Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 09:35 20 Apr 2024
- Some Wales roads to revert to 30mph after backlash
- BBC presenter reports racist abuse on London train
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
20th Apr (1789)
Opening of Sapperton Canal Tunnel

Train RunningCancelled
06:38 Weymouth to Gloucester
07:40 Penzance to Plymouth
07:55 Bristol Temple Meads to Penzance
08:15 Penzance to London Paddington
08:38 Bristol Temple Meads to Worcester Foregate Street
18:52 London Paddington to Great Malvern
19:19 Carmarthen to Swansea
Short Run
06:12 Penzance to London Paddington
06:30 Cardiff Central to Portsmouth Harbour
07:22 Exeter St Davids to Penzance
07:38 Bristol Temple Meads to Worcester Foregate Street
07:40 Worcester Foregate Street to Bristol Temple Meads
07:54 Reading to Gatwick Airport
08:30 Southampton Central to Bristol Temple Meads
08:45 Bristol Temple Meads to Warminster
08:52 Worcester Foregate Street to Bristol Temple Meads
10:09 Gloucester to Westbury
14:48 London Paddington to Carmarthen
21:07 Gloucester to Bristol Temple Meads
Delayed
07:30 London Paddington to Weston-Super-Mare
08:55 Paignton to London Paddington
09:09 Gloucester to Weymouth
09:30 Weymouth to Gloucester
09:52 Worcester Foregate Street to Bristol Temple Meads
10:52 Worcester Foregate Street to Bristol Temple Meads
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 20, 2024, 09:37:15 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[315] Somerset and Dorset Devonshire Tunnel flood
[250] Rail to refuge / Travel to refuge
[42] Rail delay compensation payments hit £100 million
[37] Problems with the Night Riviera sleeper - December 2014 onward...
[18] Difficult to argue with e-bike/scooter rules?
[17] Signage - not making it easy ...
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Linked Events
  • Beeching - 50 years on: March 27, 2013
Pages: 1 2 3 [4]
  Print  
Author Topic: 50 years on ... how should we look forward to the next 50 years?  (Read 35226 times)
FGW Huge
Newbie
*
Posts: 3


View Profile Email
« Reply #45 on: August 20, 2013, 19:04:56 »

hi graham

no i dont work for First but i have applied for a job ! .... it will be my third time trying. trying to follow my grandads footsteps as he built steam engines in derby!
Logged
broadgage
Transport Scholar
Hero Member
******
Posts: 5408



View Profile
« Reply #46 on: August 21, 2013, 12:31:50 »

Urinating onto a conductor rail, except from an improbably short distance, is most unlikely to result in a serious shock, since as others post the urine is likely to consist of a series of droplets and not a continous stream.
I would however advise against trying it ! an unusualy forceful effort MIGHT JUST result in a continous stream and a dangerous electric shock.

The situation is somwhat similar to overhead lines whether part of the national grid or railway electrification.
To direct a solid jet of water at these from fire fighting or irrigation equipment is most unwise and firefighters and farmers are warned of the dangers. To stand under such equipment in a rainstorm is safe.
Logged

A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard.
It has space for cycles, surfboards,luggage etc.
A 5 car DMU (Diesel Multiple Unit) is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
eightf48544
Transport Scholar
Hero Member
******
Posts: 4574


View Profile Email
« Reply #47 on: August 22, 2013, 10:25:16 »

Very glad to see that Mythbusters confirming you can't pee onto a conductor rail and get a shock, which is good because i once peed out the cab of a 33 in Chrystal Palace tunnel.

