Journey by Journey => Plymouth and Cornwall => Topic started by: GBM on February 08, 2022, 07:33:24



Title: Infrastructure issues in Cornwall - 2022 onwards
Post by: GBM on February 08, 2022, 07:33:24
From Journeycheck Delays to services between Taunton and Exeter St Davids
Due to a fault with the signalling system at Exeter St Davids some lines are closed. Disruption is expected until 09:15 08/02.
Train services between Taunton and Exeter St Davids may be delayed.
Additional Information
The track circuit which allows the signaller to safely see which trains are occupying different sections of track has failed at the western end of Exeter St David's station. This has locked a set of points into one position, meaning some trains can't switch between different tracks.

As a result, the number of available platforms at Exeter St David's that trains can use will be reduced from 6 to 2.

Services between Exeter Central & Barnstaple will start/terminate at Exeter St David's.

Services between Exmouth & Paignton will start/terminate and restart at Exeter St David's.


Title: Infrastructure issues in Cornwall - 2022 onwards
Post by: TonyK on February 08, 2022, 11:53:02

Services between Exeter Central & Barnstaple will start/terminate at Exeter St David's.


That's quite a truncation - only the first 3 minutes of 71!


Title: Infrastructure issues in Cornwall - 2022 onwards
Post by: grahame on February 08, 2022, 15:01:32

Services between Exeter Central & Barnstaple will start/terminate at Exeter St David's.


That's quite a truncation - only the first 3 minutes of 71!

Still very much worth flagging up - it may be only 4% of the journey time to many, but for those wishing to start their journey at Exeter Central and turning up at their usual time, it's 100% of the journey ruined.


Title: Infrastructure issues in Cornwall - 2022 onwards
Post by: GBM on February 14, 2022, 07:45:17
From Journeycheck
Delays to services between Truro and Par
Due to a fault with the signalling system between Truro and Par trains have to run at reduced speed on all lines.
Train services running through these stations may be delayed. Disruption is expected until 09:30 14/02.


Title: Infrastructure issues in Cornwall - 2022 onwards
Post by: GBM on February 14, 2022, 17:35:27
Delays to services between Truro and Par
Due to a fault with the signalling system between Truro and Par trains have to run at reduced speed on all lines.
Train services running through these stations may be delayed. Disruption is expected until the end of the day


Title: Infrastructure issues in Cornwall - 2022 onwards
Post by: RA on February 14, 2022, 18:12:42
Delays to services between Truro and Par
Due to a fault with the signalling system between Truro and Par trains have to run at reduced speed on all lines.
Train services running through these stations may be delayed. Disruption is expected until the end of the day

On investigating the fault, Network Rail have discovered that approximately 100 metres of signalling cable has been stolen.  >:(


Title: Infrastructure issues in Cornwall - 2022 onwards
Post by: GBM on February 15, 2022, 10:26:45
10:15 Truro to Falmouth Docks due 10:39
10:15 Truro to Falmouth Docks due 10:39 will be cancelled.
This is due to a broken down train earlier today.
(And return trip also cancelled).
12:15 Penzance to London Paddington due 17:29
12:15 Penzance to London Paddington due 17:29 will call additionally at Hayle, Lostwithiel, St Germans and Saltash.
This is due to a broken down train earlier today.

NOT a signalling issue, so wrong thread.
Could someone perhaps place this is an appropriate thread please!


Title: Infrastructure issues in Cornwall - 2022 onwards
Post by: GBM on March 17, 2022, 07:20:37
On journeycheck
Cancellations to services between St Austell and Truro
Due to attempted theft of signalling cables between St Austell and Truro fewer trains are able to run.
Train services running through these stations may be cancelled or delayed. Disruption is expected until 09:30 17/03.

A few cancellations so far.

Now extended to 10h30
Cancellations to services between St Austell and Truro
Due to attempted theft of signalling cables between St Austell and Truro fewer trains are able to run.
Train services running through these stations may be cancelled or delayed. Disruption is expected until 10:30 17/03.

Further extended
Cancellations to services between St Austell and Truro
Due to attempted theft of signalling cables between St Austell and Truro fewer trains are able to run.
Train services running through these stations may be cancelled or delayed. Disruption is expected until 12:30 17/03.

Are services running on radio authorisation to pass the next signal, etc from control.  Where is 'control' for the wilderness that is West of Liskeard?


Title: Infrastructure issues in Cornwall - 2022 onwards
Post by: GBM on March 17, 2022, 14:54:47
Cancellations to services between Plymouth and Penzance
Due to theft of signalling cables between St Austell and Truro fewer trains are able to run. Disruption is expected until the end of the day.
Train services between Plymouth and Penzance may be cancelled or delayed by up to 25 minutes.

Bet the delays wouldn't have been so bad in and around the Thames corridor.


Title: Infrastructure issues in Cornwall - 2022 onwards
Post by: GBM on April 04, 2022, 06:51:50
There was signalling cable theft (again) last week?
On today's journeycheck
Delays to services between Plymouth and Lostwithiel
Due to a fault with the signalling system between Plymouth and Lostwithiel trains have to run at reduced speed on all lines.
Train services running through these stations may be delayed by up to 30 minutes. Disruption is expected until 08:00 04/04.

OpenTrainTimes shows 1C50; 1C09 & 1C02 queuing towards Liskeard (Penzance bound).
1A73 at Liskeard (but RealTime Trains not confirming it's at Liskeard as yet).

