Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 22:55 25 Apr 2024
- Will Labour’s renationalisation plan make train tickets cheaper?
- Rail Britannia?
- Will Labour’s plan make train tickets cheaper?
- Labour pledges to renationalise most rail services
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

No 'On This Day' events reported for 25th Apr

Train RunningCancelled
22:35 Maidenhead to Marlow
23:03 Marlow to Maidenhead
23:50 Maidenhead to Marlow
26/04/24 00:17 Marlow to Maidenhead
Delayed
22:03 London Paddington to Bristol Temple Meads
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 25, 2024, 23:02:46 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[193] Labour to nationalise railways within five years of coming to ...
[102] access for all at Devon stations report
[56] Bonaparte's at Bristol Temple Meads
[34] Lack of rolling stock due to attacks on shipping in the Red Se...
[23] Cornish delays
[22] Theft from Severn Valley Railway
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 139 140 [141] 142 143 ... 306
  Print  
Author Topic: Infrastructure problems in Thames Valley causing disruption elsewhere - ongoing, since Oct 2014  (Read 1258669 times)
BBM
Transport Scholar
Hero Member
******
Posts: 634


View Profile
« Reply #2100 on: July 27, 2017, 09:58:05 »

http://www.maidenhead-advertiser.co.uk/gallery/burnham/118671/fire-crews-put-out-train-fire-near-burnham.html

Quote
Fire crews put out train fire near Burnham
Will Taylor
09:23AM, Thursday 27 July 2017

Rail passengers en route to London suffered an unusual delay after the engine in a driver cab on their train caught fire.

Firefighters from Slough, Maidenhead and Bracknell attended the blaze at about 11.20pm last night (Wednesday), with the train stopped between Burnham and Taplow.

Trains going through the area were stopped as fire crews attended the incident.

The Slough crew initially fought the fire, which was in the rear cab, with fire extinguishers.

The firefighters were unable to use water until the newly-installed overhead electrical wires were shut down by Network Rail.

Once they received word they were down, the crew was able put out the blaze.

All 52 people on board, who were travelling from Bristol to London, were fine and let off at Slough station.

They had been unable to disembark earlier from the train as it was in the middle of the track.

The train guard had moved passengers down the train away from the fire, and were seen to by the South Central Ambulance Service's Hazardous Area Response Team.

The Slough fire crew left the incident by 4am.
Logged
patch38
Transport Scholar
Hero Member
******
Posts: 653


View Profile
« Reply #2101 on: July 27, 2017, 10:12:51 »


The firefighters were unable to use water until the newly-installed overhead electrical wires were shut down by Network Rail.


I hadn't thought of that one as a side-effect of electrification. But then, wouldn't they normally use foam on an engine fire?


And we won't even go here...

Quote

the engine in a driver cab on their train caught fire

Logged
a-driver
Hero Member
*****
Posts: 972


View Profile
« Reply #2102 on: July 27, 2017, 11:07:07 »

Any member of the emergency services normally will not go on a railway line if the overheads are still live.

Probably not a good idea to use form as the engine room still contains electrics. The power cars are fitted with Inergen fire extinguishers.
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10119


View Profile
« Reply #2103 on: July 27, 2017, 14:26:08 »

I gather the Over-Head Line Equipment (OHLE) was switched off within 5 minutes of the first report of the engine fire to the signaller (which was made as it passed Maidenhead), so that would have been before the fire services arrived on site, though obviously communicating that fact to them would take a little longer.  Only two tracks were available out of the four due to an engineering possession which complicated things a little.

Edit: VickiS - Clarifying Acronym
« Last Edit: May 05, 2021, 15:29:18 by VickiS » Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
Electric train
Transport Scholar
Hero Member
******
Posts: 4362


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #2104 on: July 27, 2017, 20:35:40 »

I gather the OHLE was switched off within 5 minutes of the first report of the engine fire to the signaller (which was made as it passed Maidenhead), so that would have been before the fire services arrived on site, though obviously communicating that fact to them would take a little longer.  Only two tracks were available out of the four due to an engineering possession which complicated things a little.

