Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 10:15 16 Apr 2024
- Police to close 11 station front desks
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
16th Apr (1987)
~ Tulyar arrives at Swanley New Barn Railway (link)

Train RunningCancelled
13:48 London Paddington to Carmarthen
18:02 Worcester Foregate Street to London Paddington
22:28 London Paddington to Bristol Temple Meads
23:32 London Paddington to Bristol Temple Meads
Short Run
07:10 Penzance to London Paddington
15:23 London Paddington to Worcester Foregate Street
15:28 London Paddington to Weston-Super-Mare
18:29 Weston-Super-Mare to London Paddington
18:34 London Paddington to Cheltenham Spa
19:56 Cardiff Central to Taunton
Delayed
09:00 Bristol Temple Meads to London Paddington
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 16, 2024, 10:29:08 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[119] Okehampton
[75] Ferry just cancelled - train tickets will be useless - advice?
[73] New station at Ashley Down, Bristol
[72] Is any one attending the TWSW(friday)?
[68] The One-Way Wizzo
[53] BBC Great Coastal Railway Journeys - A Correction
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: 1 2 [3]
  Print  
Author Topic: Siemens powers trucks like trams with overhead wires  (Read 14196 times)
eightonedee
Transport Scholar
Hero Member
******
Posts: 1535



View Profile
« Reply #30 on: August 11, 2021, 11:26:25 »

If this is extended to the UK (United Kingdom) along the same principles, (motorways only), it will miss many of our key freight road haulage routes to and from ports which governments have failed to upgrade to motorway status for decades - the A12, A34 and A14 all immediately come to mind.
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7162


View Profile
« Reply #31 on: August 11, 2021, 11:29:54 »

If this is extended to the UK (United Kingdom) along the same principles, (motorways only), it will miss many of our key freight road haulage routes to and from ports which governments have failed to upgrade to motorway status for decades - the A12, A34 and A14 all immediately come to mind.

But even in Germany, where the autobahn network is denser than our motorways, the third trial is on a lesser road. So perhaps that's not a principle, more of a good place to start.
Logged
broadgage
Transport Scholar
Hero Member
******
Posts: 5407



View Profile
« Reply #32 on: August 11, 2021, 12:28:29 »

I would prefer to see major ports served by electric railways.
Electrification of roads is more applicable to general freight traffic to/from numerous destinations, rather than intensive flows to ports.
A train carrying dozens of containers will use less energy than dozens of electric trucks, will need fewer staff, and take up less space.

Electric trucks are preferable to diesel on environmental grounds, but electric railways are better still due to reduced friction and greater capacity.
Logged

A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard.
It has space for cycles, surfboards,luggage etc.
A 5 car DMU (Diesel Multiple Unit) is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
eXPassenger
Transport Scholar
Hero Member
******
Posts: 548


View Profile
« Reply #33 on: August 11, 2021, 17:49:07 »

If this is extended to the UK (United Kingdom) along the same principles, (motorways only), it will miss many of our key freight road haulage routes to and from ports which governments have failed to upgrade to motorway status for decades - the A12, A34 and A14 all immediately come to mind.

I see no reason why A roads that have been widened to dual carriageway standards such as the A34 cannot be electrified, gaps could be left at any roundabouts.
Logged
mjones
Transport Scholar
Hero Member
******
Posts: 408


View Profile
« Reply #34 on: August 11, 2021, 18:09:59 »

These systems don't need to be continuous,  because the vehicles would be equipped with batteries, and gaps would be expected even on motorways. So there is no particular reason why major A roads would not be equipped.
Logged
Bmblbzzz
Transport Scholar
Hero Member
******
Posts: 4256


View Profile
« Reply #35 on: August 11, 2021, 19:46:22 »

The A roads mentioned do not have motorway status but they do have near-motorway standards. In many countries they would be designated "express roads" or something similar.
Logged

Waiting at Pilning for the midnight sleeper to Prague.
stuving
Transport Scholar
Hero Member
******
Posts: 7162


View Profile
« Reply #36 on: August 11, 2021, 19:59:02 »

The A roads mentioned do not have motorway status but they do have near-motorway standards. In many countries they would be designated "express roads" or something similar.

For trials, like those in Germany and now being studied here, who owns the road might matter in terms of negotiating to do it. But I can't see why the status of the road makes any difference at all in the long run, when there is a legal framework.
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 2 [3]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page