Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 21:35 28 Mar 2024
* Bus plunges off South Africa bridge, killing 45
* Easter getaways hit by travel disruption
- Where Baltimore bridge investigation goes now
- How do I renew my UK passport and what is the 10-year rule?
- Family anger at sentence on fatal crash driver, 19
- Easter travel warning as millions set to hit roads
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
28th Mar (1988)
Woman found murdered on Orpington to London train (*)

Train RunningCancelled
18:30 Cardiff Central to Portsmouth Harbour
18:36 London Paddington to Plymouth
19:33 London Paddington to Worcester Shrub Hill
19:35 Exeter St Davids to London Paddington
19:59 Gatwick Airport to Reading
20:29 Gatwick Airport to Reading
20:54 Reading to Gatwick Airport
20:56 Worcester Foregate Street to London Paddington
21:16 Bedwyn to Newbury
21:30 Shalford to Reading
21:53 Newbury to Bedwyn
22:25 Bedwyn to Newbury
22:30 Gatwick Airport to Reading
22:47 Newbury to Bedwyn
Short Run
17:03 London Paddington to Penzance
17:36 London Paddington to Plymouth
18:03 London Paddington to Penzance
19:04 Paignton to London Paddington
20:03 London Paddington to Plymouth
20:11 Salisbury to Bristol Temple Meads
20:42 Bedwyn to London Paddington
21:04 London Paddington to Plymouth
21:20 Bristol Temple Meads to Severn Beach
22:10 Severn Beach to Bristol Temple Meads
23:04 Reading to Bedwyn
23:17 Bedwyn to Reading
Delayed
16:15 Penzance to London Paddington
Additional 17:26 Castle Cary to Penzance
19:04 London Paddington to Plymouth
21:30 Gatwick Airport to Reading
23:45 London Paddington to Penzance
PollsOpen and recent polls
Closed 2024-03-25 Easter Escape - to where?
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
March 28, 2024, 21:42:52 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[104] West Wiltshire Bus Changes April 2024
[103] would you like your own LIVE train station departure board?
[78] Infrastructure problems in Thames Valley causing disruption el...
[56] If not HS2 to Manchester, how will traffic be carried?
[41] Return of the BRUTE?
[25] Reversing Beeching - bring heritage and freight lines into the...
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 37 38 [39] 40 41 ... 63
  Print  
Author Topic: Problems with the Night Riviera sleeper - December 2014 onwards  (Read 314963 times)
grahame
Administrator
Hero Member
*****
Posts: 40690



View Profile WWW Email
« Reply #570 on: September 29, 2018, 05:55:44 »

With the questionable reliability of the class 57s, the soon-to-be-surplus HSTs (High Speed Train), and the fact that the sleeper stock is Mk3, is there any mileage in the idea of top-n-tailing the sleeper with Class 43 power cars?
Electrical systems are different between sleeper and day Mk3 stock, but that can't be an insurmountable problem.  This idea does, however, prevent the re-introduction of a Plymouth portion.

I recall a discussion along these lines in the past that suggested a major problem would be the wiring of the carriages - although they're Mk3 stock, the answer was that the electrics are far too different to convert them.  Whether wiring does make it really impossible, whether that just makes it very difficult indeed, or whether it was a convenient answer to kick an option into the long grass, I don't know.

Utopia for a TOC (Train Operating Company) is a standard set of stock to run all of its services.  Nightmare is having every locomotive / unit different.  The ability to reduce your stock types by one must surely be tempting.  Given as the reason the slammers were pulled from Lymington. Yet I'm amazed at the switch away from class 153 on Stourbridge Town. Even the heritage lines find the same issues - noting the South Devon Railway's delight at getting a class 25 in place of a 37 recently on the grounds of "good - we have 2 of those already" - note - link needed and my report  may be accurate only in concept.
Logged

Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
bobm
Administrator
Hero Member
*****
Posts: 9809



View Profile
« Reply #571 on: September 29, 2018, 07:48:56 »

With the current sleeper stock nearing the end of a refurbishment programme I doubt they would want to start re-wiring them at this point.
Logged
grahame
Administrator
Hero Member
*****
Posts: 40690



View Profile WWW Email
« Reply #572 on: September 29, 2018, 09:38:48 »

With the current sleeper stock nearing the end of a refurbishment programme I doubt they would want to start re-wiring them at this point.

