Platforms 3, 4 and 5 closed at Didcot Parkway after a train's pantograph got tangled in the overhead late last night.
Surprised no additional stops, when I looked, being added to services from Bristol, South Wales and Cheltenham as a result of above but I suppose 387's stabled at Swindon can be re-routed using main lines for this am's traffic to the smoke or is that too simplistic for Swindon Control to implement. They have been some additional stops inserted into some evening services to Bristol TM‡: 16:30, 17:00, 17:30 (? - included in some info and not others) & 18:00 at Tilehurst, Goring & St, and Cholsey.
|
|
|
Logged
|
|
|
|
IndustryInsider
|
|
« Reply #3406 on: August 28, 2019, 17:48:52 » |
|
And at Didcot on a couple of the Oxford-Paddington peak expresses so that the two per hour service can be maintained.
|
|
|
Logged
|
To view my GWML▸ Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
|
|
|
BBM
|
|
« Reply #3407 on: August 31, 2019, 08:06:28 » |
|
There’s a 6-car Turbo out doing RDG‡-PAD» locals this morning, it did 2R11 0642 from PAD and appears to be scheduled for 2P28 0818 from RDG. I’m guessing that this might be as a consequence of the Over-Head Line Equipment (OHLE) damage which happened at Didcot a couple of days ago? Everything I’ve seen on locals on Saturdays since the start of last year has been 387s, indeed I’m currently on one.
Edit: VickiS - Clarifying Acronym
|
|
« Last Edit: April 14, 2021, 16:09:15 by VickiS »
|
Logged
|
|
|
|
TaplowGreen
|
|
« Reply #3408 on: September 01, 2019, 16:57:26 » |
|
Delays to services between London Paddington and Hayes & Harlington
Due to a broken down train between London Paddington and Hayes & Harlington some lines are blocked. Train services running to and from these stations may be delayed. Disruption is expected until 18:30 01/09.
|
|
|
Logged
|
|
|
|
TaplowGreen
|
|
« Reply #3409 on: September 02, 2019, 05:07:49 » |
|
Good start to the week.
Cancellations to services between Oxford and Didcot Parkway Due to engineering works not being finished on time between Oxford and Didcot Parkway all lines are blocked. Train services running through these stations may be cancelled, delayed or revised. Disruption is expected until 07:00 02/09.
|
|
|
Logged
|
|
|
|
martyjon
|
|
« Reply #3410 on: September 02, 2019, 05:52:09 » |
|
Good start to the week.
Cancellations to services between Oxford and Didcot Parkway Due to engineering works not being finished on time between Oxford and Didcot Parkway all lines are blocked. Train services running through these stations may be cancelled, delayed or revised. Disruption is expected until 07:00 02/09. Add to that ;- Cancellations to services between Twyford and Henley-On-Thames Due to engineering works not being finished on time between Twyford and Henley-On-Thames all lines are blocked. Train services running to and from these stations may be cancelled. Disruption is expected until 07:00 02/09.
|
|
|
Logged
|
|
|
|
TaplowGreen
|
|
« Reply #3411 on: September 02, 2019, 06:02:04 » |
|
Good start to the week.
Cancellations to services between Oxford and Didcot Parkway Due to engineering works not being finished on time between Oxford and Didcot Parkway all lines are blocked. Train services running through these stations may be cancelled, delayed or revised. Disruption is expected until 07:00 02/09.
Disruption now expected till 0800.
|
|
|
Logged
|
|
|
|
charles_uk
|
|
« Reply #3412 on: September 02, 2019, 07:59:10 » |
|
Good start to the week.
Cancellations to services between Oxford and Didcot Parkway Due to engineering works not being finished on time between Oxford and Didcot Parkway all lines are blocked. Train services running through these stations may be cancelled, delayed or revised. Disruption is expected until 07:00 02/09.
Disruption now expected till 0800. Now 0900! Following engineering works not being finished on time between Oxford and Didcot Parkway all lines are now open.
Train services running through these stations are returning to normal but some services may still be delayed by up to 30 minutes or revised. Disruption is expected until 09:00 02/09.
|
|
|
Logged
|
|
|
|
NickB
|
|
« Reply #3413 on: September 11, 2019, 23:31:26 » |
|
Delays due to signalling problems. Apparently. I just think that can’t be arsed.
|
|
|
Logged
|
|
|
|
Jason
|
|
« Reply #3414 on: September 20, 2019, 08:59:24 » |
|
Due to a fault with the signalling system between London Paddington and Reading some lines are disrupted. Impact: Train services running to and from these stations are returning to normal but some services may still be cancelled or delayed by up to 20 minutes. Disruption is expected until 09:45 20/09.
|
|
|
Logged
|
|
|
|
TaplowGreen
|
|
« Reply #3415 on: September 24, 2019, 06:24:27 » |
|
Alterations to services between Ealing Broadway and London Paddington Due to a broken down train between Ealing Broadway and London Paddington the line towards London Paddington bound local stopping is blocked. Train services running to and from these stations may be delayed or revised. Disruption is expected until 07:45 24/09.
Delays to services at Newbury
Due to heavy rain flooding the railway at Newbury trains have to run at reduced speed on some lines. Train services running through this station may be delayed. Disruption is expected until 12:00 24/09.
|
|
« Last Edit: September 24, 2019, 07:12:19 by TaplowGreen »
|
Logged
|
|
|
|
SandTEngineer
|
|
« Reply #3416 on: September 24, 2019, 08:53:03 » |
|
Alterations to services between Ealing Broadway and London Paddington Due to a broken down train between Ealing Broadway and London Paddington the line towards London Paddington bound local stopping is blocked. Train services running to and from these stations may be delayed or revised. Disruption is expected until 07:45 24/09.
Delays to services at Newbury
Due to heavy rain flooding the railway at Newbury trains have to run at reduced speed on some lines. Train services running through this station may be delayed. Disruption is expected until 12:00 24/09. Helped a little bit by no trains from the far-Southwest due to signalling being knocked out by lightning between Plymouth and Totnes....
|
|
|
Logged
|
|
|
|
Jason
|
|
« Reply #3417 on: October 15, 2019, 16:32:18 » |
|
Due to a fault with the signalling system between London Paddington and Hayes & Harlington fewer trains are able to run on some lines. Impact: Train services running to and from these stations may be cancelled or delayed by up to 15 minutes. Disruption is expected until 17:30 15/10.
Edit: disruption now until 21:30
|
|
« Last Edit: October 15, 2019, 16:48:19 by Jason »
|
Logged
|
|
|
|
lordgoata
|
|
« Reply #3418 on: October 17, 2019, 12:52:18 » |
|
Due to damage to the overhead electric wires between Reading and London Paddington the London Paddington bound line is closed. Services running to and from these stations have been delayed or cancelled.
|
|
|
Logged
|
|
|
|
BBM
|
|
« Reply #3419 on: October 21, 2019, 17:30:34 » |
|
Cancellations to services between Slough and Reading
Due to a safety inspection of the track between Slough and Reading the Reading bound high speed line is blocked.
Train services running to and from these stations may be cancelled or delayed by up to 15 minutes. Disruption is expected until 18:00 21/10.
Customer Advice
GWR▸ High Speed services will not be calling at Twyford.
I'm watching OTT▸ Maps and Down fasts and semi-fasts on both the Main and Relief are running on time but just not stopping at TWY▸ when scheduled to do so! What exactly is the problem?
|
|
|