Presumably one of the things in 50 years time will be no concductor rails except perhaps on the Tube.
Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4362


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #48 on: August 22, 2013, 19:54:33 »

Presumably one of the things in 50 years time will be no concductor rails except perhaps on the Tube.
I'm not so convinced about that, certainly there will be re-electrification.  It will be a gradual process a very gradual process, a 100 years may be
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
ellendune
Transport Scholar
Hero Member
******
Posts: 4452


View Profile
« Reply #49 on: August 22, 2013, 20:43:12 »

Presumably one of the things in 50 years time will be no concductor rails except perhaps on the Tube.
I'm not so convinced about that, certainly there will be re-electrification.  It will be a gradual process a very gradual process, a 100 years may be

How long will the power supply equipment last? Surely less than 100 years. If the conversion goes ahead I think that will determine the rate. 
Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4362


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #50 on: August 22, 2013, 21:09:08 »

Presumably one of the things in 50 years time will be no concductor rails except perhaps on the Tube.
I'm not so convinced about that, certainly there will be re-electrification.  It will be a gradual process a very gradual process, a 100 years may be

How long will the power supply equipment last? Surely less than 100 years. If the conversion goes ahead I think that will determine the rate. 

Conrail can last 60 plus years, power supply equipment well there is some that is 60 years old and has just had a 5 to 10 year life extension.

Its down to affordability of the physical route mods to bridges, tunnels and other structures. 

It will be a ripple effect for instance, Basingstoke to Southampton should lead to Southampton to Weymouth also the move east to Woking , things like the North Downs line could lead to Reading to Staines.  In Kent extension out of Ashford and Ebbs Fleet especially is Crossrail ere to be extended from Abbey Wood
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
paul7575
Transport Scholar
Hero Member
******
Posts: 5318


View Profile
« Reply #51 on: August 22, 2013, 21:51:44 »

There's a lot of DC (Direct Current) power equipment that was added to strengthen the existing supplies within the last ten years, with a probable life remaining in the order of 40 or 50 years.  On a trip from Basingstoke to Southampton you pass a number of almost new power supply points - and of course they are all in relocatable buildings and can be resited relatively easily.

I don't know offhand what the proportion of new to old gear is, but let's assume it's going to be providing about 25% of current capacity.  That's a lot of spare technology crying out to be re-used...

This was all done across the SWT (South West Trains) and SN networks in a bit of an emergency, to allow for the higher load of the new generation EMUs (Electric Multiple Unit) such as Desiros and Electrostars - and the additions are still being done now for various train lengthening projects; I reckon brand new equipment is going to be added to the network for at least the next few years until all possible train lengthening is complete; in reaction to stuff like Thameslink for example.  Closer to home there's power strengthening planned for the Reading line (also for longer trains).

I often read online discussions suggesting that new DC equipment will no longer be fitted, but I believe that's a bit of an over-simplification.

Paul

Logged
TonyK
Global Moderator
Hero Member
*****
Posts: 6438


The artist formerly known as Four Track, Now!


View Profile
« Reply #52 on: August 22, 2013, 22:45:09 »


I don't know offhand what the proportion of new to old gear is, but let's assume it's going to be providing about 25% of current capacity.  That's a lot of spare technology crying out to be re-used...



In Network Rail's 2003 Technical Plan, we read that about 40% of the railway is electrified. I'm not aware of much new electrics since then. Of that 40%, around 60% is 25KV OLE (Overhead Line Equipment, more often "OHLE"), 40% by other systems, predominantly third rail, but with the Tyne and Wear Metro still 1500V DC (Direct Current) OLE. Though only 40% is electrified, about 60% of passengers journeys are by electric traction. Being 25KV doesn't guarantee youth - some of it dates back to the late 1950s following the 1955 BR (British Rail(ways)) Modernisation Plan, although much will presumably have been renewed since then.
Logged

Now, please!
ellendune
Transport Scholar
Hero Member
******
Posts: 4452


View Profile
« Reply #53 on: August 22, 2013, 22:49:39 »

I agree that we are likely to see geographical spread from existing AC and that it is unlikely that there will be no new Dc equipment fitted.

So the SWT (South West Trains) network is likely to be first.  