 


Title: Infrastructure issues in Cornwall - 2022 onwards
Post by: GBM on April 04, 2022, 09:47:42
Cancellations to services between Plymouth and Lostwithiel
Due to a fault with the signalling system between Plymouth and Lostwithiel trains have to run at reduced speed on some lines towards Lostwithiel.
Train services running through these stations may be cancelled or delayed by up to 60 minutes. Disruption is expected until 10:00 04/04.

Much red on RealTime Trains (Departures from Liskeard)
https://www.realtimetrains.co.uk/search/detailed/gb-nr:LSK/2022-04-04/0805


Title: Infrastructure issues in Cornwall - 2022 onwards
Post by: GBM on April 04, 2022, 15:59:58
Didn't spot this later addition -
Delays to services between Bodmin Parkway and Liskeard
Following a fault with the signalling system between Bodmin Parkway and Liskeard all lines towards Lostwithiel are now open.
Train services running through these stations are returning to normal but some services may still be delayed. Disruption is expected until 22:00 04/04.


Title: Infrastructure issues in Cornwall - 2022 onwards
Post by: plymothian on April 05, 2022, 07:39:34
Yes, we are now on to the 3rd incidence of theft of signalling cables within the past month.


Title: Infrastructure issues in Cornwall - 2022 onwards
Post by: bradshaw on April 05, 2022, 08:07:31
On Journey Check this morning
Quote
   Due to the reported theft of signalling cables, services running through Cornwall will meet with delays in various locations between Truro and Saltash today.
There will be a reduction in services on the Cornwall mainline as a result today.



Title: Infrastructure issues in Cornwall - 2022 onwards
Post by: Timmer on April 05, 2022, 19:15:55
Not just cable theft. Drain cover theft in North Somerset:
https://www.northsomersettimes.co.uk/news/north-somerset-drain-cover-mystery-8806838

Quote
Residents have been asked to come forward with information after a series of gully covers have mysteriously disappeared across North Somerset.

Close to 40 drain covers are reported to be stolen from Nailsea, Wraxall and Wrington in a three day period.

North Somerset Council has called for CCTV or doorbell camera footage to be sent for use in an investigation.


Title: Infrastructure issues in Cornwall - 2022 onwards
Post by: GBM on April 06, 2022, 08:40:49
Delays between Par and Plymouth?  Not directly listed by journeycheck in line updates or train cancellations.
BUT.  Several runs listed as running late due to a signalling problem in other train service updates.
A few short runs; crews also late for branch line turns.


Title: Infrastructure issues in Cornwall - 2022 onwards
Post by: GBM on April 08, 2022, 08:19:22
And again.
Delays to services between St Austell and Par
Due to theft of signalling cables between St Austell and Par trains have to run at reduced speed on the line towards Plymouth.
Train services running through these stations may be delayed by up to 20 minutes. Disruption is expected until 11:00 08/04.


Title: Infrastructure issues in Cornwall - 2022 onwards
Post by: Timmer on April 08, 2022, 08:37:48
Looks like a pretty active gang is operating down in Cornwall. This must be the 4th incident in less than a month.


Title: Infrastructure issues in Cornwall - 2022 onwards
Post by: TaplowGreen on April 08, 2022, 08:41:17
Looks like a pretty active gang is operating down in Cornwall. This must be the 4th incident in less than a month.

Helps to fill in the time between tarmacing driveways.


Title: Infrastructure issues in Cornwall - 2022 onwards
Post by: GBM on April 08, 2022, 10:24:59
Now updated
Delays to services between St Austell and Par
Due to theft of signalling cables between St Austell and Par trains have to run at reduced speed on the line towards Plymouth.
Train services running through these stations may be delayed by up to 20 minutes. Disruption is expected until the end of the day.


Title: Infrastructure issues in Cornwall - 2022 onwards
Post by: GBM on April 11, 2022, 13:05:45
Slight disruption perhaps -
12:45 Truro to Falmouth Docks due 13:09
12:45 Truro to Falmouth Docks due 13:09 has been cancelled.
This is due to lightning damaging the signalling system.

(Return run also cancelled)


Title: Infrastructure issues in Cornwall - 2022 onwards
Post by: GBM on July 07, 2022, 07:37:25
Delays between Plymouth and Par with a signaller being taken ill.
A few trains cancelled, or terminated short.
Local radio reporting a relief signaller is on 'his' way.

Guessing a box would be switched out so why the cancellations I wonder.


Title: Infrastructure issues in Cornwall - 2022 onwards
Post by: bobm on July 07, 2022, 08:54:01
Initially no signaller to cover Lostwithiel box (with its associated crossing).


Title: Infrastructure issues in Cornwall - 2022 onwards
Post by: GBM on July 07, 2022, 09:11:45
Running now further disrupted.
09:05 Plymouth to Newquay due 10:49
09:05 Plymouth to Newquay due 10:49 will be started from Par.
It will no longer call at Plymouth, Saltash, St Germans, Liskeard and Bodmin Parkway.
This is due to a person hit by a train earlier.



This page is printed from the "Coffee Shop" forum at http://gwr.passenger.chat which is provided by a customer of Great Western Railway. Views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that content provided contravenes our posting rules ( see http://railcustomer.info/1761 ). The forum is hosted by Well House Consultants - http://www.wellho.net