Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 01:55 20 Apr 2024
- Some Wales roads to revert to 30mph after backlash
- BBC presenter reports racist abuse on London train
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
20th Apr (1789)
Opening of Sapperton Canal Tunnel

Train RunningCancelled
05:15 Plymouth to Penzance
19:19 Carmarthen to Swansea
Short Run
07:22 Exeter St Davids to Penzance
07:23 Portsmouth Harbour to Cardiff Central
14:48 London Paddington to Carmarthen
18:52 London Paddington to Great Malvern
21:07 Gloucester to Bristol Temple Meads
Delayed
22:00 Hereford to London Paddington
06:30 Bristol Temple Meads to London Paddington
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 20, 2024, 02:13:52 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[276] Somerset and Dorset Devonshire Tunnel flood
[265] Rail to refuge / Travel to refuge
[45] Rail delay compensation payments hit £100 million
[40] Problems with the Night Riviera sleeper - December 2014 onward...
[19] Difficult to argue with e-bike/scooter rules?
[18] Signage - not making it easy ...
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: 1 2 [3] 4 5 ... 23
  Print  
Author Topic: East - West Rail update (Oxford to Bedford) - ongoing discussion  (Read 146818 times)
Btline
Hero Member
*****
Posts: 4782



View Profile
« Reply #30 on: January 29, 2009, 18:06:40 »

So will I! I can't see it as possible, as it includes stops.

Chiltern will not be able to cut stops (even on one train) because their B'ham to London trains provide the regular half hourly service for most stations between Dorridge and High Wycombe.

And consider that the WCML (West Coast Main Line) is 125 mph and with 4 stops is not much less than 90 mins!
Logged
G.Uard
Hero Member
*****
Posts: 426


"Are we at Yate yet?"


View Profile
« Reply #31 on: January 29, 2009, 19:14:22 »

Why end here


when it could end here?
Logged
Btline
Hero Member
*****
Posts: 4782



View Profile
« Reply #32 on: January 29, 2009, 21:55:44 »

Huh
Logged
willc
Hero Member
*****
Posts: 2330


View Profile
« Reply #33 on: January 30, 2009, 00:46:00 »

But headline timings and regular timings aren't the same thing.

The huge BR (British Rail(ways)) sign on the old Royal Mail depot at Curzon Street in Birmingham back in the 1980s proclaiming 'Birmingham-London in 91 minutes' or whatever it was applied to one or two trains a day each way, Monday-Friday only - 100 minutes was more like it the rest of the time.

Chiltern might be able to pull off a near 90-minute timing for the odd train, if yet more money is spent on extra capacity in north-west London and reinstating through loops at Buckinghamshire stations - and they don't get stuck behind a Freightliner between Banbury and Leamington - but is it really worth it?
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10116


View Profile
« Reply #34 on: January 30, 2009, 03:10:09 »

Chiltern might be able to pull off a near 90-minute timing for the odd train, if yet more money is spent on extra capacity in north-west London and reinstating through loops at Buckinghamshire stations - and they don't get stuck behind a Freightliner between Banbury and Leamington - but is it really worth it?

Indeed. A largely 90mph railway between Marylebone and Princes Risborough would only save a maximum of 2-4 minutes over the present schedule. After that it's already 100mph all the way to Banbury except for through Bicester and Aynho Junction (In Aynho's case, with the best will in the world, 60mph is the absolute max in the down direction). My advice: Spend the money wisely, forget cheap headlines, knock 10 minutes off of the current London-Birmingham schedules, keep on providing a quality alternative to Virgin, and watch the cash flow in to the coffers!
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
eightf48544
Transport Scholar
Hero Member
******
Posts: 4574


View Profile Email
« Reply #35 on: January 30, 2009, 10:02:01 »

As I understand Chilterns plans as outlined by there then timetable planner the 90 minute timing to Moor Street would be a regular timing with stops.

It would be achieved by re-enging the 165 with the 172 power train thus making them 100 mph units. Increses in line speeds South of Anyho up to 100 plus provion of bi directional fast lines at several stations between Marylebone and Banbury.

Logged
Btline
Hero Member
*****
Posts: 4782



View Profile
« Reply #36 on: January 30, 2009, 18:30:38 »

As I said before, they won't be headline services.

