Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 21:15 16 Apr 2024
* Potential new orders for struggling train firm
- Birmingham Airport flights disrupted by incident
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
16th Apr (1987)
~ Tulyar arrives at Swanley New Barn Railway (link)

Train RunningCancelled
19:30 London Paddington to Weston-Super-Mare
21:05 St Ives to St Erth
21:20 St Erth to St Ives
Additional 21:26 Bristol Temple Meads to Cardiff Central
21:37 St Ives to St Erth
22:21 St Erth to St Ives
22:44 Taunton to Bristol Temple Meads
22:48 St Ives to Penzance
17/04/24 00:45 London Paddington to Reading
Short Run
16:50 Penzance to Cardiff Central
19:56 Cardiff Central to Taunton
23:24 Didcot Parkway to London Paddington
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 16, 2024, 21:19:09 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[320] Problems with the Night Riviera sleeper - December 2014 onward...
[117] Proposals for open access services on new routes
[63] New station at Ashley Down, Bristol
[61] BBC Great Coastal Railway Journeys - A Correction
[57] Okehampton
[45] First tour train of season
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 153 154 [155] 156 157 ... 306
  Print  
Author Topic: Infrastructure problems in Thames Valley causing disruption elsewhere - ongoing, since Oct 2014  (Read 1253871 times)
ChrisB
Transport Scholar
Hero Member
******
Posts: 12357


View Profile Email
« Reply #2310 on: December 15, 2017, 22:04:34 »

The Up sleeper is an High Speed Train (HST (High Speed Train)) tonight too

Edit: VickiS - Clarifying Acronym
« Last Edit: May 05, 2021, 15:07:33 by VickiS » Logged
Timmer
Global Moderator
Hero Member
*****
Posts: 6297


View Profile
« Reply #2311 on: December 16, 2017, 19:24:51 »

An apology for last night’s signalling issue:
https://www.gwr.com/travel-updates/live-network-updates/disruption-information

Quote
Signalling failure, Friday 15th December

At 8.50 pm, a power failure caused the signals at Paddington to default to their "fail safe" of red, meaning that no trains were able to leave the station until the problem was resolved safely by Network Rail engineers, approximately one hour later. Network Rail and Great Western acknowledge that our customers were severely inconvenienced by this occurrence, happening as it did at a time when people like to go out and enjoy themselves with friends, or just get home after a long day at work. Although we did all we could to get you where you needed to be, we do realise that it was not a good end to the working week, and for this we are sorry. Those affected may be entitled to compensation...
Logged
TaplowGreen
Transport Scholar
Hero Member
******
Posts: 7792



View Profile
« Reply #2312 on: December 16, 2017, 22:36:13 »

An apology for last night’s signalling issue:
https://www.gwr.com/travel-updates/live-network-updates/disruption-information

Quote
Signalling failure, Friday 15th December

At 8.50 pm, a power failure caused the signals at Paddington to default to their "fail safe" of red, meaning that no trains were able to leave the station until the problem was resolved safely by Network Rail engineers, approximately one hour later. Network Rail and Great Western acknowledge that our customers were severely inconvenienced by this occurrence, happening as it did at a time when people like to go out and enjoy themselves with friends, or just get home after a long day at work. Although we did all we could to get you where you needed to be, we do realise that it was not a good end to the working week, and for this we are sorry. Those affected may be entitled to compensation...

No doubt another one is being prepared.......

Cancellations to services between Reading and Maidenhead
Due to urgent repairs to the track between Reading and Maidenhead fewer trains are able to run on some lines.
Train services running to and from these stations may be cancelled, delayed or revised. Disruption is expected until the end of the day.
Customer Advice
Replacement road transport in operation between Reading and Maidenhead.
Logged
TaplowGreen
Transport Scholar
Hero Member
******
Posts: 7792



View Profile
« Reply #2313 on: December 17, 2017, 09:50:31 »

Affecting several services this morning

08:52 Oxford to London Paddington due 09:57


08:52 Oxford to London Paddington due 09:57 will no longer call at Slough.
It has been delayed at Oxford and is now 39 minutes late.
This is due to engineering works not being finished on time.
Logged
TaplowGreen
Transport Scholar
Hero Member
******
Posts: 7792



View Profile
« Reply #2314 on: December 20, 2017, 21:34:25 »

