Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 09:15 28 Mar 2024
- Easter travel warning as millions set to hit roads
- Man suffers life-threatening injuries after train stabbing
- Baltimore Bridge Collapse
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
28th Mar (1988)
Formal end to carrying coffins by BR (link)

Train RunningCancelled
06:57 Swansea to London Paddington
07:43 Swansea to London Paddington
08:18 London Paddington to Cardiff Central
08:30 London Paddington to Weston-Super-Mare
09:00 Bristol Temple Meads to London Paddington
09:12 London Paddington to Cardiff Central
09:29 Weston-Super-Mare to London Paddington
09:30 London Paddington to Bristol Temple Meads
09:46 Westbury to Swindon
10:15 London Paddington to Cardiff Central
10:30 London Paddington to Weston-Super-Mare
10:41 Cardiff Central to London Paddington
11:00 Bristol Temple Meads to London Paddington
11:05 Swindon to Westbury
11:16 London Paddington to Cardiff Central
11:23 Weston-Super-Mare to London Paddington
11:30 London Paddington to Bristol Temple Meads
11:50 Cardiff Central to London Paddington
12:15 London Paddington to Cardiff Central
12:17 Westbury to Swindon
12:30 London Paddington to Weston-Super-Mare
13:15 Swindon to Westbury
14:19 Westbury to Swindon
15:14 Swindon to Westbury
Short Run
05:40 Bristol Temple Meads to Penzance
06:38 Weymouth to Gloucester
06:54 Taunton to London Paddington
07:12 London Paddington to Cardiff Central
08:34 Exeter Central to Okehampton
08:38 London Paddington to Westbury
09:50 Cardiff Central to London Paddington
Delayed
05:03 Penzance to London Paddington
05:23 London Paddington to Swansea
05:33 Plymouth to London Paddington
05:55 Plymouth to London Paddington
06:00 London Paddington to Penzance
06:05 Penzance to London Paddington
06:50 Westbury to Weymouth
07:10 Penzance to London Paddington
08:03 London Paddington to Penzance
08:35 Plymouth to London Paddington
09:04 London Paddington to Plymouth
An additional train service has been planned to operate as shown 09:13 Bristol Temple Meads to Gloucester
09:37 London Paddington to Paignton
10:04 London Paddington to Penzance
10:23 London Paddington to Oxford
10:35 London Paddington to Exeter St Davids
10:50 Penzance to Cardiff Central
PollsOpen and recent polls
Closed 2024-03-25 Easter Escape - to where?
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
March 28, 2024, 09:19:15 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[146] West Wiltshire Bus Changes April 2024
[117] would you like your own LIVE train station departure board?
[80] Return of the BRUTE?
[63] Infrastructure problems in Thames Valley causing disruption el...
[49] Reversing Beeching - bring heritage and freight lines into the...
[27] CrossCountry upgrade will see 25% more rail seats
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: [1] 2 3
  Print  
Author Topic: Siemens powers trucks like trams with overhead wires  (Read 14106 times)
NickF
Global Moderator
Full Member
*****
Posts: 61


View Profile
« on: August 12, 2014, 11:07:14 »

http://www.wired.co.uk/news/archive/2014-08/11/siemens-ehighway-tests
Logged
trainer
Hero Member
*****
Posts: 1035


View Profile
« Reply #1 on: August 12, 2014, 15:56:21 »

I think the trolley bus is a nearer comparison for overhead electric power for a road vehicle.  The catenary looks very heavy-weight and not at all like the less obtrusive power lines used for trams and trollies.  Can't see it catching on in narrow, historically sensitive streets.

Thanks for an interesting link, Nick.
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7154


View Profile
« Reply #2 on: August 12, 2014, 16:17:32 »

Can't see it catching on in narrow, historically sensitive streets.

Surely that's not the idea? I think it's aimed at motorways, as part of a "what do we do if there's no oil left" plan B.

What is neat is to make use of in-road (presumably) guidance to keep the truck under the wires, so you no longer need to hook a "trolley" onto a wire.  A modest supercapacitor/battery allows you to change lanes or park. You could also make the supply three phase, if you wanted (e.g. you are Swiss).
Logged
eightf48544
Transport Scholar
Hero Member
******
Posts: 4574


View Profile Email
« Reply #3 on: August 12, 2014, 16:43:18 »

I presumme the heavy weight wires and pans are to be able to pass the necessary Watts to a number of trucks simultaneously.

