I was at Temple Meads today and something stuck me (no, nothing that fell from the roof repairs). Getting off the Beach Line service today, the scaffolding at the southern end looked different, in fact it looked like some of it had been removed at it was clear all the way up to the roof. Wasn't the scaffolding running the entire length of the canopy recently? I suppose I could be imagining things. The roof certainly hasn't been refurbished there yet. Here's a picture of what I mean.
A paragraph in the
NR» words about the grit-blasting didn't get into the Bristol press version:
Due to the scale of the project, the restoration needs to be completed in stages. Over the coming months we will move our safety deck through the building, fully refurbishing the roof section by section. This summer we start work on the two gable ends from separate external scaffolding towers.
So it appears that the deck wasn't the full length of the roof.