Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 11:55 29 Mar 2024
* Easter getaway begins with flood alerts in place
* Attempted murder charge after man stabbed on train
- KFC Nigeria sorry after disabled diner refused service
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
29th Mar (1913)
Foundation of National Union or Railwaymen (*)

Train RunningCancelled
09:30 Weymouth to Gloucester
11:57 Bedwyn to Newbury
12:17 Westbury to Swindon
12:22 Newbury to Bedwyn
12:30 London Paddington to Weston-Super-Mare
12:52 Bedwyn to Newbury
13:15 Swindon to Westbury
13:21 Newbury to Bedwyn
13:48 Bedwyn to Newbury
14:12 Newbury to Bedwyn
14:15 London Paddington to Cardiff Central
14:19 Westbury to Swindon
14:57 Bedwyn to Newbury
15:14 Swindon to Westbury
15:22 Newbury to Bedwyn
15:28 Weston-Super-Mare to London Paddington
15:50 Bedwyn to Newbury
16:15 Newbury to Bedwyn
16:23 Westbury to Swindon
16:54 Cardiff Central to London Paddington
16:55 Bedwyn to Newbury
17:36 Swindon to Westbury
18:37 Westbury to Swindon
20:13 Swindon to Westbury
21:16 Westbury to Swindon
22:30 Swindon to Westbury
Short Run
08:35 Plymouth to London Paddington
09:37 London Paddington to Paignton
10:35 London Paddington to Exeter St Davids
10:55 Paignton to London Paddington
12:35 London Paddington to Exeter St Davids
13:10 Gloucester to Weymouth
13:42 Exeter St Davids to London Paddington
13:55 Paignton to London Paddington
14:36 London Paddington to Paignton
15:42 Exeter St Davids to London Paddington
16:35 London Paddington to Plymouth
16:50 Plymouth to London Paddington
17:03 London Paddington to Penzance
17:36 London Paddington to Plymouth
18:03 London Paddington to Penzance
18:36 London Paddington to Plymouth
19:04 Paignton to London Paddington
20:03 London Paddington to Plymouth
21:04 London Paddington to Plymouth
Delayed
07:10 Penzance to London Paddington
08:03 London Paddington to Penzance
08:15 Penzance to London Paddington
09:04 London Paddington to Plymouth
09:10 Penzance to London Paddington
10:00 London Paddington to Bristol Temple Meads
10:04 London Paddington to Penzance
10:20 Penzance to London Paddington
11:03 London Paddington to Plymouth
12:03 London Paddington to Penzance
12:15 Penzance to London Paddington
etc
PollsOpen and recent polls
Closed 2024-03-25 Easter Escape - to where?
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
March 29, 2024, 12:05:07 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[124] Infrastructure problems in Thames Valley causing disruption el...
[53] would you like your own LIVE train station departure board?
[49] West Wiltshire Bus Changes April 2024
[48] Reversing Beeching - bring heritage and freight lines into the...
[43] Return of the BRUTE?
[30] 2024 - Service update and amendment log, Swindon <-> Westbury...
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: [1] 2
  Print  
Author Topic: Carmarthen to Aberystwyth railway  (Read 14003 times)
welshman
Sr. Member
****
Posts: 277


View Profile
« on: October 20, 2016, 00:15:18 »

Welsh Government draft budget for 2017-18 includes the following:

As part of our Budget agreement with Plaid Cymru, we are allocating £0.5m in 2017-18 to conduct feasibility studies into the re-opening of the Carmarthen to Aberystwyth railway line and establishing a national cycleway,

£300,000 is allocated to the rail study.  The aim is a 90 minute journey time.  Only 3% of the line has been built on.

One day, maybe...
Logged
chrisr_75
Hero Member
*****
Posts: 1019


View Profile
« Reply #1 on: October 20, 2016, 00:36:36 »

Welsh Government draft budget for 2017-18 includes the following:

As part of our Budget agreement with Plaid Cymru, we are allocating £0.5m in 2017-18 to conduct feasibility studies into the re-opening of the Carmarthen to Aberystwyth railway line and establishing a national cycleway,

£300,000 is allocated to the rail study.  The aim is a 90 minute journey time.  Only 3% of the line has been built on.