I recall that the Brighton line was originally electrified using DC (Direct Current) overhead lines. Does this mean that the clearances are there for re-electrification?

The recent relocatable equipment could be used to replace life expired equipment elsewhere on the DC network or for infill electrification.
Logged
Southernman
Sr. Member
****
Posts: 114


View Profile
« Reply #54 on: August 23, 2013, 00:16:00 »

The practicalities of conversion from third rail to overheads are very considerable (and expensive). I understand that it is not really possible to have both systems on the same line (except presumably where changeovers are to be made) as the currents will interfere with each other.

So, if the line from Basingstoke to Southampton (freight spine) is re-electrified on overheads, SWT (South West Trains) will require either new stock or changes to existing stock to enable them to continue to operate! Third Rail Waterloo-Basingstoke, Overheads Basingstoke-Southampton and Third Rail onwards. I also suspect that to make the changeover every train would have to stop at Basingstoke & Southampton (that would annoy passengers). I read that SWT have already raised concerns.

The disruption and costs of replacing Third Rail round Waterloo are beyond my imagination so I think this discussion has a very long way to run as to the best way forward.
Logged
TonyK
Global Moderator
Hero Member
*****
Posts: 6438


The artist formerly known as Four Track, Now!


View Profile
« Reply #55 on: August 23, 2013, 07:24:09 »

I'm fairly sure that the Eurostars, before HS1 (High Speed line 1 - St Pancras to Channel Tunnel) opened, were able to make the switch "on the fly". The momentum must be towards 25KV AC in the long term, but it will be a long, slow process. It would make sense to do it piecemeal, route by route, until the rolling stock remaining at third rail is so old and in such a minority that it makes sense to finish the conversion rather than build two types of train. Of course, there are plenty of trains into London that are already 25KV - are any of these lines also third rail?
Logged

Now, please!
paul7575
Transport Scholar
Hero Member
******
Posts: 5318


View Profile
« Reply #56 on: August 23, 2013, 10:16:45 »

Trains such as Electrostars (377s) & Capitalstars (LO 378) can already switch over on the move, but it relies on the changeover section being long enough to make it safe to do so at speed, and I don't think they all are.   SWT (South West Trains)'s Desiro fleet comes into the 'easily converted to AC supply' category, they already have the pantograph well and all the fixed wiring for the equipment that needs to be added.  I believe this was a standard requirement for any EMU (Electric Multiple Unit) by the time they were ordered.

All SWT services that pass through stop at Southampton, and it may be that Basingstoke is the only place changeover at speed will be needed for mainline services - then again they might just bite the bullet and introduce calls on the non-stop trains...

Paul

« Last Edit: August 23, 2013, 10:26:47 by paul7755 » Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4362


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #57 on: August 23, 2013, 17:24:41 »

I recall that the Brighton line was originally electrified using DC (Direct Current) overhead lines. Does this mean that the clearances are there for re-electrification?
The Brighton Line was not fully ac electrified it only covered a small area in and around London as was the much lower voltage 6600V

The practicalities of conversion from third rail to overheads are very considerable (and expensive). I understand that it is not really possible to have both systems on the same line (except presumably where changeovers are to be made) as the currents will interfere with each other.


Its not so much the currents interfere with each other, the cores of transformers used for ac distribution can get saturated by the dc which makes the inefficient although there are expensive solutions, also vacuum interrupters used in ac have problems breaking dc currents (they produce X-rays  Shocked ).
Earthing and bonding posses a problem  ac electrification tends to have all extraneous conductive metalwork bonded to traction return whereas dc the last thing that wants to be done is bond extraneous metalwork to traction return, although there are ways around all this ............. at a price

As for changeover from third rail to OLE (Overhead Line Equipment, more often "OHLE") on the move while it is not something we chose to do (much of) in the UK (United Kingdom) it is used in Europe all over the place so we could see some changes to how we operate our electrified railways
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 2 3 [4]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page