From the Network Rail Media Centre (https://www.networkrailmediacentre.co.uk/news/work-this-summer-set-to-bring-improved-reliability-to-severn-beach-passengers)

Quote
Network Rail is carrying out vital maintenance work on the Severn Beach line in Bristol during July and August with work starting this weekend to ensure the continued safe and smooth running of the railway.

The upgrade also means that any future maintenance work in the area will cause less disruption for passengers.

The work involves:

* Removing a set of redundant points near Clifton Down station. Points guide trains onto the right route at junctions, however in this case the points are no longer required and will be replaced with straight track

* Renewing the Avonmouth Dock level crossing at West Town Road by upgrading the surface and replacing the tarmac either side of the crossing

* Installing new track between St Andrews Road level crossing and Avonmouth station

The work is being completed over a mixture of weekday nights, Saturday nights and Sunday daytime shifts between Saturday 6 July and Saturday 10 August, with some follow up work in September

As a result of these upgrades, buses will replace trains on three Sundays including 7 and 28 July as well as 4 August.

To keep residents updated Network Rail will be hosting a community drop-in session from 4.30pm to 7pm on Wednesday 17 July at the Avonmouth Community Centre, BS11 9EN.

This would seem to be a good opportunity to do any work at Portway Parkway which requires a possession.


Title: Re: Network Rail - work on Severn Beach line, summer 2019
Post by: johnneyw on July 05, 2019, 17:59:31
That might have been useful but I doubt the opportunity will be realised as there isn't really much time until then and there's been no announcement of any work to be started shortly at Portway.

I was curious about whether the whole line required a possession for the track replacement or only the Avonmouth to SB stretch but I am guessing that a lot of the materials involved (rails, ballast etc) will be brought in/taken away by rail not road.


Title: Re: Network Rail - work on Severn Beach line, summer 2019
Post by: Adrian on July 05, 2019, 20:42:47
Why the over-use of this word "upgrade" (and, for that matter, "improvement works") seemingly whenever NR do routine replacements?
An upgrade surely means that something will be made tangibly better from a user's perspective?


Title: Re: Network Rail - work on Severn Beach line, summer 2019
Post by: johnneyw on July 05, 2019, 21:29:27
Why the over-use of this word "upgrade" (and, for that matter, "improvement works") seemingly whenever NR do routine replacements?
An upgrade surely means that something will be made tangibly better from a user's perspective?

The stretch between Avonmouth and St Andrews Road is still a bit bone shaking (it was worse) but I thought that was fun. Smoothing the way may make it a little more comfortable and may allow for going a little faster but I don't know if I'll treat it as an improvement. 😐


Title: Re: Network Rail - work on Severn Beach line, summer 2019
Post by: Red Squirrel on July 06, 2019, 12:56:28
Very intrigued to know which set of points they plan to remove...


Title: Re: Network Rail - work on Severn Beach line, summer 2019
Post by: JayMac on July 06, 2019, 22:40:08
Very intrigued to know which set of points they plan to remove...

Me too. I'm not aware of any redundant points near Clifton Down.


Title: Re: Network Rail - work on Severn Beach line, summer 2019
Post by: martyjon on July 06, 2019, 22:48:52
Very intrigued to know which set of points they plan to remove...

Me too. I'm not aware of any redundant points near Clifton Down.


Might be that trap point in the tunnel which has been clipped and padlocked ever since the line was singled.


Title: Re: Network Rail - work on Severn Beach line, summer 2019
Post by: rich0099 on July 08, 2019, 08:19:30
I'm quite glad the sleepers are being replaced between AVN and SAR - Every evening on the way home I peer down and see them in a terrible state of disrepair.

I know all of you know far more about the rail infrastructure than I - but I'm curious - the curve/radius between AVN and the SAR Level crossing is quite tight (sorry - I don't know the technical term). When replacing the rail, would the curve of the rail be created on site - of would it be pre-shaped?

Sorry for such a noob question - I'm just interested.