One day, maybe...

They're still continuing to ruminate over the M4 relief road, so a backwater railway line miles away from Cardiff has little chance I suspect!
Logged
Noggin
Hero Member
*****
Posts: 514


View Profile
« Reply #2 on: October 20, 2016, 10:47:19 »

Welsh Government draft budget for 2017-18 includes the following:

As part of our Budget agreement with Plaid Cymru, we are allocating £0.5m in 2017-18 to conduct feasibility studies into the re-opening of the Carmarthen to Aberystwyth railway line and establishing a national cycleway,

£300,000 is allocated to the rail study.  The aim is a 90 minute journey time.  Only 3% of the line has been built on.

One day, maybe...

They're still continuing to ruminate over the M4 relief road, so a backwater railway line miles away from Cardiff has little chance I suspect!

A relatively cheap token gesture to placate the residents of west Wales I would suggest. The BCR (Benefit Cost Ratio) is unlikely to be great, though a roughly costed scheme could be useful bargaining chip with Westminster.




Edit note: Quote marks fixed, for clarity. CfN.
« Last Edit: October 20, 2016, 17:18:56 by Chris from Nailsea » Logged
grahame
Administrator
Hero Member
*****
Posts: 40692



View Profile WWW Email
« Reply #3 on: November 09, 2018, 10:28:06 »

Welsh Government draft budget for 2017-18 includes the following:

As part of our Budget agreement with Plaid Cymru, we are allocating £0.5m in 2017-18 to conduct feasibility studies into the re-opening of the Carmarthen to Aberystwyth railway line and establishing a national cycleway,

£300,000 is allocated to the rail study.  The aim is a 90 minute journey time.  Only 3% of the line has been built on.

One day, maybe...

Report at https://beta.gov.wales/sites/default/files/publications/2018-10/aberystwyth-to-carmarthen-rail-reinstatement-feasibility-study.pdf
Logged

Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #4 on: November 09, 2018, 10:51:55 »

Interesting report.  Noted that they are proposing the PENRYN solution for passing loop stations.  However, my feeling is that trying to reinstate a railway after such a long time to modern environmental and safety requirements is a non-starter (just look at the number of road diversions and new overbridges required).  Nice try though Grin
« Last Edit: November 09, 2018, 11:04:56 by SandTEngineer » Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10096


View Profile
« Reply #5 on: November 09, 2018, 11:32:06 »

Yes, there's a long list of reopenings that should be ahead of this one in the queue.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
Red Squirrel
Administrator
Hero Member
*****
Posts: 5191


There are some who call me... Tim


View Profile
« Reply #6 on: November 09, 2018, 11:35:08 »

Hmm...

Quote
...it is readily apparent that the scheme does not present a positive economic case.

As such the scheme is only likely to be progressed in regard to wider societal needs, and strategic aims, the consideration of which is beyond the scope of this study.

...or any other, at a guess.

A welsh friend once suggested that Cardiff was a rotten place to have as the capital of Wales because it is so difficult to get to from the north of the principality. Shrewsbury would have been much better, if only certain difficulties could have been overcome (like it being in England).

To get from Aberystwyth to Cardiff by train, via Shrewsbury, takes between four and four-and-a-half hours. The suggested running time for Aberystwyth - Carmarthen is 80 mins, so realistically (allowing for a change and 105 mins from Carmarthen to Cardiff) it should be possible to shave over an hour off that journey.

Ultimately, though, the population of Aberystwyth is broadly similar to Melksham's. This scheme is costed at around three quarters of a billion quid. Sadly I can't see how it would ever add up, unless they impose a one-off poll tax of £45,000 each on every man, woman and child on Aber...
Logged

Things take longer to happen than you think they will, and then they happen faster than you thought they could.
grahame
Administrator
Hero Member
*****
Posts: 40692



View Profile WWW Email
« Reply #7 on: November 09, 2018, 12:42:01 »

A welsh friend once suggested that Cardiff was a rotten place to have as the capital of Wales because it is so difficult to get to from the north of the principality. Shrewsbury would have been much better, if only certain difficulties could have been overcome (like it being in England).

