Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 05:15 29 Mar 2024
- Bus plunges off South Africa bridge, killing 45
* Easter getaway begins with flood alerts in place
- Easter travel warning as millions set to hit roads
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
29th Mar (1913)
Foundation of National Union or Railwaymen (*)

Train RunningCancelled
07:00 Bedwyn to Newbury
07:22 Newbury to Bedwyn
08:13 Newbury to Bedwyn
08:46 Bedwyn to Newbury
09:54 Bedwyn to Newbury
10:22 Newbury to Bedwyn
11:29 Newbury to Bedwyn
11:57 Bedwyn to Newbury
12:52 Bedwyn to Newbury
Short Run
04:54 Plymouth to London Paddington
05:12 Reading to Bedwyn
05:33 Plymouth to London Paddington
05:55 Plymouth to London Paddington
06:00 Bedwyn to London Paddington
06:37 Plymouth to London Paddington
07:03 London Paddington to Paignton
08:35 Plymouth to London Paddington
10:35 London Paddington to Exeter St Davids
Delayed
23:45 London Paddington to Penzance
05:03 Penzance to London Paddington
06:05 Penzance to London Paddington
07:10 Penzance to London Paddington
08:03 London Paddington to Penzance
08:15 Penzance to London Paddington
09:04 London Paddington to Plymouth
09:37 London Paddington to Paignton
10:04 London Paddington to Penzance
11:03 London Paddington to Plymouth
PollsOpen and recent polls
Closed 2024-03-25 Easter Escape - to where?
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
March 29, 2024, 05:32:04 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[92] West Wiltshire Bus Changes April 2024
[91] would you like your own LIVE train station departure board?
[81] Return of the BRUTE?
[69] Infrastructure problems in Thames Valley causing disruption el...
[56] 2024 - Service update and amendment log, Swindon <-> Westbury...
[50] If not HS2 to Manchester, how will traffic be carried?
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 2 [3]
  Print  
Author Topic: GWML Electrification - getting the electric into the wires above the trains  (Read 32366 times)
Henry
Hero Member
*****
Posts: 369


View Profile
« Reply #30 on: August 11, 2015, 08:15:47 »


 'Dangly Bits'.

 Now that's the technical jargon I can understand !    Wink
Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4356


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #31 on: August 11, 2015, 20:06:00 »

Good to know National Grid aren't behind schedule!  Tongue

Actually I think they are, quietly relived that NR» (Network Rail - home page) don't want to take power for a while
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
gwr2006
Sr. Member
****
Posts: 137


View Profile
« Reply #32 on: November 24, 2017, 00:15:33 »

These may seem like daft questions but with so much now appearing at the trackside I hope some of the experts here will be able to answer them.

    1) There are four tall posts either side of the tracks just west of the old line into Didcot A Power Station. Are they part of the neutral section or is that nearer to Foxhall Junction?
    2) Maybe these masts that will eventually supply power from Didcot ATFS to the OLE (Overhead Line Equipment, more often "OHLE") west of Didcot as far as Wootton Bassett Junction? There is a cable trough back to the Didcot ATFS, and another one to a similar set of posts near Didcot North Junction for the Oxford lines.
    3) Does this mean Didcot ATFS provides a power source for three sections - 1) Maidenhead MPATS (Mid Point Auto Transformer Site - electrification) to Milton, 2) Milton to Wootton Bassett and 3) Didcot to Oxford?
    4) Am I right in thinking there are only neutral sections where the source of power changes from one ASTF to another?
    5) Does anyone have a drawing showing the general arrangement of a GWEP (Great Western Electrification Program) neutral section?
    6) Finally, with an ATF system, does +25Kv phase flow through the OLE and -25Kv phase flow through the ATF cable and they come together at an ATS (Automatic Train Supervision), get boosted, and then repeat that to the next ATS and so on?
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5316


View Profile
« Reply #33 on: November 24, 2017, 11:26:41 »

These may seem like daft questions but with so much now appearing at the trackside I hope some of the experts here will be able to answer them.
    5) Does anyone have a drawing showing the general arrangement of a GWEP (Great Western Electrification Program) neutral section?
    6) Finally, with an ATF system, does +25Kv phase flow through the OLE (Overhead Line Equipment, more often "OHLE") and -25Kv phase flow through the ATF cable and they come together at an ATS (Automatic Train Supervision), get boosted, and then repeat that to the next ATS and so on?

5.   There was a pdf guide quoted in the other thread the other day,  http://www.railwaysarchive.co.uk/OLE/
It describes the GW (Great Western) series 1 OHLE as using a "carrier wire neutral section" on pages 88/90.  I think because there are overlapping electrically isolated sections of contact wire over a significant distance this explains why they look so complex compared to inline insulators.

6.  AIUI (as I understand it) there is no boosting as such.  What the auto transformers do is to share the current 50/50 between the contact wire and the autotransformer feeder, (ATF).   Again, if you look at the section of the guide around pages 46/47 you can get an idea.   Because the current flowing in the contact wire and ATF are halved, then the transmission losses are significantly reduced because they are proportional to I2.

Paul
 
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7156


View Profile
« Reply #34 on: November 24, 2017, 12:35:54 »

1). Those sets of tall posts in pairs appear at all lineside sites so, even without ever seeing how one is wired, they obviously do make the electrical connection(s) to the OLE (Overhead Line Equipment, more often "OHLE"). At an ATS (Automatic Train Supervision), the autotransformer(s) just connect to the catenaries and ATFs. At an MTAPS (e.g. Maidenhead) there is a section break, left open in normal operation, needing switchgear and AT connections both sides of it. I can see four post pairs on the London side and two on the Reading side.