Was there any mention of the voltage?

Agree it's more like a trolley bus than a tram but it's funny how things keep getting reinvented.

Wonder if you can fit regen brakes?

Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7154


View Profile
« Reply #4 on: August 12, 2014, 18:53:30 »

Was there any mention of the voltage?
650V DC (Direct Current)
Quote
Wonder if you can fit regen brakes?
Yes.

As well as being a Siemens project, it has been part of a German government research project called ENUBA, followed by ENUBA-2. However, most of the material available (and almost all that is in English) is from Siemens.

They don't actually mention guidance, but do go on about clever adaptive pantographs. So I guess at this stage if you drive off line the pan drops - which you'd need to do anyway, even guided, and it saves coupling it to another research project.
Logged
Rhydgaled
Hero Member
*****
Posts: 1500


View Profile WWW
« Reply #5 on: August 12, 2014, 20:08:19 »

Can't see it catching on in narrow, historically sensitive streets.
Surely that's not the idea? I think it's aimed at motorways, as part of a "what do we do if there's no oil left" plan B.

What is neat is to make use of in-road (presumably) guidance to keep the truck under the wires, so you no longer need to hook a "trolley" onto a wire.  A modest supercapacitor/battery allows you to change lanes or park. You could also make the supply three phase, if you wanted (e.g. you are Swiss).
Of course one of the advantages of rail electrification is the weight reduction from not having to carry self-power equipment (a benifit which is thrown away by the likes of the class 800/801) and hence a reduction in the amount of energy needed to shift the thing.
Logged

----------------------------
Don't DOO (Driver-Only Operation (that is, trains which operate without carrying a guard)) it, keep the guard (but it probably wouldn't be a bad idea if the driver unlocked the doors on arrival at calling points).
stuving
Transport Scholar
Hero Member
******
Posts: 7154


View Profile
« Reply #6 on: August 12, 2014, 20:21:35 »

Of course one of the advantages of rail electrification is the weight reduction from not having to carry self-power equipment (a benifit which is thrown away by the likes of the class 800/801) and hence a reduction in the amount of energy needed to shift the thing.

Not only is the current demo system a hybrid, but there is no visible plan to drop the diesel engine. I think the reason is obvious - you will need it until the wires cover the great majority of point-point truck runs. That could be a very long wait...

The choice of 650V DC (Direct Current) is, I would guess, to avoid excess weight in transformers etc.
Logged
Rhydgaled
Hero Member
*****
Posts: 1500


View Profile WWW
« Reply #7 on: August 12, 2014, 20:48:14 »

Of course one of the advantages of rail electrification is the weight reduction from not having to carry self-power equipment (a benifit which is thrown away by the likes of the class 800/801) and hence a reduction in the amount of energy needed to shift the thing.

Not only is the current demo system a hybrid, but there is no visible plan to drop the diesel engine. I think the reason is obvious - you will need it until the wires cover the great majority of point-point truck runs. That could be a very long wait...

The choice of 650V DC (Direct Current) is, I would guess, to avoid excess weight in transformers etc.
Of course you could detatch the trailer/container from the diesel power unit and put it behind an electric 'locomotive'.
Logged

----------------------------
Don't DOO (Driver-Only Operation (that is, trains which operate without carrying a guard)) it, keep the guard (but it probably wouldn't be a bad idea if the driver unlocked the doors on arrival at calling points).
JayMac
Data Manager
Hero Member
******
Posts: 18894



View Profile
« Reply #8 on: August 12, 2014, 22:11:36 »

So a potential two power units for each trailer? And associated additional cost for marshaling yards/staff/time to effect the switch over.

Or stick with the designed single unit hybrid solution.
Logged

"Build a man a fire and he'll be warm for the rest of the day. Set a man on fire and he'll be warm for the rest of his life."

