Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 17:15 19 Apr 2024
- Mystery over woman's lying in road crash death
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
19th Apr (1938)
Foundation, Beatties of London (link)

Train RunningCancelled
16:23 London Paddington to Oxford
17:00 Greenford to West Ealing
18:00 Oxford to London Paddington
19:02 London Paddington to Bristol Temple Meads
19:23 London Paddington to Oxford
21:02 Oxford to London Paddington
Short Run
15:50 Penzance to Gloucester
16:31 Barnstaple to Axminster
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 19, 2024, 17:21:36 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[273] Rail to refuge / Travel to refuge
[84] Rail delay compensation payments hit £100 million
[36] Difficult to argue with e-bike/scooter rules?
[34] Signage - not making it easy ...
[7] IETs at Melksham
[6] Ferry just cancelled - train tickets will be useless - advice?
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
  Home Help Search Calendar Login Register  
  Show Posts
Pages: 1 ... 27 28 [29]
421  Journey by Journey / Bristol (WECA) Commuters / Re: Four track for Filton Bank - ongoing discussion on: November 13, 2018, 20:14:46
Is there any plans to alter the layout east of Bristol temple meads, I wonder as some signals were not replaced, only renumbered, while at the Plymouth end they were all renewed.

Its already been 'resignalled/recontrolled' from TVSC» (Thames Valley Signalling Centre - about) at Didcot, so nothing planned as far as I understand it.  Next and final stage is Bristol North Somerset Junction to Box Tunnel in April 2019.  Not sure if there are any CP6 (Control Period 6 - The five year period between 2019 and 2024) plans to close Bristol Panel and recontrol the remaining area to TVSC (or even Exeter ROC (Rail Operating Centre - a centralised location for railway signalling and train control operations for a specific route or region) thats being planned or at least talked about).

Of course, if the long mooted plan to reopen the Old Bristol Train Shed platforms comes to pass, then Bristol Panel will have to go as its in the way......

I had been told that a new I E C C. Was planned for Exeter to work to Penzance as TVSC Was now full.
422  Journey by Journey / Bristol (WECA) Commuters / Re: Four track for Filton Bank - ongoing discussion on: November 13, 2018, 19:44:07
Gloucester Area resignaling was originally scheduled for 2021, with susposed reverse time improvements buy up to 2 minutes.

Presumable achieved with quicker entry and exit speeds into the platforms?  IET (Intercity Express Train)'s will also see reversal time improvements over HST (High Speed Train) operated services as the cab is a couple of minutes quicker to set up.  We will see if the timetable planners take advantage of that next December I suppose.


When the IET Trains first ran into Gloucester they tried the 10 car ones and found that the platforms 1 and 2 were not long enough and had to then use platform 4. At the moment some 5 car and 9 car ones are used for now. Signals G58 and G133 on platform 2 needed to be moved slightly. I think they would be better off getting rid of platform 1 and moving to the top of platform 4. You would have two long ones plus a bay for swindon and Malvern turbos,


Is there any plans to alter the layout east of Bristol temple meads, I wonder as some signals were not replaced, only renumbered, while at the Plymouth end they were all renewed.
423  Journey by Journey / Bristol (WECA) Commuters / Re: Four track for Filton Bank - ongoing discussion on: November 13, 2018, 19:20:50
Gloucester Area resignaling was originally scheduled for 2021, with susposed reverse time improvements buy up to 2 minutes.

Was that the CP5 (Control Period 5 - the five year period between 2014 and 2019) plan or CP6 (Control Period 6 - The five year period between 2019 and 2024) plan?

Think it was under CP6.
424  Journey by Journey / Bristol (WECA) Commuters / Re: Four track for Filton Bank - ongoing discussion on: November 13, 2018, 13:56:35
The Up and Down Filton Mains were supposedly closed due to the weak condition of the former bridge over Stapleton Road, which for several years, had a permanent speed restriction over it.

