Journey by Journey => Plymouth and Cornwall => Topic started by: grahame on November 05, 2014, 18:47:33



Title: Two week closure at Hayle, 8th to 23rd November
Post by: grahame on November 05, 2014, 18:47:33
From Saturday 8 November to Sunday 23 November inclusive, Network Rail will be carrying out essential
repair work to Hayle Viaduct with the line being blocked between Truro and St Erth. 
To the West of the possession, a Penzance ^ St Ives shuttle will operate.
To the East, HSS and West services will terminate/start back from Truro.


Title: Re: Two week closure at Hayle, 8th to 23rd November
Post by: JayMac on November 05, 2014, 19:40:23
It would appear, during this period, that the down Sleeper is terminating at Plymouth around 0515, with a bus (or coach) from there at 0530 for Redruth and beyond and a train calling at usual Sleeper stops to Truro at 0550.

The up Sleeper will start from Truro at 2255, with a bus departing Penzance at 2125 calling at usual Sleeper stops to connect into it at Truro.

I guess that servicing and preparing of the Sleeper sets will take place at Laira whilst access to Long Rock is unavailable.


Title: Re: Two week closure at Hayle, 8th to 23rd November
Post by: old original on November 06, 2014, 15:57:25
...also on Sundays 9th & 16th November the Falmouth service will be road replacement and all mainline services will arrive and depart from the Down platform (2) ..and the up sleepers will start at Plymouth.


Title: Re: Two week closure at Hayle, 8th to 23rd November
Post by: phile on November 06, 2014, 16:09:27
It would appear, during this period, that the down Sleeper is terminating at Plymouth around 0515, with a bus (or coach) from there at 0530 for Redruth and beyond and a train calling at usual Sleeper stops to Truro at 0550.

The up Sleeper will start from Truro at 2255, with a bus departing Penzance at 2125 calling at usual Sleeper stops to connect into it at Truro.

I guess that servicing and preparing of the Sleeper sets will take place at Laira whilst access to Long Rock is unavailable.

All trains, in effect, as well as the Beds which would be starting at Truro.    There are ECS from Par to Truro for starters.


Title: Re: Two week closure at Hayle, 8th to 23rd November
Post by: SandTEngineer on November 16, 2014, 13:28:05
Half way through the blockade now. Photographs of the work on Hayle Viaduct can be found here: http://www.cornwallrailwaysociety.org.uk/newspage---latest-news-reports-and-photographs/archives/11-2014



This page is printed from the "Coffee Shop" forum at http://gwr.passenger.chat which is provided by a customer of Great Western Railway. Views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that content provided contravenes our posting rules ( see http://railcustomer.info/1761 ). The forum is hosted by Well House Consultants - http://www.wellho.net