Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 18:15 28 Mar 2024
- How do I renew my UK passport and what is the 10-year rule?
- Passengers pleaded with knifeman during attack
* Family anger at sentence on fatal crash driver, 19
- Easter travel warning as millions set to hit roads
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
28th Mar (1992)
MOD Kineton tour, branch line society (*)

Train RunningCancelled
16:54 Cardiff Central to London Paddington
17:48 Reading to Gatwick Airport
17:54 Cardiff Central to London Paddington
17:57 London Paddington to Worcester Foregate Street
18:03 London Paddington to Penzance
18:04 Bristol Temple Meads to Filton Abbey Wood
18:04 Bedwyn to Newbury
18:08 London Paddington to Frome
18:26 Newbury to Bedwyn
18:37 Westbury to Swindon
18:51 Filton Abbey Wood to Bristol Temple Meads
18:55 Bedwyn to Newbury
19:24 Newbury to Bedwyn
19:29 Gatwick Airport to Reading
19:33 London Paddington to Worcester Shrub Hill
19:55 Bedwyn to Newbury
20:13 Swindon to Westbury
20:16 Frome to Westbury
20:49 Newbury to Bedwyn
20:56 Worcester Foregate Street to London Paddington
21:16 Bedwyn to Newbury
Short Run
14:49 Plymouth to Cardiff Central
15:10 Gloucester to Weymouth
15:15 Plymouth to London Paddington
15:23 Portsmouth Harbour to Cardiff Central
15:30 Cardiff Central to Portsmouth Harbour
15:42 Exeter St Davids to London Paddington
16:19 Carmarthen to London Paddington
16:23 Portsmouth Harbour to Cardiff Central
16:35 London Paddington to Plymouth
16:50 Plymouth to London Paddington
17:03 London Paddington to Penzance
17:20 Reading to Gatwick Airport
17:30 London Paddington to Taunton
17:30 Warminster to Bristol Temple Meads
17:36 Swindon to Westbury
17:36 London Paddington to Plymouth
18:18 Newbury to London Paddington
18:19 Reading to Gatwick Airport
18:59 Gatwick Airport to Reading
19:06 London Paddington to Bedwyn
20:42 Bedwyn to London Paddington
Delayed
13:59 Cardiff Central to Penzance
14:15 Penzance to London Paddington
15:03 London Paddington to Penzance
16:03 London Paddington to Penzance
Additional 17:17 Exeter St Davids to Penzance
Additional 17:26 Castle Cary to Penzance
17:29 Gatwick Airport to Reading
17:59 Gatwick Airport to Reading
An additional train service has been planned to operate as shown 18:25 Shalford to Reading
etc
PollsOpen and recent polls
Closed 2024-03-25 Easter Escape - to where?
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
March 28, 2024, 18:26:58 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[133] West Wiltshire Bus Changes April 2024
[132] would you like your own LIVE train station departure board?
[53] Return of the BRUTE?
[44] If not HS2 to Manchester, how will traffic be carried?
[41] Infrastructure problems in Thames Valley causing disruption el...
[32] Reversing Beeching - bring heritage and freight lines into the...
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Poll
Question: What should be running From Ryde to Shanklin in 5 years time?  (Voting closed: June 26, 2018, 16:57:05)
Current trains - 2 (7.7%)
Newer cascaded tubes - 11 (42.3%)
Next generation tube trains - 5 (19.2%)
Trams / light rail with streeet running - 7 (26.9%)
Buses - 0 (0%)
Something else - 1 (3.8%)
Total Voters: 26

Pages: [1] 2 3 ... 15
  Print  
Author Topic: Island Line services, Isle of Wight. General discussion  (Read 56692 times)
grahame
Administrator
Hero Member
*****
Posts: 40690



View Profile WWW Email
« on: July 29, 2015, 15:30:02 »

http://onthewight.com/2015/07/28/cross-party-pressure-group-formed-to-secure-future-of-rail-franchise/

Quote
A new pressure group has been set up to help secure the future of the Island Line train service with a sustainable, reliable and viable service for the duration of the next franchise period.