Title: Re: Network Rail - work on Severn Beach line, summer 2019
Post by: stuving on July 08, 2019, 11:16:15
I'm quite glad the sleepers are being replaced between AVN and SAR - Every evening on the way home I peer down and see them in a terrible state of disrepair.

I know all of you know far more about the rail infrastructure than I - but I'm curious - the curve/radius between AVN and the SAR Level crossing is quite tight (sorry - I don't know the technical term). When replacing the rail, would the curve of the rail be created on site - of would it be pre-shaped?

Sorry for such a noob question - I'm just interested.

The answer is basically that rail is a lot more bendy than it looks. Rail is made in 216 m lengths (max, on latest info I have), and several taken to their installation site on a train - and it just bends to go round the corners. OK, there's a little more to it than that, like keeping all the rails vertical, but for the curvatures involved (that curve at AVN has a radius of about 200 m) it's not even very springy. Of course it is heavy, and the forces needed to lift and bend it are correspondingly large. Note that when talking about rail expansion, and buckling in the heat, the forces involved there (which are along the rail) are are very much bigger.


Title: Re: Network Rail - work on Severn Beach line, summer 2019
Post by: johnneyw on July 08, 2019, 11:17:00
I'm quite glad the sleepers are being replaced between AVN and SAR - Every evening on the way home I peer down and see them in a terrible state of disrepair.

I know all of you know far more about the rail infrastructure than I - but I'm curious - the curve/radius between AVN and the SAR Level crossing is quite tight (sorry - I don't know the technical term). When replacing the rail, would the curve of the rail be created on site - of would it be pre-shaped?

Sorry for such a noob question - I'm just interested.

I'm not a Permanent Way expert myself but while following the well blogged coverage of the rail laying on the Glos Warks Steam Railway extension, one of the noticeable things was how bendy the rails were when being unloaded on site from the flat wagons. These seemed to quite easily* fit into the pre laid sleepers just ahead, even on a bend.

*I say "quite easily" from the comfort of a sofa accompanied by a coffee and bun. Those working on the project may employ slightly different terminology.


Title: Re: Network Rail - work on Severn Beach line, summer 2019
Post by: Bmblbzzz on July 08, 2019, 18:04:18
I saw the rails being laid on the Filton Four Tracking and they looked quite bendy even in a vertical plane. I think they heat them, which presumably increases their flex?


Title: Re: Network Rail - work on Severn Beach line, summer 2019
Post by: Red Squirrel on July 08, 2019, 19:09:15
No heat involved in the laying process. This video shows how it's done on a modern railway: https://vimeo.com/109587564


Title: Re: Network Rail - work on Severn Beach line, summer 2019
Post by: Bmblbzzz on July 08, 2019, 20:48:18
Yep, that's the machine I saw.


Title: Re: Network Rail - work on Severn Beach line, summer 2019
Post by: paul7575 on July 08, 2019, 21:00:03
Remember new rail is flexible enough to be delivered on specialist trains, that can take normal track curvature during the journey from the manufacturer or welding plant. 

The delivery trains carry numerous rails at the same time, (up to 32 I think), but the rails can still flex from side to side and deal with changing gradients quite happily...

New rail for renewals of existing track is often delivered and pre-positioned between the ‘other’ running tracks, and a technique called thimbling, using a road rail machine attachment, is used to lift and position the new rail into the sleepers.  The following videos show how flexible the rail is as they lift it sideways a few metres, and also how quick they can do it:

https://youtu.be/mK1d-nscTsc

https://youtu.be/SupWOAddodw

Hope they are of interest...

Paul


Title: Re: Network Rail - work on Severn Beach line, summer 2019
Post by: rich0099 on July 09, 2019, 08:08:40
Thanks for everyone's input - much appreciated (knowledge is a wonderful thing).  :)



This page is printed from the "Coffee Shop" forum at http://gwr.passenger.chat which is provided by a customer of Great Western Railway. Views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that content provided contravenes our posting rules ( see http://railcustomer.info/1761 ). The forum is hosted by Well House Consultants - http://www.wellho.net