Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 20:15 16 Apr 2024
- Birmingham Airport suspends operations over security incident
- Birmingham Airport flights disrupted by incident
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
16th Apr (1987)
~ Tulyar arrives at Swanley New Barn Railway (link)

Train RunningCancelled
19:30 London Paddington to Weston-Super-Mare
22:44 Taunton to Bristol Temple Meads
17/04/24 00:45 London Paddington to Reading
Short Run
16:50 Penzance to Cardiff Central
18:38 Barnstaple to Exmouth
19:56 Cardiff Central to Taunton
23:24 Didcot Parkway to London Paddington
Delayed
An additional train service has been planned to operate as shown 19:48 Exeter St Davids to Exmouth
An additional train service has been planned to operate as shown 21:26 Bristol Temple Meads to Cardiff Central
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 16, 2024, 20:33:07 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[303] Problems with the Night Riviera sleeper - December 2014 onward...
[71] New station at Ashley Down, Bristol
[69] BBC Great Coastal Railway Journeys - A Correction
[69] Proposals for open access services on new routes
[65] Okehampton
[51] First tour train of season
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: 1 [2]
  Print  
Author Topic: Service reductions - London to Brussels and Paris - from January 2017  (Read 4396 times)
stuving
Transport Scholar
Hero Member
******
Posts: 7162


View Profile
« Reply #15 on: November 24, 2016, 01:11:06 »

Hmmm, I still think it's more than desirables, sorry. And you can't produce any evidence either. Other fora seem to think this way too.

I think I can see how that's gone now - yet hasn't really.

Originally just one safety requirement specifically about passenger trains came from the concession:
Quote
(ii) Except where operating rules otherwise permit, all trains shall be equipped with two
locomotives, one situated at the head and the other at the rear of the train enabling the train to
be split and to reverse direction. This arrangement may be modified for certain types of trains
(particularly in the case of freight trains) and in certain operating conditions provided that the
operating rules are followed.
- and even that is secondary to Eurotunnel's operating rules.

The rest were a matter of Eurotunnel alone, or Eurostar in negotiation with them, proposing safety rules to the IGC (Intergovernmental Commission). The IGC approved those based on advice from their safety advisers, and the resulting rules were not, I'm pretty sure, published.

Since then the legal framework has changed because of domestic changes in Britain and France, and a bigger one with the introduction of the European Railway Agency and the TSIs. At the same time, the IGC held a review and consultation about the operating experience and whether all the rules were needed, during which Eurostar and other operators (DB» (Deutsche Bahn - German State Railway - about)) started asking if they could other trains, even ones not designed specifically for the tunnel.

The IGC came out with their conclusions in 2010, removing some requirements. They notified the ERA, who decided to respond to that (in 2011) as an enquiry about its compatibility with the TSIs. It isn't clear if there has been an further change by the IGC in response to the ERA.

The general trend in these safety regimes has been to get less prescriptive, and rely more on applicants making a safety case to be approved against a set of principles. In railways this involved applying the "Common Safety Methods" in a risk assessment. So while Eurotunnel do still put the conditions for access in their Network Statements, the safety rules are only referred to, and even may have fewer fixed rules.

The contentious rules about minimum length and end to end gangways are there for one reason: to allow evacuation via one or two doors close to a cross-passageway where the tunnel is full of smoke (or other similar hazards). They were "normally required" before to provide "the optimum conditions of safety". Now, the approach is to say other trains are allowed if you can make a convincing case that they can be evacuated safely in the event of a fire. So far no-one has, and it's hard to see how they could unless the safety philosophy changes.
Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 12357


View Profile Email
« Reply #16 on: November 24, 2016, 09:14:32 »

That makes more sense. Thanks
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 [2]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page