An SATS is in theory the same as an MPATS (Mid Point Auto Transformer Site - electrification), but with the break normally closed and only opened during fault/maintenance operation. An ATFS does not need a section break, or even ATs (e.g. Kensal Green). But for either of those at a junction, extra section breaks (and perhaps ATs) are needed. I have no idea where they are being put at Didcot or Reading, though there is more than enough ironmongery to make one around Kennet Bridge.

4). As implied above, you need breaks to separate power from separate feeds in all feeding modes that may arise. Only a few breaks are open normally, and how many others are provided will be the result of a "nice to have" versus "not on my budget" discussion.

5). When a pantograph transfers from one contact wire to the next, it connects them. You can't allow that at a section break, so there has to be an extra insulated wire run in between. How much length this takes is subject to a lot of variation.

6). There's no + and - involved, just two feeds of power opposite in phase (antiphase). That's like two pistons 180o apart on the crankshaft, or the directions your arms point if you stick them out sideways and twirl round until you fall over. I think it's simplest to see the ATF as a second wire that can carry a second, equal, reserve supply of power to top up the line feeds. Between ATs, trains draw power and the line voltage drops. By the magic of magnetic induction, the autotransformer responds to that voltage drop by taking power from the ATF, inverting its phase, and topping up the line catenary wires.

This inversion of phase results in similar currents in the two overhead feeds, but in antiphase (they would cancel if added) so only a small current flows to earth via the rails. That's useful, as too much earth/rail return current is a nuisance. (I think I2 and V2 are red herrings here.)
Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4356


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #35 on: November 24, 2017, 20:23:14 »

These may seem like daft questions but with so much now appearing at the trackside I hope some of the experts here will be able to answer them.

    1) There are four tall posts either side of the tracks just west of the old line into Didcot A Power Station. Are they part of the neutral section or is that nearer to Foxhall Junction?
The feeds to the OLE (Overhead Line Equipment, more often "OHLE") and ATF go on "across track" span wires from the OLE lineside switches to "drapes" that connect to the OLE  there are insulators segregate it all.  These are place well above the OLE to allow for a cross track span wire being alive when part of the OLE below it is isolated & earthed to work on

2) Maybe these masts that will eventually supply power from Didcot ATFS to the OLE west of Didcot as far as Wootton Bassett Junction? There is a cable trough back to the Didcot ATFS, and another one to a similar set of posts near Didcot North Junction for the Oxford lines.
To allow for parts of the Didcot triangle to be isolated yet maintain a feed north to Oxford cables are run at ground level, in BR (British Rail(ways)) days "bare feeders" were used on the side of the OLE structures however this causes problems in "emergency" isolations because the bare feeders have to be switch off as well.

3) Does this mean Didcot ATFS provides a power source for three sections - 1) Maidenhead MPATS (Mid Point Auto Transformer Site - electrification) to Milton, 2) Milton to Wootton Bassett and 3) Didcot to Oxford?
Yes that's the plan
It would be possible to feed Oxford from Wooton Basset in the event of a total loss at Didcot, however this would be second emergency feeding and would impose major timetable restrictions


4) Am I right in thinking there are only neutral sections where the source of power changes from one ASTF to another?
There are Neutral sections ate MPATS eg Maidenhead and ATFS eg Didcot.  When Bramley is built there will be Neutral sections at Reading

The neutral sections are needed for two reasons, 1) often the supply to the Grid transformers are taken from different phase pairs to allow for some balancing of the loading across the Grid, 2) to prevent power flow between Grid sites via the Railway OLE system.

5) Does anyone have a drawing showing the general arrangement of a GWEP (Great Western Electrification Program) neutral section?
The GWEP neutral sections are what are called carrier wire neutral sections, basically 3 over lap section of OLE, a floating section , an earthed section, a floating section.  The pan transitions form the live wire to
the floating section, then the earthed section to the floating section and onto the live section.

There were trials done to see if the earthed section could be done away with, not sure of the results of this.  The carrier wire neutral section does have by pass switches in the event a train gets stranded in a floating or earthed section

6) Finally, with an ATF system, does +25Kv phase flow through the OLE and -25Kv phase flow through the ATF cable and they come together at an ATS (Automatic Train Supervision), get boosted, and then repeat that to the next ATS and so on? [/list]

The + 25kV and - 25kV terms were used in the early days of the WCML (West Coast Main Line) conversion to AT to make it easy to explain to the lay railway(wo)man.   The system is 25 - 0 - 25kV the train only ever see 25kV but the power is distributed at 50kV there by reducing the I2R losses
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
Western Pathfinder
Global Moderator
Hero Member
*****
Posts: 1528



View Profile
« Reply #36 on: November 24, 2017, 21:40:06 »

Thanks chaps my head hurts less now.
Logged
rogerw
Global Moderator
Hero Member
*****
Posts: 1336



View Profile
« Reply #37 on: November 24, 2017, 22:32:01 »

Mine hurts more  Roll Eyes Roll Eyes
Logged

I like to travel.  It lets me feel I'm getting somewhere.
gwr2006
Sr. Member
****
Posts: 137


View Profile
« Reply #38 on: November 25, 2017, 17:00:58 »

Thanks to Electric train, stuving and paul7755 - I knew you guys would come up trumps!  Thanks for explaining it all - its slowly sinking in.
Logged
TonyK
Global Moderator
Hero Member
*****
Posts: 6435


The artist formerly known as Four Track, Now!


View Profile
« Reply #39 on: November 25, 2017, 21:12:08 »

Somebody had to invent all this stuff from nothing but a few equations, maybe developing a few more equations on the way!
Logged

Now, please!
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 2 [3]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page