Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 16:55 20 Apr 2024
- Three men killed in retail park car crash named
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
20th Apr (1789)
Opening of Sapperton Canal Tunnel

Train RunningCancelled
15:30 Weymouth to Gloucester
18:52 London Paddington to Great Malvern
19:19 Carmarthen to Swansea
Short Run
14:48 London Paddington to Carmarthen
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 20, 2024, 17:02:56 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[318] Somerset and Dorset Devonshire Tunnel flood
[207] Rail to refuge / Travel to refuge
[102] On reservations, fees and supplements - Interrail
[35] Rail delay compensation payments hit £100 million
[31] Problems with the Night Riviera sleeper - December 2014 onward...
[15] Difficult to argue with e-bike/scooter rules?
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 72 73 [74] 75 76 ... 306
  Print  
Author Topic: Infrastructure problems in Thames Valley causing disruption elsewhere - ongoing, since Oct 2014  (Read 1256542 times)
TaplowGreen
Transport Scholar
Hero Member
******
Posts: 7794



View Profile
« Reply #1095 on: February 29, 2016, 10:15:39 »

.......I do love the refreshing honesty of these new excuses!  Smiley


09:18 Reading to London Paddington due 10:18 

This train has been delayed from Reading and is now 36 minutes late.
This train will no longer call at Twyford, Maidenhead, Taplow, Burnham, Slough, West Drayton, Hayes & Harlington, Southall and Ealing Broadway.

This is due to more trains than usual needing repairs at the same time.
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5318


View Profile
« Reply #1096 on: February 29, 2016, 10:44:46 »


...This is due to more trains than usual needing repairs at the same time.

I wonder if it is actually the HEx 332s that are causing the problems? 

AIUI (as I understand it) they are out of service while their anti-roll bars are checked for cracks, and the Connect 360s are running HEx; so GW (Great Western) are running a Paddington - Hayes stopper...

Paul
Logged
BerkshireBugsy
Hero Member
*****
Posts: 1640


Berkshire Bugsy Jr


View Profile
« Reply #1097 on: February 29, 2016, 10:48:47 »

.......I do love the refreshing honesty of these new excuses!  Smiley


09:18 Reading to London Paddington due 10:18 

This train has been delayed from Reading and is now 36 minutes late.
This train will no longer call at Twyford, Maidenhead, Taplow, Burnham, Slough, West Drayton, Hayes & Harlington, Southall and Ealing Broadway.

This is due to more trains than usual needing repairs at the same time.

I was on a Virgin Trains service from Euston to Glasgow yesterday (Sunday) and made use of the toilet.

When I locked the door there was a recorded announcment stating the things that should not be flushed down the toilet- I've convinced the last thing in the list was "Goldfish"....
Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 12357


View Profile Email
« Reply #1098 on: February 29, 2016, 10:53:13 »

it was, you heard right...
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7164


View Profile
« Reply #1099 on: February 29, 2016, 10:54:20 »

This is due to more trains than usual needing repairs at the same time.

Presumably in the future, for class 800/801/345 etc., it will say something like "this is due to the train supplier delivering too few trains today".
Logged
JayMac
Data Manager
Hero Member
******
Posts: 18918



View Profile
« Reply #1100 on: February 29, 2016, 15:01:50 »

I was on a Virgin Trains service from Euston to Glasgow yesterday (Sunday) and made use of the toilet.

When I locked the door there was a recorded announcment stating the things that should not be flushed down the toilet- I've convinced the last thing in the list was "Goldfish"....

That announcement is the same as the signs seen on raised toilet lids, or next to the toilet, on trains in the Stagecoach/Virgin fleets:

Logged

"Build a man a fire and he'll be warm for the rest of the day. Set a man on fire and he'll be warm for the rest of his life."

- Sir Terry Pratchett.
IndustryInsider
Data Manager
Hero Member
******
Posts: 10116


View Profile
« Reply #1101 on: February 29, 2016, 15:17:43 »

And it's reasonably amusing the first time you hear it, but less so over time!
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
TaplowGreen
Transport Scholar
Hero Member
******
Posts: 7794



View Profile
« Reply #1102 on: March 01, 2016, 08:57:31 »


...This is due to more trains than usual needing repairs at the same time.

I wonder if it is actually the HEx 332s that are causing the problems? 

AIUI (as I understand it) they are out of service while their anti-roll bars are checked for cracks, and the Connect 360s are running HEx; so GW (Great Western) are running a Paddington - Hayes stopper...

