Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 00:35 20 Apr 2024
- Some Wales roads to revert to 30mph after backlash
- BBC presenter reports racist abuse on London train
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
20th Apr (1789)
Opening of Sapperton Canal Tunnel

Train RunningShort Run
21:07 Gloucester to Bristol Temple Meads
Delayed
22:00 Hereford to London Paddington
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 20, 2024, 00:48:43 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[276] Somerset and Dorset Devonshire Tunnel flood
[265] Rail to refuge / Travel to refuge
[45] Rail delay compensation payments hit £100 million
[40] Problems with the Night Riviera sleeper - December 2014 onward...
[19] Difficult to argue with e-bike/scooter rules?
[18] Signage - not making it easy ...
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: [1]
  Print  
Author Topic: Overspeed Incident at Fletton Junction Peterborough  (Read 7616 times)
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« on: October 20, 2015, 17:08:11 »

Blimey this could have turned out to be very serious Shocked.....https://www.gov.uk/government/news/overspeed-at-fletton-junction

Most permanent way has some inbuilt redundancy in its strength but a 25mph turnout is fairly short in length and the stresses at double the design speed can place excessive forces on fixing components etc.
« Last Edit: October 20, 2015, 17:36:48 by SandTEngineer » Logged
John R
Hero Member
*****
Posts: 4416


View Profile
« Reply #1 on: October 20, 2015, 19:21:49 »

I guess it's possible that if the signal clears when the driver is trundling at around 25mph between the 2 TPWS (Train Protection and Warning System) points then he could then start to accelerate, pass the second point just under the trigger speed and continue accelerating. 

I'm not suggesting this did happen, just that it seems to be possible given the description and the diagram. TPWS appears to be based on trains that are travelling fast on the approach to a hazard and need slowing in the event of the driver having a lapse in concentration, whereas this one wasn't.

Logged
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #2 on: October 20, 2015, 19:49:57 »

I guess it's possible that if the signal clears when the driver is trundling at around 25mph between the 2 TPWS (Train Protection and Warning System) points then he could then start to accelerate, pass the second point just under the trigger speed and continue accelerating. 

I'm not suggesting this did happen, just that it seems to be possible given the description and the diagram. TPWS appears to be based on trains that are travelling fast on the approach to a hazard and need slowing in the event of the driver having a lapse in concentration, whereas this one wasn't.
You are quite corect.  In this case the TPWS calculations would be based upon a calculated maximum approach speed againt the required permanent speed resritiction ignoring the effect of any signals.  I'm not going to speculate further on what or may not have happend but this has always been a known risk.  TPWS cannot, and was not designed to, prevent things like this ever happening.
Logged
grahame
Administrator
Hero Member
*****
Posts: 40784



View Profile WWW Email
« Reply #3 on: October 20, 2015, 20:28:07 »

We don't yet know what went wrong in this case ... but I'm reminded from two overspeed incidents in our own area just how much worse the outcome can be ... and these are just two that sprung to mind

http://www.railwaysarchive.co.uk/docsummary.php?docID=421

http://danger-ahead.railfan.net/accidents/salisbry.htm

Logged

Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
chrisr_75
Hero Member
*****
Posts: 1019


View Profile
« Reply #4 on: October 21, 2015, 00:57:22 »

The picture in the linked page is a candidate for the 'Annoying / amusing use of completely irrelevant stock photos to illustrate press articles' thread, although isn't press article as such - I never knew they had 3rd rail electrical supply in Peterborough! Shame on you RAIB (Rail Accident Investigation Branch)!!
Logged
chrisr_75
Hero Member
*****
Posts: 1019


View Profile
« Reply #5 on: October 21, 2015, 01:13:27 »

Just seen the diagram in the report and what struck me was the curious sequence of speed restrictions the driver will have passed through in the space of less than 2.5 miles:

50mph on approach to PL1 at Peterborough (presumably followed by a stop at the platform)
70mph after the first set of points and then being slowed back to 25mph for the final set of points prior to entering the 105mph up fast.

Not seeking to speculate or incite speculation on the actual causes of this incident, just a general observation that jumped straight out at me from the diagram.
Logged
Bmblbzzz
Transport Scholar
Hero Member
******
Posts: 4256


View Profile
« Reply #6 on: October 21, 2015, 12:19:38 »

Obviously I've no idea what actually happened, but I'm wondering about psychological factors. We're told the train was about 20 minutes late arriving at Peterborough and was then held in the station. Could it be that the driver's consciousness of this was a factor?
Logged

Waiting at Pilning for the midnight sleeper to Prague.
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page