Logic might suggest the geographic centre of Wales - which is Carno.
https://www.bbc.co.uk/news/uk-wales-mid-wales-41241593

Logged

Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
Sixty3Closure
Hero Member
*****
Posts: 501


View Profile
« Reply #8 on: November 10, 2018, 01:30:12 »

Having lived in Aberystwyth and worked in Pembroke at the same time this would have been great rather than the very long bus trip with changes.

Apart from my personal requirements from 30 years ago though I think the proposal does raise some valid questions about North/South transport. As Red Squirrel mentions transport links to Cardiff are poor from the rest of Wales so there's maybe a political argument for it.

At the moment anyone from North and Central Wales has to take the very long route round. And while the population of Aberystwyth is low it is a university town with a lot of students from Cardiff/Swansea as well as tourist trade and the rail line could open it up a lot more.

I think the business case would need to be more about the wider social impact rather than the headline number of passengers.

Logged
CyclingSid
Data Manager
Hero Member
******
Posts: 1918


Hockley viaduct


View Profile
« Reply #9 on: November 11, 2018, 14:13:21 »

Is the next alternative the old Mid Wales line; Newtown. Llanidloes, Rhayader, Builth and Brecon. Bring them a bit closer to Cardiff. Apologies for English spellings, old brain can't manage the Welsh anymore (if it ever could!).
Logged
grahame
Administrator
Hero Member
*****
Posts: 40692



View Profile WWW Email
« Reply #10 on: April 20, 2019, 15:16:07 »

Looking though an old timetable (for posting in another thread), I note that at certain times of day the fastest way from London to Aberystwyth was via Carmarthen ...

Logged

Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
Oxonhutch
Transport Scholar
Hero Member
******
Posts: 1244



View Profile
« Reply #11 on: April 20, 2019, 16:20:30 »

And in 1963, you could more quickly access some of those destinations via Caernarvon ex the Premier Line
Logged
Red Squirrel
Administrator
Hero Member
*****
Posts: 5191


There are some who call me... Tim


View Profile
« Reply #12 on: December 07, 2019, 12:30:07 »

Scanning through the Plaid Cymru manifesto, as you do, I came across this under 'Welsh Green Jobs Revolution - Communications Infrastructure:

Quote
Projects could include...
Creating a trans-Wales railway: connecting Wales' coastal communities by reopening the Carmarthen to Aberystwyth line together with a second phase linking our communities from north to south.

I'm more intrigued by the 'second phase'... could they really be thinking of going over the hills from Morfa Mawddach to Rhyl?






Logged

Things take longer to happen than you think they will, and then they happen faster than you thought they could.
grahame
Administrator
Hero Member
*****
Posts: 40692



View Profile WWW Email
« Reply #13 on: December 07, 2019, 12:35:32 »

Scanning through the Plaid Cymru manifesto, as you do, I came across this under 'Welsh Green Jobs Revolution - Communications Infrastructure:

Quote
Projects could include...
Creating a trans-Wales railway: connecting Wales' coastal communities by reopening the Carmarthen to Aberystwyth line together with a second phase linking our communities from north to south.

I'm more intrigued by the 'second phase'... could they really be thinking of going over the hills from Morfa Mawddach to Rhyl?


Curve to link lines at Minfforrd, regauging to just north of Tan y Grisiau, new curve to line through the existing tunnel to Roman Bridge,  I suspect  Grin.  Joining up successful railways. Who could possibly object??
Logged

Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
Red Squirrel
Administrator
Hero Member
*****
Posts: 5191


There are some who call me... Tim


View Profile
« Reply #14 on: December 07, 2019, 12:44:40 »

I'll buy you a crayon-sharpener for Xmas...
Logged

Things take longer to happen than you think they will, and then they happen faster than you thought they could.
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1] 2
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page