Out of context - that reminds me of a fear I have about the relaying of Westbury North Junction by Network Rail - replacement of like for like when we have been screaming out for the provision of a track alongside the fourth platform.   When asked about passive provision, I'm told:

Quote
We’re not aware of any proposals to assist specifically with capacity, timekeeping or robustness of service.
and
Quote
The work at Christmas is indeed like-for-like renewal of the S&C (Settle and Carlisle ) at Westbury North

and I am, frankly, open mouthed in astonishment that "we" which is GWR (Great Western Railway) are not aware of any proposals to deal with capacity.

And - here's what I suspect Bobm's thinking would be said if the replacement of 57s by 43s and associated rewiring was proposed in the near term ...

Quote
Our concern would be that we are already inconveniencing Westbury and the TransWilts significantly this Christmas, and so we would need to consider any future engineering enhancement works, balancing the short-term disruption against the benefit to GWR and passengers in the longer term.

Perhaps that's also a convenient way of diverting requests to spend money - especially when some of that could (have been) saved by doing both things at once.

They don't seem to have worried too much about taking daytime services away for 60+ days this year ... mostly to do with a neighbouring line that TransWilts passengers rarely connect to ... so I'm sure another couple of weekends to enable services to actually connect at Westbury would be accepted ...
Logged

Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
martyjon
Transport Scholar
Hero Member
******
Posts: 1941


View Profile
« Reply #573 on: September 29, 2018, 10:43:42 »

With the current sleeper stock nearing the end of a refurbishment programme I doubt they would want to start re-wiring them at this point.

Surely it is not beyond the wit of man to produce a conversion lead to convert the electrical supply wiring from an HST (High Speed Train) power car to that at the other end to match the electrical supply wiring from a class 57.

I am old enough to remember when "square" pin plugs were introduced. My dad produced conversion leads with a round pin plug at one end and a "square" plug at the other when we moved from a council prefab to a new house.
Logged
ellendune
Transport Scholar
Hero Member
******
Posts: 4452


View Profile
« Reply #574 on: September 29, 2018, 11:08:42 »

Yes but square and round pin plugs still had three wires with the same 240 volts (in those days) AC and Earth. albeit the structure of the wiring behind it was different.  The wiring between the two power cars of an HST (High Speed Train) carry signals that control the engines use a system to carry these signals.  I do not know if there are the same number of wires as the class 57 work on the same voltage; or even if the class 57 have any control links when two of them work a single train, but even if they similar in that respect, a complex signal sometimes means the wires have to be made in a certain way (twisted or shielded or both and of a certain thickness and with a certain specification) for the signal to reach the other end in a recognisable form. 

I am sure there are others on here who know much more about it and can give a more informed answer.
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7156


View Profile
« Reply #575 on: September 29, 2018, 11:44:58 »

The big difference between HST (High Speed Train) Mk 3s and LHCS (Locomotive Hauled Coaching Stock) ones is the auxiliary power supply. On LHCS stock (not just Mk 3s) this is DC (Direct Current) (though they can cope with AC) at something in the range 700-1000 V. It gets converted by a motor/alternator set (originally) on each carriage to more useful supplies like 415/240 V AC and 28 V DC. In HSTs, the supply from the power car is at 415 V AC (3 phase). Since the train heating runs off the power as supplied, i.e. 750 V DC (nominal), you can't just wire one to the other. I'm assuming, in the absence of an actual document, that the sleeper stock is the same as LHCS Mk 3 day stock, apart from some updating (e.g. inverters to replace motor/generators).