If there was no risk to life or the fire spreading from the confines of the engine compartment / cab etc then the Fire Brigade may have waited until the RIO (Rail Incident Officer) was on site (RIO Rail Incident Officer) likely to have been a MOM (Mobile Operations Manager) (Mobile Operations Manager). 

I expect a Bronze or even a Silver Command would have been established between the various control centres (NR» (Network Rail - home page), Fire, BTP (British Transport Police), Ambulance and TOC (Train Operating Company))  This a well document process, which the various organisations hold regular liaison meetings
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
Jason
Hero Member
*****
Posts: 543


View Profile
« Reply #2105 on: July 28, 2017, 08:15:59 »

A fault with the signalling system at London Paddington has been resolved and services are returning to normal. Delays of up to 20 minutes to journeys to and from the station is expected to continue until 10:00.
Logged
wabbit
Full Member
***
Posts: 30


View Profile
« Reply #2106 on: July 29, 2017, 16:41:34 »

Re Slough Fire, it was a little emotional heading back on the 23:18 from Pad to Reading...... stopped for an hour outside Pad, then a little longer at Hayes and Harlington, before pulling into Reading around 03:20hrs.

Whilst we were having a slow, information free adventure up the main line (thanks to a knackered Tannoy system on the little donkey train), those remaining at Pad had to wait until the station staff agreed to organise taxis at around 03:00 hrs in the morning.

Not one of the network's finer moments for incident management........!
Logged
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #2107 on: July 31, 2017, 16:23:41 »

Just to keep this threads record up to date: The signalling on the Up Main between Taplow and Slough failed yesterday evening (Sunday 30/07/2017) and caused some disruption for two or three hours.  Hopefully TAPLOWGREEN was tucked up in bed by then..... Wink
Logged
TaplowGreen
Transport Scholar
Hero Member
******
Posts: 7798



View Profile
« Reply #2108 on: July 31, 2017, 20:37:31 »

Just to keep this threads record up to date: The signalling on the Up Main between Taplow and Slough failed yesterday evening (Sunday 30/07/2017) and caused some disruption for two or three hours.  Hopefully TAPLOWGREEN was tucked up in bed by then..... Wink

Sadly no - I was doing Missionary work in Cornwall  Wink
Logged
eightf48544
Transport Scholar
Hero Member
******
Posts: 4574


View Profile Email
« Reply #2109 on: July 31, 2017, 22:08:29 »

Got caught in this failure on the Valley Legend (Pad to Ebbw Vale and Tower Colliery.

Should have been around 15 early but crawled signal to signal from Birkenhead.

Logged
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #2110 on: August 01, 2017, 08:40:32 »

Got caught in this failure on the Valley Legend (Pad to Ebbw Vale and Tower Colliery.

Should have been around 15 early but crawled signal to signal from Birkenhead.
Crikey, bet that was a lot of signals to pass at danger. Did you mean Burnham...... Roll Eyes
Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 12365


View Profile Email
« Reply #2111 on: August 01, 2017, 10:09:53 »

well off course then, even for a railtour!
Logged
eightf48544
Transport Scholar
Hero Member
******
Posts: 4574


View Profile Email
« Reply #2112 on: August 02, 2017, 11:55:49 »

Spell checker!
Logged
TaplowGreen
Transport Scholar
Hero Member
******
Posts: 7798



View Profile
« Reply #2113 on: August 03, 2017, 06:50:41 »

Good morning....................?

Due to engineering works not being finished on time between Slough and London Paddington some lines are blocked.
Train services running to and from these stations may be cancelled, delayed by up to 20 minutes or revised. Disruption is expected until 10:00 03/08.

Customer Advice
Owing to enginneering work not finishing on time, this is affecting the relief lines between Slough and Southall which are currently blocked, we are unable to operate the full timetabled service to and from London Paddington at present. There will be a reduction in the frequency of train services (in both directions) between London Paddington and Reading / Oxford. Any other train service cancellations or alterations will be advised on an individual basis.


Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 12365


View Profile Email
« Reply #2114 on: August 03, 2017, 06:56:01 »

Seems to be Readings & Maidenheads that are being cancelled currently
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 139 140 [141] 142 143 ... 306
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page