A new pressure group has been formed to fight to keep Island Line train service within a wider regional rail franchise.

The Keep Island Line in Franchise (KILF) Campaign Group has been established after the future of the Island^s Ryde to Shanklin route has been threatened by a proposal to transfer it to a Community Interest Company.

Logged

Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
ChrisB
Transport Scholar
Hero Member
******
Posts: 12334


View Profile Email
« Reply #1 on: July 29, 2015, 15:32:18 »

Who's proposal, anyone know?
Logged
grahame
Administrator
Hero Member
*****
Posts: 40690



View Profile WWW Email
« Reply #2 on: July 29, 2015, 15:50:57 »

Who's proposal, anyone know?

Yes.













Andrew Turner.

http://www.iwcp.co.uk/news/news/new-campaign-group-to-fight-for-isle-of-wight-train-service-86488.aspx
Logged

Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
ChrisB
Transport Scholar
Hero Member
******
Posts: 12334


View Profile Email
« Reply #3 on: July 29, 2015, 17:17:15 »

How on earth does he expect a CIC (Community Interest Company ) company, based on the IoW, to be able to run/support the Island Line?

That ^40m is just the start....all hail the KILF, I say
Logged
JayMac
Moderator
Hero Member
*****
Posts: 18894



View Profile
« Reply #4 on: July 29, 2015, 22:23:45 »

Plenty of tube stock available if they want to replace the current 1938 stock.
Logged

"Build a man a fire and he'll be warm for the rest of the day. Set a man on fire and he'll be warm for the rest of his life."

- Sir Terry Pratchett.
patch38
Transport Scholar
Hero Member
******
Posts: 653


View Profile
« Reply #5 on: July 30, 2015, 09:46:10 »

Nooooo! The 485/486 (4VEC and 3TIS - see what they did there?) stock is part of the very fabric of the Island  Grin

Mind you, BNM is right: plenty of more youthful replacements available.
Logged
grahame
Administrator
Hero Member
*****
Posts: 40690



View Profile WWW Email
« Reply #6 on: June 19, 2018, 16:57:06 »

It just struck me that with all the talk of more hand-me-downs for the Isle of Wight, why not bite the bullet and add a run-on of a few more trains to the next newbuild tubes?    Statement suggests that costs are reduced by doing a big standard run

http://www.mayorwatch.co.uk/tfl-hires-siemens-to-build-94-next-generation-tube-trains-for-the-piccadilly-line/

This is totally unscientific to provoke discussion.   I have not added an O2 option though.
Logged

Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
JayMac
Moderator
Hero Member
*****
Posts: 18894



View Profile
« Reply #7 on: June 19, 2018, 17:48:36 »

Can the new trains be adapted to shorter lengths though.

Modern tube stock design is geared to fixed formation fully open walk through. The traction package is designed for the required length too.

I don't think it would be as simple as just paring down a full length train to 2/3 carriages length required by Island Line.
Logged

"Build a man a fire and he'll be warm for the rest of the day. Set a man on fire and he'll be warm for the rest of his life."

- Sir Terry Pratchett.
eightf48544
Transport Scholar
Hero Member
******
Posts: 4574


View Profile Email
« Reply #8 on: June 20, 2018, 09:01:07 »

Class 230s?  Possibly battery.

I believe one of the problems with using full sized trains is the restricted tunnel in Ryde. Would require gauge enhancement.
Logged
ray951
Transport Scholar
Hero Member
******
Posts: 461


View Profile
« Reply #9 on: June 20, 2018, 09:54:31 »

This London Reconnections article is worth reading about the future of the Wight line.
https://www.londonreconnections.com/2018/third-ryde-tube-transfer-troublesome/
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10095


View Profile
« Reply #10 on: June 20, 2018, 10:30:51 »

The trouble is there are numerous problems to overcome (both financial and technical) with all the potential solutions.  The quality of ride is shocking, especially at the southern end, so I feel the best way forward would be to do a proper job rather than a sticking plaster one with old D Stock or Piccadilly Line trains.  That would suggest re-laying most of the track, removing most if not all of the signalling, minor changes to the track layout so that a 20-minute interval service can operate, overhead electrification from Ryde St. Johns southwards and custom built trams that would operate on battery power between Ryde Pier Head and Ryde St. John's. 