Of course if you wanted to convert between these power supplies, there is no technical problem - boxes to do it are easily made these days. You'd just need to decide to do it and find the money.
Logged
1st fan
Hero Member
*****
Posts: 402


View Profile
« Reply #576 on: October 12, 2018, 14:03:18 »

The Paddington - Penzance arrived 128 minutes late having left Paddington 164 minutes late. I'm assuming that this was a late inbound of the empty stock and weather related.
Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 12334


View Profile Email
« Reply #577 on: October 12, 2018, 14:04:01 »

I heard it got stopped by a fallen tree?
Logged
1st fan
Hero Member
*****
Posts: 402


View Profile
« Reply #578 on: October 12, 2018, 14:07:57 »

Depending on the severity of the winds a downed tree would probably count as weather related.
Logged
1st fan
Hero Member
*****
Posts: 402


View Profile
« Reply #579 on: October 13, 2018, 01:15:35 »

The Friday night Penzance to Paddington service is delayed due to a track safety inspection. Expected to leave 225 minutes late at 01:30 and drops Totness and Newton Abbot from the stops.
This is due to a safety inspection of the track.
Logged
TaplowGreen
Transport Scholar
Hero Member
******
Posts: 7746



View Profile
« Reply #580 on: October 13, 2018, 07:22:55 »

The Friday night Penzance to Paddington service is delayed due to a track safety inspection. Expected to leave 225 minutes late at 01:30 and drops Totness and Newton Abbot from the stops.
This is due to a safety inspection of the track.

Terminating at Reading 4 hours late.
Logged
old original
Transport Scholar
Hero Member
******
Posts: 877


View Profile
« Reply #581 on: October 19, 2018, 06:35:49 »

Down service terminating at Plymouth this morning
Logged

8 Billion people on a wet rock - of course we're not happy
Incider
Transport Scholar
Full Member
******
Posts: 98


View Profile
« Reply #582 on: October 19, 2018, 09:21:17 »

The big difference between HST (High Speed Train) Mk 3s and LHCS (Locomotive Hauled Coaching Stock) ones is the auxiliary power supply. On LHCS stock (not just Mk 3s) this is DC (Direct Current) (though they can cope with AC) at something in the range 700-1000 V. It gets converted by a motor/alternator set (originally) on each carriage to more useful supplies like 415/240 V AC and 28 V DC. In HSTs, the supply from the power car is at 415 V AC (3 phase). Since the train heating runs off the power as supplied, i.e. 750 V DC (nominal), you can't just wire one to the other. I'm assuming, in the absence of an actual document, that the sleeper stock is the same as LHCS Mk 3 day stock, apart from some updating (e.g. inverters to replace motor/generators).

Of course if you wanted to convert between these power supplies, there is no technical problem - boxes to do it are easily made these days. You'd just need to decide to do it and find the money.

And fit 36 way control to all the coaches, there is also an obstacle with the fire detection system and the electrical supply, the supply from an HST is variable (275v - 415v with the accompanying variation in Hz) and quite ‘dirty’ and it wasn’t deemed a viable option.
Logged
Rob on the hill
Hero Member
*****
Posts: 354


View Profile
« Reply #583 on: October 19, 2018, 09:53:33 »

Down service terminating at Plymouth this morning

Seems to have continued later to Penzance ECS (Empty Coaching Stock). Wonder what arrangements were made for the passengers?
http://www.realtimetrains.co.uk/train/O49307/2018/10/19/advanced
Logged
Rob on the hill
Hero Member
*****
Posts: 354


View Profile
« Reply #584 on: October 19, 2018, 10:00:39 »

Down service terminating at Plymouth this morning

Seems to have continued later to Penzance ECS (Empty Coaching Stock). Wonder what arrangements were made for the passengers?
http://www.realtimetrains.co.uk/train/O49307/2018/10/19/advanced
Cross Country seem to have provided the replacement service;
http://www.realtimetrains.co.uk/train/C76004/2018/10/19/advanced
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 37 38 [39] 40 41 ... 63
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page