- Sir Terry Pratchett.
broadgage
Transport Scholar
Hero Member
******
Posts: 5398



View Profile
« Reply #9 on: August 14, 2014, 12:46:17 »

Electrically powering a rubber tyred vehicle is inherently more complex than a tram or electric train.
A rubber tyred vehicle needs TWO overhead wires and TWO pantographs, unlike a rail vehicle or tram that needs only one, with return via the rails.
Having gone to expense of installing the infrastructure, then of course a trolley bus service on the same route might be viable.
Logged

A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard.
It has space for cycles, surfboards,luggage etc.
A 5 car DMU (Diesel Multiple Unit) is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
stuving
Transport Scholar
Hero Member
******
Posts: 7154


View Profile
« Reply #10 on: August 14, 2014, 13:10:56 »

Do remember this is research. They seem to be proposing the pictured system, as tried out on a test track in Germany, for the demo in California. However, I'd guess it might change a bit as it is further developed for that.

And I'm sure they have looked a lot of other possibilities, which may become preferable in the many years before any large-scale adoption. Once the truck knows where it is in the road, and has a battery or other energy store to take it even a few tens of metres, and the pantograph is moderately clever, all sorts of things are feasible.

For example, you simply stop the overhead supply at junction and rely on that energy store. Then you could put the two conductors side by side and clasp it with two collectors on a single arm. Or all sorts of other alternatives.
Logged
Oxonhutch
Transport Scholar
Hero Member
******
Posts: 1243



View Profile
« Reply #11 on: August 14, 2014, 13:28:57 »

Many open pit metal mines use these vehicles for rock haulage out of the (often quite deep) mines using electric on the incline and switching over to conventional diesel on the level pieces - both in and out of the pit.

Click here for an article on such vehicles.  From personal observation (on the job), as soon as these trucks hit the electric juice, they speed up tremendously.  Very impressive in their scale too - the tyre height alone towers above a man.  Then there is the wheel hub, the top of the tyre and then the rest of the truck.  Hybrid monsters indeed.
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7154


View Profile
« Reply #12 on: September 21, 2017, 11:06:32 »

Siemens have been busy on this project in the years since the earlier news items posted above, and have had two trucks doing trials in Sweden for a year, on a 2km stretch of public road. They just announced a bigger trial in Germany:
Quote
Siemens has been commissioned by the German state of Hesse to build an overhead contact line for electrified freight transport on a ten-kilometer stretch of autobahn. The line will supply electricity for the electric drive of a hybrid truck. Siemens originally presented its innovative "eHighway" concept in 2012. The system will be installed on the A5 federal autobahn between the Zeppelinheim/Cargo City Süd interchange at the Frankfurt Airport and the Darmstadt/Weiterstadt interchange.

The words all refer to the trucks as being hybrids, with diesel power as the other source not batteries. And as to what's happened to the proposed trial in California; I can still only see it mentioned in the future tense.
Logged
Bmblbzzz
Transport Scholar
Hero Member
******
Posts: 4256


View Profile
« Reply #13 on: September 21, 2017, 11:56:45 »

Interesting idea.

Clearly it's more similar to a trolleybus than a tram but it has a railway-like pantograph. Presumably this is to allow overtaking, as the article says, and I'd imagine it also makes the connectors less likely to lose contact going over bumps and potholes.

I think it could be a useful step on the way to electric HGVs, which are going to be much more difficult than electric (or fuel cell!) cars due to the longer distances and greater unpredictability of refuelling spots. Though of course a regular port run involves one known recharging spot every time; but still there would be the downtime cost of recharging, unless it can be included in driver's rest. OTOH (On The Other Hand) it could turn out to be a great white elephant due to cost of OHLE.
Logged

Waiting at Pilning for the midnight sleeper to Prague.
broadgage
Transport Scholar
Hero Member
******
Posts: 5398



View Profile
« Reply #14 on: September 21, 2017, 13:08:21 »

This idea has its merits but is not so new as may be supposed. Electric road vehicles powered from an overhead were used about 100 years ago.
IIRC (if I recall/remember/read correctly) the goods were placed in standard wagons primarily intended for horse hauling, but were hauled electrically up hills in particular.
I cant find the link but it was on a site about old technology.

Electrically powered canal boats were also tried.
Logged

A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard.
It has space for cycles, surfboards,luggage etc.
A 5 car DMU (Diesel Multiple Unit) is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1] 2 3
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page