Show Posts
|
Pages: 1 2 [3] 4 5 ... 38
|
34
|
All across the Great Western territory / The Wider Picture in the United Kingdom / Re: How much will it cost? Expanding the network.
|
on: November 14, 2018, 01:36:20 pm
|
One of the interesting points raised by Elon Musk, with respect to the Boring Company, is that tunnel production hasn't changed much in the last X years, and is generally slow and expensive. The whole premise of the Boring company is build lines fast, smaller and cheaper; and to beat Gary (the lab Snail) in the process.
Whilst it is not easy to imagine a new way of building rail lines in a dramatically cheaper way, it might be possible to increasing automate the process of building rail tunnels. This would allow a much better way of estimating costs.
|
|
|
36
|
Journey by Journey / Bristol (WECA) Commuters / Re: GWR replacement bus services - absolutely DREADFUL!!!
|
on: November 03, 2018, 12:09:01 pm
|
As said above, all doubledecker through this arched bridge have to centre themselves, otherwise the above will happen.
Being somewhat experienced of GWR▸ replacement bus services this year from Bristol Parkway, I think this will complete almost three months of bus services this year, I can safely say find another route.
Earlier this year I had the pleasure of a replacement bus from Filton Abbey Wood to Bristol Parkway, and the bus driver did not know the route.
The on going work at Temple Meads Gyratory means any schedule plans for buses to/from Temple Meads can only be aspirational. So for me a 73 bus in the morning to St Mary Redcliffe, avoiding the last bit to Temple Meads, and the T1 in the evening. Both seems reliable, but definitely slower. At a guess I have lost 45 minutes per day.
|
|
|
37
|
Journey by Journey / Bristol (WECA) Commuters / Re: Four track for Filton Bank - ongoing discussion
|
on: October 19, 2018, 08:22:58 pm
|
There are several bike boxes in the car park, no sure what the arrangement is to use them but I do agree that a bike rack and security camera would be money spent, as would a coffee stall (opportunity for someone?) and a small ticket office (why not merge them).
Before anyone wonders, Filton Abbey Wood has a very high throughput and could justify being manned with some basic services.
|
|
|
38
|
Journey by Journey / Bristol (WECA) Commuters / Re: Temple Meads ranked one of the worst stations in UK for punctuality
|
on: October 18, 2018, 09:46:46 am
|
Having been to Japan, I can wish that Network Rail where as punctual.
Looking at your phone, and feeling the train move at 2-3s past the expected minute ...
Seriously, from a UK▸ POV, I do expect trains or information systems to be punctual. If a train is late, the systems should tell you.
Also, if a train has missed its slot and is going to be bumped behind another another it should tell you. The nunber of times I have boarded a local train, and had to wait whilst a late Cross Country train arrives, and on few occasions the local train has had to wait for the next Cross Country Train (ref Bristol Temple Meads, 1600 CC, 16:15 Local stopping Service to Bristol Parkway, 16:30 CC).
|
|
|
43
|
Journey by Journey / Bristol (WECA) Commuters / Re: Four track for Filton Bank - ongoing discussion
|
on: October 06, 2018, 10:05:07 pm
|
With the lack of details about new rail schedules, for December, is it known when the extra trains from Bristol Temple Meads to London Paddington , via Bristol Parkway, will run? It is great,  , to have all this investment at Bristol Parkway, Filton Abbeywood and Filton Bank, but the lack of coordination and clarity of delivery leaves me, and others, unsure when things will actually get better and justify all this hassle.
|
|
|
|