Great Western Coffee Shop

Journey by Journey => TransWilts line => Topic started by: grahame on August 16, 2018, 08:33:32



Title: Issues south of Westbury
Post by: grahame on August 16, 2018, 08:33:32
Not sure where to post / start this thread - but as the board title claims "Swindon, Chippenham, Melksham, Trowbridge, Westbury, Dilton Marsh, Warminster and Salisbury" I'll put it under TransWilts.

TransWilts IS about travel right across Wiltshire north to south, even though concentration in recent years has been on getting the improved (but still infrequent) service from Swindon to Westbury up to a marketed, used, reliable, permanent fixture.    The 05:17 from Gloucester and the 17:41 from Cheltenham Spa already carry on to Salisbury and Southampton from Westbury, and off the other trains that terminate at Westbury you'll see a flow of passengers change off the arrival from Swindon onto trains that carry on via Warminster (and also to other trains).

So ... posting here logs and significant issues south of Westbury on the local trains.

Quote
05:17 Gloucester to Southampton Central due 08:09
05:17 Gloucester to Southampton Central due 08:09 will be terminated at Salisbury.
It will no longer call at Romsey and Southampton Central.
It has been delayed at Westbury and is now 25 minutes late.
This is due to train crew being delayed.

There's quite a flow Trowbridge to Warminster / Salisbury on that train, a big connectional flow at Salisbury into the Andover / Basignstoke / Waterloo connection.  And quite a bit of use into Southampton where a significant number of commuters disembark.  Not a lot of happy chappies this morning - but at least the school flow is on summer holibobs!


Title: Re: Issues south of Westbury
Post by: SandTEngineer on August 16, 2018, 10:01:34
OK I'll own up.  Had to look up that word HOLIBOBS.  Never heard it before (must be a generation thing :D ).


Title: Re: Issues south of Westbury
Post by: grahame on October 21, 2018, 08:19:54
Quote
08:47 Warminster to Cardiff Central due 10:45
08:47 Warminster to Cardiff Central due 10:45 will be started from Westbury.
It will no longer call at Warminster and Dilton Marsh.
This is due to engineering works not being finished on time.

Grrrrr ... only two hours to the next train.   The one was new the year and has been bullding well - let's hope that road replacement from Warminster and Dilton Marsh are provided and connect with the ongoing train, and the Weymouth train too, at Westbury.


Title: Re: Issues south of Westbury
Post by: phile on October 21, 2018, 10:34:00
Quote
08:47 Warminster to Cardiff Central due 10:45
08:47 Warminster to Cardiff Central due 10:45 will be started from Westbury.
It will no longer call at Warminster and Dilton Marsh.
This is due to engineering works not being finished on time.

Grrrrr ... only two hours to the next train.   The one was new the year and has been bullding well - let's hope that road replacement from Warminster and Dilton Marsh are provided and connect with the ongoing train, and the Weymouth train too, at Westbury.

GWR Journey Check later confirms Road Transport provided


Title: Re: Issues south of Westbury
Post by: Adelante_CCT on October 21, 2018, 18:16:40
Quote
let's hope that road replacement from Warminster and Dilton Marsh are provided and connect with the ongoing train

Connection wasn't held but the next service was 47 minutes later, and by the time the bus would have arrived I'm guessing it wouldn't have been to a longer wait



This page is printed from the "Coffee Shop" forum at http://gwr.passenger.chat which is provided by a customer of Great Western Railway. Views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that content provided contravenes our posting rules ( see http://railcustomer.info/1761 ). The forum is hosted by Well House Consultants - http://www.wellho.net