Cancellations to services at Reading
Due to a points failure at Reading some lines are blocked.
Train services running to and from this station may be cancelled, delayed by up to 30 minutes or running non stop. Disruption is expected until 22:00 20/12.
Logged
TaplowGreen
Transport Scholar
Hero Member
******
Posts: 7792



View Profile
« Reply #2315 on: December 21, 2017, 07:25:31 »


Cancellations to services between Ealing Broadway and Slough
Due to a safety inspection of the track between Ealing Broadway and Slough the line towards Reading is blocked.
Train services running through these stations may be cancelled, delayed or revised. Disruption is expected until 09:00 21/12.
Logged
NickB
Hero Member
*****
Posts: 712


View Profile
« Reply #2316 on: December 21, 2017, 07:29:33 »

I’m london bound on an High Speed Train (HST (High Speed Train)) and have been told that it’s a broken down train...

Update: broken down train to Swansea necessitating a track inspection of all lines.

Edit: VickiS - Clarifying Acronym
« Last Edit: May 05, 2021, 15:08:19 by VickiS » Logged
TaplowGreen
Transport Scholar
Hero Member
******
Posts: 7792



View Profile
« Reply #2317 on: December 21, 2017, 07:54:25 »

I’m london bound on an HST (High Speed Train) and have been told that it’s a broken down train...

Update: broken down train to Swansea necessitating a track inspection of all lines.

Yep, another one of the wonderful new trains has broken down.....stuck outside Paddington waiting for a platform, half an hour late already & driver says he has "no idea" how long we'll be waiting.....outstanding performance GWR (Great Western Railway).
« Last Edit: December 21, 2017, 18:33:47 by TaplowGreen » Logged
ellendune
Transport Scholar
Hero Member
******
Posts: 4452


View Profile
« Reply #2318 on: December 21, 2017, 08:06:26 »

Journeycheck says:

Quote
Cancellations to services between Ealing Broadway and Slough
Due to a broken down train between Ealing Broadway and Slough the line towards Reading is blocked.
Train services running through these stations may be cancelled, delayed or revised. Disruption is expected until 09:00 21/12.
Customer Advice
London Buses are conveying passengers via any reasonable route until further notice.
Further Information
An update will follow within the next 1 hour.
Last Updated:21/12/2017 07:47

I note that they have stopped talking about emergency line inspections
Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 12357


View Profile Email
« Reply #2319 on: December 21, 2017, 08:20:11 »

Why would a broken down train necessitate a track inspection? Understand if something like the fuel tank collapsed on the track, but a simple break down?
Logged
Oxonhutch
Transport Scholar
Hero Member
******
Posts: 1248



View Profile
« Reply #2320 on: December 21, 2017, 08:47:35 »

Earlier passed a IEP (Intercity Express Program / Project.) to Swansea 1B05? stationary on the Down Main with all pans down on the town side of Hayes and Harlington.  We queued to crawl passed it on the Up Main with the TM(resolve) saying that a safety inspection of the overhead wires was in progress.  Couldn't see anything wrong in particular. Delayed 30 minutes so not as bad as I thought it was going to be.
Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 12357


View Profile Email
« Reply #2321 on: December 21, 2017, 08:49:28 »

That explains it - the wires are considered as part of the 'track' - which I guess is reasonable.
Logged
martyjon
Transport Scholar
Hero Member
******
Posts: 1941


View Profile
« Reply #2322 on: December 21, 2017, 09:34:35 »

Looks like there a drag on the horizon.

A 0Z99 is shown on open train times at the west end of Brenford sidings at Southall.
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10114


View Profile
« Reply #2323 on: December 21, 2017, 09:44:21 »

It had an ADD (Automatic Dropping Device) (Automatic Dropping Device) activation, which is a pantograph safety feature and could mean problems with the train or overhead wires - hence the need for the inspection.  Worryingly it was then unable to proceed on diesel power for some reason, which should be one of the great advantages of these new trains.  As I’ve said before though, brand new trains with brand new technology will take a while to settle down and overall reliability is probably a little better than I was personally expecting.  Hitachi bods will no doubt do a thorough investigation.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
martyjon
Transport Scholar
Hero Member
******
Posts: 1941


View Profile
« Reply #2324 on: December 21, 2017, 09:48:18 »

Looks like there a drag on the horizon.

A 0Z99 is shown on open train times at the west end of Brenford sidings at Southall.


A 1Z99 is now proceeding on the down main towards the disabled 1B05
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 153 154 [155] 156 157 ... 306
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page