Chiltern provide the regular off peak half-hourly/hourly service for most of the route - including te B'ham end, CT/LM (London Midland - recent franchise) stopped most running south of Dorridge some years ago.

So they won't be able to just cut stops off to make a couple of "headline" services.

The minimum stops will be Moor Street, Solihul, Dorridge, Warwick Parkway, Warwick Town, Leamington, Banbury, Bicester, Princes Ris, High W, London. Lapworth and Hatton will require an hourly service. H & Thame Parkway will need some trains.

But I doubt they'll be able to do it, even if the whole route was 100 mph.
Logged
stebbo
Hero Member
*****
Posts: 445


View Profile
« Reply #37 on: January 30, 2009, 22:27:20 »

If some of the through lines at stations like Princes Risborourgh, High Wycombe, Beaconsfield, Denham could be reinstated then a faster Chiltern service is a possibility. Shame about Gerrards Cross with the platform narrowing and the Tesco monstrosity
Logged
John R
Hero Member
*****
Posts: 4416


View Profile
« Reply #38 on: January 30, 2009, 22:33:29 »

But apparently the new tunnel will have room for 4 tracks. (Some tunnel!)
Logged
stebbo
Hero Member
*****
Posts: 445


View Profile
« Reply #39 on: February 01, 2009, 11:11:49 »

What is the point in the Tesco tunnel having four tracks when the platforms were altered in such a way as to squeeze out the old through lines and the cutting beyond has, as I recall only space for the current double track?

Perhaps the idea is that stoppers have to go into the tunnel to wait for fast trains to overtake. I'm sure local residents of Gerrards Cross would love that....... Hard hats all round.
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10116


View Profile
« Reply #40 on: February 16, 2009, 16:10:44 »

The East-West Rail Consortium have released an updated report on the Central Section of the proposed route covering the route between Bletchley and Cambridge/Stansted/Peterborough. That's the section that will be the most difficult to implement as it involves new track for several miles. It's quite a weighty document but is an interesting read, especially as it gives preliminary timetable options for the route with preferred options of a link from Stewartby to Luton and then on to Stevenage, or the original proposed route of a link from Bedford to Sandy.

Downloadable here: http://www.eastwestrail.org.uk/reports/documents/CentralSectionReport-February2009.pdf
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
Electric train
Transport Scholar
Hero Member
******
Posts: 4362


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #41 on: November 06, 2009, 19:43:17 »

The EWR consortium have issued a press release http://www.eastwestrail.org.uk/news/documents/PRESSRELEASE-EWRC271009.pdf
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
IndustryInsider
Data Manager
Hero Member
******
Posts: 10116


View Profile
« Reply #42 on: June 08, 2010, 18:35:15 »

A little after the December 2009 date hoped for, but the East-West Rail Consortium has now published their GRIP (Guide to Railway Investment Projects) 4 survey findings.

Press release here: http://www.eastwestrail.org.uk/news/documents/PRESSRELEASE-EWRC080610.pdf
Non-technical summary here: http://www.eastwestrail.org.uk/reports/documents/EWRDraftOutlineBusinessCaseNTS_08062010_Final.pdf

The core scheme would give an hourly Milton Keynes to Oxford service, an hourly Milton Keynes to Marylebone via Aylesbury service, and retain the present hourly Bedford to Bletchley service.  The preferred scheme extends the Milton Keynes to Oxford service through to Reading, and provides a second train per hour by extending the Bedford to Bletchley service through to Oxford and then on to Reading.  Either scheme would be very welcome in my opinion!

Overall, a very positive document, including a headline BCR (Benefit Cost Ratio) of 5 - but still plenty of work to be done given the current financial climate!
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
Electric train
Transport Scholar
Hero Member
******
Posts: 4362


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #43 on: June 08, 2010, 19:30:22 »

The report shows great vision and should be built, the possibility of a Reading to Milton Keynes opens up so much potential, its a shame that I don't think the current Government will have the longsighted vision.

I do hope the consortium achieve this
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
Phil
Global Moderator
Hero Member
*****
Posts: 2044



View Profile
« Reply #44 on: June 08, 2010, 20:37:18 »

Hate to get political but I have to ask...
Quote
I don't think the current Government will have the longsighted vision.

Do you honestly think ANY Government would have that kind of vision? And if so, who?
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 2 [3] 4 5 ... 23
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page