Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 06:35 20 Apr 2024
- Some Wales roads to revert to 30mph after backlash
- BBC presenter reports racist abuse on London train
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
20th Apr (1789)
Opening of Sapperton Canal Tunnel

Train RunningCancelled
05:15 Plymouth to Penzance
06:38 Weymouth to Gloucester
07:40 Penzance to Plymouth
08:15 Penzance to London Paddington
18:52 London Paddington to Great Malvern
19:19 Carmarthen to Swansea
Short Run
06:30 Cardiff Central to Portsmouth Harbour
06:50 Frome to Filton Abbey Wood
07:22 Exeter St Davids to Penzance
14:48 London Paddington to Carmarthen
21:07 Gloucester to Bristol Temple Meads
Delayed
05:25 Swansea to London Paddington
05:30 Bristol Temple Meads to London Paddington
06:28 Bristol Parkway to Weston-Super-Mare
06:30 Bristol Temple Meads to London Paddington
06:34 Great Malvern to Bristol Temple Meads
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 20, 2024, 06:45:26 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[276] Somerset and Dorset Devonshire Tunnel flood
[265] Rail to refuge / Travel to refuge
[45] Rail delay compensation payments hit £100 million
[40] Problems with the Night Riviera sleeper - December 2014 onward...
[19] Difficult to argue with e-bike/scooter rules?
[18] Signage - not making it easy ...
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: [1]
  Print  
Author Topic: Cross Over  (Read 6016 times)
Western Enterprise
Sr. Member
****
Posts: 134


View Profile Email
« on: December 18, 2015, 15:10:09 »

Hello Everyone.
I thought I would just share with everyone my journey in this morning.
I had caught the 8.35 Maidenhead to Paddington ^Turbo, a journey I regularly take. We switch on to the up main just before Slough and cross back onto the relief just after Ealing Broadway.
Passing through Broadway this time, the train was still whipping along at a good speed. Maximum for the unit is 90 and I would say we were probably not far off it.
Anyway we came up to the cross over and went over it at quite a rate of knots. I was in the front carriage and it shocked me from my seat ShockedHuh
Almost before we had reached the down relief (from up main), the brakes came on, almost emergency like. It was like the driver had just realised the speed was far too high. We continued braking until on the up relief and by this point the speed was noticeably less.
Usually, having used this crossing before, there is a noticeable braking prior to cross-over; followed by power back on once the cross is complete.
I don^t know what the speed limit is across here, but I would suspect 50/60/70?
Perhaps someone can advise?
I presume that the limit on these is set some way below the critical point at which train leaves track (which is also dependent upon rolling stock). 
What sort of safety margin is there?
I am a little concerned that this was dangerous and not a figment of my imagination, and feel I should report this, just in case this is part of a trend, but to whom?  Undecided Undecided
Incidentally, the unit was 166220!.
Logged
JayMac
Data Manager
Hero Member
******
Posts: 18918



View Profile
« Reply #1 on: December 18, 2015, 15:16:27 »

Question for the technical bods.

Aren't such junctions with a large speed differential approach controlled?

At the crossovers east of Ealing Broadway, according to the Sectional Appendix, the speed from Up Main to Down Relief is 70mph for Multiple Units. Speed from Down Relief to Up Relief is 35mph for Multiple Units.
« Last Edit: December 18, 2015, 15:26:32 by bignosemac » Logged

"Build a man a fire and he'll be warm for the rest of the day. Set a man on fire and he'll be warm for the rest of his life."

- Sir Terry Pratchett.
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #2 on: December 18, 2015, 15:39:33 »

I can answer later as I'm not at home at the moment and need to have a look at the relevant signalling notices.  However, if I remember correctly the Up Main junction signal at the end of Ealing Broadway station does not have a delayed clearance control to the Up Relief but has other signalling controls associated with it which are somewhat complex.  All of the crossovers that form the junction are 70mph for MU (Multiple Unit) (that is Multiple Units; which includes Turbos and HSTs (High Speed Train)).  The Down Relief to Up Relief crossover is however restricted to 35mph for non-MU trains.
« Last Edit: December 18, 2015, 16:29:20 by SandTEngineer » Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10116


View Profile
« Reply #3 on: December 18, 2015, 17:26:12 »

If I remember correctly there is a splitting distant (http://i.imgur.com/BGbIPul.jpg) signal just after West Ealing, which indicates the train will be crossing over the the Up Relief.  You then get a Junction Indicator 1 (http://upload.wikimedia.org/wikipedia/commons/thumb/4/43/Signal-routediverge1.jpg/105px-Signal-routediverge1.jpg) at the signal just off the end of Ealing Broadway station.  I believe the speed is also controlled by a TPWS (Train Protection and Warning System) overspeed sensor, but I would imagine that would trip at more than the 90mph that a Turbo would be doing as it's designed to ensure trains are braking from 125mph which would result in a derailment!  I believe most points are designed to be safely taken at around 25% over the permitted speed, which would be the equivalent of about 90mph in this case - though it would involve quite a lurch and is not recommended!

SandTEngineer should be able to confirm and elaborate on those details. 

If you wish to report it, then I'd just go through the normal customer service channels - If they consider it necessary they'd be able to pass it on to the driver managers who could arrange for the data recorder to be downloaded - details are held on them for a couple of days at least.

Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
IndustryInsider
Data Manager
Hero Member
******
Posts: 10116


View Profile
« Reply #4 on: December 19, 2015, 10:05:26 »

Almost before we had reached the down relief (from up main), the brakes came on, almost emergency like.

Just to add a couple of points from my post yesterday.  The braking system on a Turbo means that if the emergency brake is selected then you can't deselect it until the train is going less than 6 mph - so in other words it brings you to a grinding halt, so the most the driver could have selected was a 'full service' application.

Also, to add to my comments about a TPWS (Train Protection and Warning System) overspeed sensor, I had omitted to say that ATP (Automatic Train Protection) would also control the speed of the train on the 125mph capable stock that is used in the area, so there's no chance of the driver hitting the crossover at 125mph.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #5 on: December 20, 2015, 18:33:46 »

OK, you can find the explanation of how the junction signalling operates at Acton West Junction in Figure 9 to be found here:
http://www.railsigns.uk/info/jcnsig1/jcnsig1.html.

The difference from this drawing and the installation at Acton West Junction is that the 'Preliminary Route Indicator' is not required as the junction turnout (crossover) is designed for a linespeed of 70mph and the approaching linespeed is 125mph. There is sufficient braking distance between the splitting distant signal (SN212) and the Junction Signal (SN204) to allow the necessary braking from the 125mph maximum speed of a HST (High Speed Train) or 90mph maximum speed of a turbo to the 70mph of the turnout.

For those that are interested in a more detailed description of this method of junction signalling this can be found in Section 5.2.6 in Railway Group Standard GK/GN0645, Issue 4 to be found here (you need to enter 0645 in the search box as you cannot link to the actual document):
http://www.rssb.co.uk/railway-group-standards

I would not wish to speculate on the speed at which your train took the crossover but if you feel that you are still concerned then I suggest, as Industry Insider has stated in his post above, that you contact GWR (Great Western Railway) with details of your concern.  It would be interesting to see their response if you are happy to share it.
« Last Edit: December 20, 2015, 18:59:26 by SandTEngineer » Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page