To add to that: The River Froom/Frome used to run under the northern span of the old Stapleton Road viaduct, but was diverted when the M32 was built. I'm told that as the land dried out as a consequence of this, it did for the viaduct's foundations. Obviously they could have been fixed at the time, but this was the early 80's - no-one was planning for expansion; the future of the Severn Beach line was in doubt, and two tracks would just have to do.


Thanks for that, see it, say it, sorted.


Severn Beach is still there and in use.

One last thing for now as I have to go to Sainsburys, Are dispatch boxes now to be fitted on Bristol parkway and filton AW stations. This would be so staff would have the close door and right away function for trains.
425  Journey by Journey / Bristol (WECA) Commuters / Re: Four track for Filton Bank - ongoing discussion on: November 13, 2018, 13:40:44
BL1815 only has Position 1, 2 and 3 JUNCTION INDICATORS.  There has never been a main route from there to the UP FILTON RELIEF towards BRISTOL EAST JUNCTION, only a subsidiary one preceeded by shunt signal BL6625 leading to BARROW ROAD DEPOT.

Not at all supprised by the condition of signals at Gloucester.  NR» (Network Rail - home page) has no money for maintenance renewals these days (although might get a little bit in CP6 (Control Period 6 - The five year period between 2019 and 2024)).


I have just been told that under CP6 That Network Rail are planning to resignal Gloucester and Cheltenham within the next 18 months, The plan he said was to put the ine from Charfield to Churchdown onto TVSC» (Thames Valley Signalling Centre - about) And the line on towards Birmingham on to WMSC.

Does anybody know if signal BL1511 At Bristol Parkway being replaced.


Lastly the open train times map is now now out of date for the filton lines. Some signals seem to be showing OFF, when they shouldnt be.

BL1511 signal isn't being renewed but will be fitted with a flashing double yellow aspect once the Filton project is completed in the new year 2019.

There are some big NR boundary changes going to take place in the Gloucester/Cheltenham area in 2019.  I've not heard of any resignalling plans for that area yet and I would think that "in the next 18 months" probably means the start of design work only....


Isuppose the flashing double yellow on signal BL1511 is because of the signal BL1573 Which I assume will flash a single yellow on approach to the new crossovers.
426  Journey by Journey / Bristol (WECA) Commuters / Re: Four track for Filton Bank - ongoing discussion on: November 13, 2018, 13:28:51
If you look here there is an excellent section on the area we are discussing and the topic as well!

http://www.cornwallrailwaysociety.org.uk/bristol-tm-to-severn-beach.html


Thanks for the pictures there, it showed signal no BL1815 With its pos 1 2 3 indicators on and another on the filton down when it was previously there,One thing why was the filton lines removed, only to cost NR» (Network Rail - home page) loads of money to put back, there is so much waste in this country.Not to mention the contents of a bin bag in my kitchen full of unnessary
 packaging.
427  Journey by Journey / Bristol (WECA) Commuters / Re: Four track for Filton Bank - ongoing discussion on: November 13, 2018, 13:04:04
BL1815 only has Position 1, 2 and 3 JUNCTION INDICATORS.  There has never been a main route from there to the UP FILTON RELIEF towards BRISTOL EAST JUNCTION, only a subsidiary one preceeded by shunt signal BL6625 leading to BARROW ROAD DEPOT.

Not at all supprised by the condition of signals at Gloucester.  NR» (Network Rail - home page) has no money for maintenance renewals these days (although might get a little bit in CP6 (Control Period 6 - The five year period between 2019 and 2024)).


I have just been told that under CP6 That Network Rail are planning to resignal Gloucester and Cheltenham within the next 18 months, The plan he said was to put the ine from Charfield to Churchdown onto TVSC» (Thames Valley Signalling Centre - about) And the line on towards Birmingham on to WMSC.


Does anybody know if signal BL1511 At Bristol Parkway being replaced.


Lastly the open train times map is now now out of date for the filton lines. Some signals seem to be showing OFF, when they shouldnt be.