Paul


Not sure this is working out particularly well - I note that a similar message is on RTT» (Real Time Trains - website) today and my usual train was crush loaded from Hayes onwards, people left on platform..........then we roll past OOC (Old Oak Common (depot)) to see lots of shiny HEX trains in the sidings!

Any idea how long this is likely to continue?




Logged
TaplowGreen
Transport Scholar
Hero Member
******
Posts: 7794



View Profile
« Reply #1103 on: March 01, 2016, 15:17:12 »

Alterations to services at Southall 
Due to a speed restriction over defective track at Southall the London bound main line is blocked.
Impact
Train services running through this station may be delayed by up to 25 mins or revised. Disruption is expected until 16:45 01/03.

Reading - Paddington Stoppers non stopping Langley/Iver/West Drayton/Hayes/Ealing - not exactly ideal with Heathrow Connect down too.........Advice for those wanting Langley - Ealing? Go to Paddington and double back.
Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 12357


View Profile Email
« Reply #1104 on: March 01, 2016, 15:26:00 »

Any idea how long this is likely to continue?

The HEX website refers currently to 29 Feb - 1 Mar - so maybe back to normal in the morning? Either that, or they don't yet know & maybe that date will change daily until they do?
Logged
Sixty3Closure
Hero Member
*****
Posts: 501


View Profile
« Reply #1105 on: March 01, 2016, 18:40:38 »

40 mins late into work this morning from Twyford as my usual, fast train was half size and couldn't get on. Apparently due to rolling stock being cascaded around although no mention on the GWR (Great Western Railway) website about this. Again if GWR provided full information other than just saying it affects Hayes then I could make alternative plans rather than standing in the rain wondering if I'll get on the next train.  Angry

What I don't really understand is why GWR are providing rolling stock for Heathrow Express which is so far as I know a completely separate company and even a rival on the Heathrow route. Presumably a commercial arrangement has been agreed to switch the rolling stock and GWR are being compensated? I would have hoped their own customers should take priority?

Perhaps next time there's a major incident I'll be allowed to use my ticket on the HEX as that does provide an alternative way home (if friends are still working out that way).
Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 12357


View Profile Email
« Reply #1106 on: March 01, 2016, 18:46:10 »

HConnect is part-owned by HEX, or HEX contract GWR (Great Western Railway) to run HConnect services, don't they?.....so there'll be some arrangement in their contract to enable this. I don't think GWR have much choice?
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7164


View Profile
« Reply #1107 on: March 01, 2016, 19:24:04 »

HConnect is part-owned by HEX, or HEX contract GWR (Great Western Railway) to run HConnect services, don't they?.....so there'll be some arrangement in their contract to enable this. I don't think GWR have much choice?
Wikipedia says, in its usual authoritative tone of writing:
Quote
Heathrow Connect has a complex operating structure. The rolling stock and on-board staff are supplied by Heathrow Airport Holdings (formerly BAA) through the Heathrow Express company. For the portion of the journey between Paddington and Hayes & Harlington, these are leased to GWR and the service is classed as being "operated" by the latter. Between Hayes & Harlington and Airport Junction, it runs using open-access rights obtained by Heathrow Express. Beyond Airport Junction the track is owned by Heathrow Airport Holdings.

That's borne out by the GWR Franchise ITT (Invitation to Tender), where we read:
Quote
Successful mobilisation will include, among other things:
...
* entering into the specific arrangements with BAA under the Great Western franchise in relation to the Heathrow Connect service;
...
Train crew for the Heathrow Connect electric train service from Paddington to Heathrow are to be secured via a special agreement with BAA.
...
Use of the Class 360 electric trains used on the Heathrow Connect service is to be secured via a special agreement with BAA, rather than through a ROSCO» (Rolling Stock Owning Company - about) lease.
...
It should be assumed that Crossrail Rolling Stock will replace the existing Heathrow Connect rolling stock in May 2018. The Franchisee will not be required make any provision for rolling stock associated with this service after May 2018.
Staff that operate the Heathrow Connect service are employees of the Heathrow Express Operating Company Limited and thus any staff issues associated with this transfer are not a matter for the Great Western Franchise.
Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 12357


View Profile Email
« Reply #1108 on: March 01, 2016, 20:11:23 »

So HEX OWN & operate HConnect...so of course they'll use them on the HEX trains if needed. GWR (Great Western Railway) being franchised to operate between PAD» (Paddington (London) - next trains) & Hates, are doing that with 165s. Does make sense
Logged
TaplowGreen
Transport Scholar
Hero Member
******
Posts: 7794



View Profile
« Reply #1109 on: March 02, 2016, 06:36:33 »

Looks like the same situation today.
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 72 73 [74] 75 76 ... 306
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page