Several new tram stops could be added at convenient locations in Ryde, and between Sandown and Shankling.  Indeed at Ryde you could consider an entirely new street section from Esplanade that removes the problem of Ryde Tunnel whilst taking trams through the centre of Ryde rather than the largely industrial area it currently passes through.

Who would pay for major works like that though?  It's unlikely that it would ever pay for itself, though there's no doubt in my mind that there is potential for significant growth to potentially reduce the losses.  Also, keeping the old trains going long enough to get those major works financed and built would be asking a lot.

I also like the idea of the steam railway somehow being able to share tracks through to Ryde.  Perhaps it could be the first tram/steam railway in the world?  Wink
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
Phantom
Global Moderator
Hero Member
*****
Posts: 484



View Profile
« Reply #11 on: June 20, 2018, 10:55:09 »

...The quality of ride is shocking

I stayed in Sandown last weekend and had the misfortune of catching the "train" to Ryde.
I forgot how bumpy and rocky the service was, at one point a young lad was even thrown from his (sideways) seat with the motion of one bump

Even a horse drawn carraige would be an improvement to what they currently have !
Logged
Fourbee
Hero Member
*****
Posts: 672


View Profile
« Reply #12 on: June 20, 2018, 11:10:15 »

The fares on the buses seemed expensive to me (Shanklin - Ventnor was £6 return when I was on the island in 2016, which was 2 x £3 singles as they don't do returns). Currently you can travel Ryde Pier Head - Shanklin day return for £6.10.

Maybe if all those ENCTS (English National Concessionary Travel Scheme) holders had to pay Island Line would have a few more quid in it's pocket...
Logged
eightf48544
Transport Scholar
Hero Member
******
Posts: 4574


View Profile Email
« Reply #13 on: June 20, 2018, 11:55:25 »

I also like the idea of the steam railway somehow being able to share tracks through to Ryde.  Perhaps it could be the first tram/steam railway in the world?  Wink

I'm afraid the Germans have got there first. Nordhausen to to Ifeld 1897 Mallet tanks and 2005? ED trams which run onto the streets of Nordhausen.

Also Karlesruhr extensive tram train system I've run behind steam up one of the tram lines.
Logged
grahame
Administrator
Hero Member
*****
Posts: 40690



View Profile WWW Email
« Reply #14 on: June 21, 2018, 06:23:53 »

Can the new trains be adapted to shorter lengths though.

Modern tube stock design is geared to fixed formation fully open walk through. The traction package is designed for the required length too.

I don't think it would be as simple as just paring down a full length train to 2/3 carriages length required by Island Line.

I'll give you a definite "don't know" on that.   The latest trains for the underground (S7 and S8) are subsurface rather than tube and probably would not fit (nor would D trains). But i do note 6 slightly different formations, powered axles in all carriages, and pickup shoes on end and 2 centre cars with power being passed to neighbouring cars via cable in all cases except one on the 7 car varient.  Unless the train software is written around 4 pickup cars per set, a 4 car formation - surely - shouldn't be too much of a problem.   3 and 2 cars slightly more questionable as none of the longer formations have a drive motor car without an attached car with motors but no pickup shoes.

Examples ...
8 car  DM M1 M2 MS MS M2 M1 DM
7 car  DM M1 MS MS M2 M1 DM
4 car  DM M1 M1 DM
3 car?  DM M1 DM
2 car?  DM DM
Logged

Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1] 2 3 ... 15
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page