Rail made sure all the correct paperwork was in place.

Some 2.8m passengers used the station in 2012/2013.

The scheme had an extra ^1.3m added to its budget, bringing it to ^8m, after asbestos was found.

Work started in September 2012, and was expected to be finished within a year, but various delays put back the construction by a year, including unexpected problems with ground conditions.


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: FremlinsMan on August 28, 2014, 20:57:05
Buses moved back to using the extended central section (i.e. outside the station forecourt) Tuesday or yesterday. This means that buses are now completely separated from buses and private cars, which always used to be a problem (most evenings were bad, Fridays particularly so),

From the Oxford Mail (http://www.oxfordmail.co.uk/news/11435679.___Rail_station_revamp_offers_a_better_welcome_to_Didcot___/):

Quote
^Rail station revamp offers a better welcome to Didcot^

(http://www.oxfordmail.co.uk/resources/images/3225827/?htype=0)
Taking shape: The revamp of Didcot Parkway railway station as work nears an end

Completion of an ^8m scheme to redevelop the forecourt at Didcot Parkway rail station is set to be completed in the next fortnight.

The transport hub, the county^s busiest station after Oxford, has been reorganised to make it safer for cars, buses, cyclists, taxis and pedestrians to use.

Town councillor Margaret Davies said: ^People in Didcot have been very patient. When they started work in 2012 the estimated finishing date was September 2013, but with such a major project you can expect some delay.^

Work on the new interchange will be completed in the next fortnight, according to Didcot West county councillor Nick Hards.

A new sign has just gone up to welcome commuters and other visitors to the station^s transport interchange and Mr Hards said contractor Birse was now putting the finishing touches to the scheme.

He added: ^I expect the forecourt to be complete in the next fortnight. It^s all looking very impressive and it will be a much better welcome to Didcot. There will be some resurfacing work on Station Road in October but that should be everything. I would like to see some maps go up showing visitors where everything is in Didcot, including the Cornerstone Arts Centre. There are plans for a new hotel on the Didcot island site opposite the station and that would be another big improvement.^

Demolition work started on the forecourt in April 2012 and the scheme is nearing completion despite the discovery in June of buried asbestos, which increased the total cost of the scheme by ^1.3m.

Dave Pryor, of Pryors Taxis in Didcot, said: ^It has been quite chaotic over the past couple of years but we are due to have a completed station any day now ^ they are just finishing it off. Buses will move into the central section ^ it^s imminent and will be a big improvement. A new taxi rank with a bigger capacity has been running since April.^

The station is owned by Network Rail and run by First Great Western (FGW) but Oxfordshire County Council has provided most of the funding as the highways authority. Work inside the station, including the renovation of the ticket office, has been completed by First Great Western and Network Rail.

FGW spokesman James Davis added that a scheme to deck parking areas in the Foxhall Road car park behind the station, backed by City Deal funding from central government, was due to be carried out at a date to be fixed.

A scheme to redesign the forecourt at Didcot Parkway was first mooted in 2001. It was not until 2011 that Oxfordshire County Council was ready to go ahead with the current scheme, but the start date was put back twice while First Great Western and Network Rail made sure all the correct paperwork was in place.

Some 2.8m passengers used the station in 2012/2013.

The scheme had an extra ^1.3m added to its budget, bringing it to ^8m, after asbestos was found.

Work started in September 2012, and was expected to be finished within a year, but various delays put back the construction by a year, including unexpected problems with ground conditions.


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: ChrisB on August 29, 2014, 11:20:12
This means that buses are now completely separated from buses and private cars, which always used to be a problem (most evenings were bad, Fridays particularly so),

I guess you mean Taxis & cars?


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: FremlinsMan on August 30, 2014, 20:49:39
This means that buses are now completely separated from buses and private cars, which always used to be a problem (most evenings were bad, Fridays particularly so),

I guess you mean Taxis & cars?

Yes!  :-[


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: didcotdean on August 30, 2014, 22:13:30
Some people in cars haven't got used to not being able to drop people off directly in front of the station as they used to and are therefore driving into the now bus only area. Hopefully the habit will be broken before too long.


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: bobm on August 31, 2014, 09:18:39
It certainly is an improvement for bus users

(http://www.mbob.co.uk/rforum/didnew1.jpg)

There are properly defined bays - and more stops.  It was always a bit of scrum there, particularly as buses going in both directions on the same route call at the station leading to some confusion on occasions.

(http://www.mbob.co.uk/rforum/didnew2.jpg)

The dropping off point is now to the left of the station entrance - and popular with cyclists too!

Still a little bit of finishing off to do - but certainly a much better layout.

(http://www.mbob.co.uk/rforum/didnew3.jpg)


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: TeaStew on September 02, 2014, 11:29:36
Some people in cars haven't got used to not being able to drop people off directly in front of the station as they used to and are therefore driving into the now bus only area. Hopefully the habit will be broken before too long.

Reminds me of when they redid the Chippenham station forecourt/parking/whatever you want to call it - made it a bus and taxi only one way loop up to the front doors where people used to be able to drive up pretty much however they pleased. Saw lots of cars not knowing/not reading to begin with but now 8 years on(ish? About 2006 I think it happened) I rarely see one. I think it dropped off fairly rapidly if I recall correctly.

Looks nice though, I do like a bit of nice new paving.  ;D


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: grahame on September 02, 2014, 11:46:48
Reminds me of when they redid the Chippenham station forecourt/parking/whatever you want to call it - made it a bus and taxi only one way loop up to the front doors where people used to be able to drive up pretty much however they pleased. Saw lots of cars not knowing/not reading to begin with but now 8 years on(ish? About 2006 I think it happened) I rarely see one. I think it dropped off fairly rapidly if I recall correctly.

The 20 minute / railway business parking at Chippenham is very close indeed and much better to use than trying to drop people off on the loop would be - an excellent example of a carrot rather than a stick, and I'm not surprised at the rapid uptake of the facilities when they were added.   As a previously-regular, now-occasional user of the pick up / drop off facilities there, it's just as quick (even in a rush for a train) to go into the new area, and the driver can help into the station / with ticketing and luggage up and over. 


Title: Re: Didcot Parkway - timetable changes, incidents, barriers and forecourt improvements
Post by: didcotdean on September 02, 2014, 15:49:11
The short term / pick up car parking in the west car park of Didcot is considerably more than there used to be under the previous arrangements but the covered way to the station building which was part of the original scheme has not been done, as mentioned earlier, as a result of cost overrun. This may now happen in the next upgrade scheme though.




This page is printed from the "Coffee Shop" forum at http://gwr.passenger.chat which is provided by a customer of Great Western Railway. Views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that content provided contravenes our posting rules ( see http://railcustomer.info/1761 ). The forum is hosted by Well House Consultants - http://www.wellho.net