Title: Rail network enhancements pipeline
Post by: CyclingSid on October 16, 2019, 09:42:50
In case it hasn't been seen already "new" announcement from DfT:
https://www.gov.uk/government/publications/rail-network-enhancements-pipeline-autumn-2019-update (https://www.gov.uk/government/publications/rail-network-enhancements-pipeline-autumn-2019-update)
bit thin on detail, but I am sure more can be found elsewhere.


Title: Re: Rail network enhancements pipeline
Post by: ellendune on October 16, 2019, 19:27:53
Also in Railways and the Queen's speech thread.  Some merging?


Title: Re: Rail network enhancements pipeline
Post by: stuving on October 17, 2019, 19:47:19
Also in Railways and the Queen's speech thread.  Some merging?
Yes - I don't see any connection with the Queen's Speech.

DfT provide a link to "Network Rail's Enhancements Delivery Plan (EDP) for England and Wales", but when you land on their publications and resources page (https://www.networkrail.co.uk/who-we-are/publications-and-resources/) don't select "Our Delivery Plan for 2019-2024" - that's about delivering their own responsibilities, excluding the RNEP. (It does lead to the Scottish, undivided, delivery plan though.) Further down the page is the Enhancements Delivery Plan (https://cdn.networkrail.co.uk/wp-content/uploads/2019/10/CP6-Enhancements-Delivery-Plan_Sept-2019.pdf.pdf), with a list of projects currently being delivered. As the DfT report says, NR won't list them there until they have passed several decision gates: initiate-determine-develop-design-deliver.

At the moment the list doesn't have much in it - basically things started in CP5. The items with GWR relevance are:

CR001 Crossrail

Key Output 6a - Full Infrastructure Capability to support Crossrail Stage 4 operations with sufficient time for testing and trials                               May-20

Key Output 6b - Full Infrastructure Capability to support Crossrail Stage 5 operations (including Ilford and Romford Enhanced Stations) with sufficient time for testing and trials                  Dec-20
(The contract for those two stations was only let last month.)

W001a Great Western Electrification

Bristol Parkway to Cardiff                                        Nov-19*
Wootton Bassett Junction to Chippenham East   CP6*

W002b Great Western Capacity Enhancement Programme
                  Dec-19

The project provides infrastructure capacity enhancements to enable the delivery of the Intercity Express Programme. (Apparently the 4th platform at Bristol Parkway.)

WX003 Reading, Ascot to Waterloo train lengthening programme     Dec-19

Feltham Platform Extensions and Level Crossing Closure

IFDfT008 Gatwick Airport station                                        Nov-22

The project will provide a new station concourse above the existing station platforms with increased space for passengers and an improved connection to Gatwick Airport South Terminal via the NR footbridge. It will also include additional platform work, refurbishment of the existing station concourse and overbridges. The project will enable improved passenger access via new stairs and lifts, while it also aims to provide increased circulation space and a modern open plan ticket retailing hub.   

*Subject to change control


Title: Re: Rail network enhancements pipeline
Post by: ellendune on October 18, 2019, 22:18:33
W001a Great Western Electrification

Bristol Parkway to Cardiff                                        Nov-19*
Wootton Bassett Junction to Chippenham East   CP6*

*Subject to change control


I thought Wootton Bassett Junction to Chippenham East was already live and in service?


Title: Re: Rail network enhancements pipeline
Post by: stuving on October 18, 2019, 23:50:56
W001a Great Western Electrification

Bristol Parkway to Cardiff                                        Nov-19*
Wootton Bassett Junction to Chippenham East   CP6*

*Subject to change control


I thought Wootton Bassett Junction to Chippenham East was already live and in service?

The milestone for that was "EIS Infrastructure Authorised (Chippenham to Thingley)", so the project label of "Wootton Bassett Junction to Chippenham East" doesn't fit. In the last EDP of CP5, the project was still "Wootton Bassett Junction to Bristol Temple Meads", so it appears it's been carved up to make something to put in this new EDP. But chopped in the wrong place. 



This page is printed from the "Coffee Shop" forum at http://gwr.passenger.chat which is provided by a customer of Great Western Railway. Views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that content provided contravenes our posting rules ( see http://railcustomer.info/1761 ). The forum is hosted by Well House Consultants - http://www.wellho.net