428  Journey by Journey / Bristol (WECA) Commuters / Re: Four track for Filton Bank - ongoing discussion on: November 13, 2018, 12:01:29
Its actually about 300m North of MULLER ROAD bridge (wherever that might be).
If you looked it up on Google Maps (or something similar) an approximate postcode would be BS7 9NZ which takes you into a retail park: the bridge in question is next to the southern end of said retail park as are some allotments.

after looking at the picture from dave harries that signal BL1818 does look a bit too tall and weired, could,nt they have just replaced the head to 4 aspect and added a junction indicator to the old one, would of been much cheaper. lastly just noticed the ones in the picture of the gantry look like the elite type, much nicer.
Interesting point. The same applies to Signals BL1981 on the line from Bath Spa, just before Bristol East Junctio: BL1981 is, for whatever reason, taller than BL1983.

Love the pictures, what is that thing we can see the back of, is it a new style banner repeater?.

Yes. Its BL1812BR.

I hope they are leaving the banners for signal BL1580 as I loved seeing them off from a train, I assume signal BL1580 will be left as it is needed to route trains into filton by now having the pos 1 junction indicator for the turnout just beyond the station and the position 4 indicator for the route towards Bristol parkways platform 1. Sandt plans did not show signal positions on.

Affraid not.  They are abolished.  BL1850 remains as before (but without its POSITION 4 JUNCTION INDICATOR), but is renewed due to the track slew.
Pity to see the BRs (British Rail(ways)) for BL1580 go as I also used to look at them when passing. I guess they will be kept for spares.

On another point I am surprised that, when I last looked over the weekend just gone, nothing has been done with BL1815 which is the starting signal for trains from Lawrence Hill towards Doctor Days Junction. This signal has been supported by a metal pole for some time so I am surprised that no opportunity has been taken to replace it.

Dave

BL1815 is a signal that has pos 1 2 3 4 Junction Indicators on, or it did when I last looked, it probably is alright, Any way better than the ones we have in Gloucester as those have been there for so long that the bare metal now shows on many of them, G154 plus its pos 1 ji G54 G58 G52 G50 are some examples, Also G133 that a route indicator that has gone green and now the routes no longer show through.
429  Journey by Journey / Bristol (WECA) Commuters / Re: Four track for Filton Bank - ongoing discussion on: November 12, 2018, 19:59:32
Love the pictures, what is that thing we can see the back of, is it a new style banner repeater?.

Yes. Its BL1812BR.

I hope they are leaving the banners for signal BL1580 as I loved seeing them off from a train, I assume signal BL1580 will be left as it is needed to route trains into filton by now having the pos 1 junction indicator for the turnout just beyond the station and the position 4 indicator for the route towards Bristol parkways platform 1. Sandt plans did not show signal positions on.
430  Journey by Journey / Bristol (WECA) Commuters / Re: Four track for Filton Bank - ongoing discussion on: November 12, 2018, 19:51:30
On one of four track nows pictures it shows on the right two really old tracks and a siding that looks disconnected, I assume they will be relaying that as well.
431  Journey by Journey / Bristol (WECA) Commuters / Re: Four track for Filton Bank - ongoing discussion on: November 12, 2018, 19:34:56
By the way do not forget Paddington station is on tv tonight. Love the pictures, what is that thing we can see the back of, is it a new style banner repeater?.
432  Journey by Journey / Bristol (WECA) Commuters / Re: Four track for Filton Bank - ongoing discussion on: November 12, 2018, 14:03:59
after looking at the picture from dave harries that signal BL1818 does look a bit too tall and weired, could,nt they have just replaced the head to 4 aspect and added a junction indicator to the old one, would of been much cheaper. lastly just noticed the ones in the picture of the gantry look like the elite type, much nicer.
433  Journey by Journey / Bristol (WECA) Commuters / Re: Four track for Filton Bank - ongoing discussion on: November 12, 2018, 13:49:40
Would have preferred if they had used nicer signals, those new ones look continental, rather they had used unipart elite range as in Cardiff.
Pages: 1 ... 27 28 [29]
Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page