Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 12:55 29 Mar 2024
* Delays at Dover as millions begin Easter getaway
- Attempted murder charge after man stabbed on train
- KFC Nigeria sorry after disabled diner refused service
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
29th Mar (1913)
Foundation of National Union or Railwaymen (*)

Train RunningCancelled
09:30 Weymouth to Gloucester
12:17 Westbury to Swindon
12:30 London Paddington to Weston-Super-Mare
12:52 Bedwyn to Newbury
13:15 Swindon to Westbury
13:15 London Paddington to Cardiff Central
13:21 Newbury to Bedwyn
13:48 Bedwyn to Newbury
14:12 Newbury to Bedwyn
14:15 London Paddington to Cardiff Central
14:19 Westbury to Swindon
14:57 Bedwyn to Newbury
15:14 Swindon to Westbury
15:22 Newbury to Bedwyn
15:28 Weston-Super-Mare to London Paddington
15:50 Bedwyn to Newbury
15:54 Cardiff Central to London Paddington
16:15 Newbury to Bedwyn
16:23 Westbury to Swindon
16:54 Cardiff Central to London Paddington
16:55 Bedwyn to Newbury
17:36 Swindon to Westbury
18:37 Westbury to Swindon
20:13 Swindon to Westbury
21:16 Westbury to Swindon
22:30 Swindon to Westbury
Short Run
09:37 London Paddington to Paignton
10:35 London Paddington to Exeter St Davids
10:55 Paignton to London Paddington
12:35 London Paddington to Exeter St Davids
13:10 Gloucester to Weymouth
13:42 Exeter St Davids to London Paddington
13:55 Paignton to London Paddington
14:36 London Paddington to Paignton
15:42 Exeter St Davids to London Paddington
16:35 London Paddington to Plymouth
16:50 Plymouth to London Paddington
17:03 London Paddington to Penzance
17:36 London Paddington to Plymouth
18:03 London Paddington to Penzance
18:36 London Paddington to Plymouth
19:04 Paignton to London Paddington
20:03 London Paddington to Plymouth
21:04 London Paddington to Plymouth
Delayed
08:03 London Paddington to Penzance
08:15 Penzance to London Paddington
09:04 London Paddington to Plymouth
09:10 Penzance to London Paddington
10:04 London Paddington to Penzance
10:20 Penzance to London Paddington
11:03 London Paddington to Plymouth
12:03 London Paddington to Penzance
12:15 Penzance to London Paddington
13:03 London Paddington to Plymouth
13:15 Plymouth to London Paddington
etc
PollsOpen and recent polls
Closed 2024-03-25 Easter Escape - to where?
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
March 29, 2024, 12:56:04 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[103] Infrastructure problems in Thames Valley causing disruption el...
[102] 2024 - Service update and amendment log, Swindon <-> Westbury...
[56] Travel for free on the m2 metrobus - Bristol - 4,5,6 April 202...
[44] would you like your own LIVE train station departure board?
[41] West Wiltshire Bus Changes April 2024
[40] Reversing Beeching - bring heritage and freight lines into the...
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: 1 [2]
  Print  
Author Topic: Oxford Road and Southcote Junctions Grade Seperation  (Read 11737 times)
stuving
Transport Scholar
Hero Member
******
Posts: 7156


View Profile
« Reply #15 on: April 06, 2017, 13:09:59 »

And another point arising from the Wessex Route Study, while I'm at it. It says there that the extra multi-modal path - the one that does the camel's-back thing to the junction - would have to be routed via Laverstoke and Andover anyway. There are capacity issues via Winchester, related to the length of twin-track that you'd be expecting trains of dissimilar speeds to share. So there is muttering (p 98) about extra loops, including a pair four miles long around Micheldever - but only to meet the 2043 requirement (i.e. CP10).

But if the Basingstoke grade separation - needed sooner - can't be done, or can't be approved due to its cost, wouldn't that change the arguments about where some of those container trains should be routed further north?
Logged
Gordon the Blue Engine
Transport Scholar
Hero Member
******
Posts: 752


View Profile
« Reply #16 on: April 06, 2017, 13:57:12 »

Grade separation is the ultimate “nice to have” solution to increase capacity and timetable robustness at flat junctions.  I’m not convinced that grade separation at Southcote J, which would be difficult and thus expensive, is necessary.  My modest idea to have reversible working on both lines between Reading Station and Southcote J, plus a new trailing crossover just west of Southcote J, would provide extra pathing opportunities at modest cost.   There must be many busier junction that work quite happily being flat – although long slow freights do complicate the comparison.

I think Basingstoke has a stronger case for grade separation.  My solution, not yet developed to Oxonhutch standards, is to double the flyover at Worting Junction, and then to add/ rearrange the tracks through Basingstoke so that southbound FL’s can stay north of the Southampton ML’s, go over the widened flyover, and then join the Southampton Down Line south of Worting Junction.

Worting J is in open country so land take would be easier.
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5316


View Profile
« Reply #17 on: April 06, 2017, 14:14:47 »

Having said that about the empty space around Basingstoke station, it occurred to me that I don't have (and can't find) any recent maps or images to check for encroachments. But I can think of two I've heard about - the ROC (Rail Operating Centre - a centralised location for railway signalling and train control operations for a specific route or region) just to the north and Basingstoke Campus on the junction triangle.

The relatively new signal building (known as Basingstoke New) alongside P5 (so immediately north of the station) is only temporary, it will all be moved into the ROC in due course.   The future ROC is the main function contained in the Basingstoke Campus, the training etc is the sideline.  The Campus is well away from any track.

But I think NR» (Network Rail - home page) are trying to do far too much in the station area with the proposals in the Wessex route study.  I suggest they would be far better running the pair of Reading lines west of the station through two full length platforms, and sorting out the grade separation of the down line of that pair somewhere between Basingstoke and Working Jn. There's no real need for it to be at or near the existing flyover - doing it further east may allow it to descend between the two existing down lines which would possibly be more flexible.  The up line would just be a normal junction off the existing up slow.

If they still want a bay for Reading stoppers, then move it onto the other side of the existing platform.  Then the existing bay becomes P6, and a new up line towards Reading a P7.   Then leave the existing junction alone for reversionary routes during maintenance.

Paul
« Last Edit: April 06, 2017, 14:25:50 by paul7755 » Logged
Gordon the Blue Engine
Transport Scholar
Hero Member
******
Posts: 752


View Profile
« Reply #18 on: April 06, 2017, 18:13:31 »

Yes, I think Paul 7755 and I have come up with the same key proposal, which is to run the Reading lines independently through Basingstoke station, and then to put in a grade separated junction to the west.  Whether you go for widening the flyover at Worting J or by some other grade separation between there and Basingstoke station is a detail which can follow later - exactly what you do would involve modelling of the options against the present and planned timetables.

(The layout north of East Croydon emerged from a project done by some management trainees in the 1970's, who came up with various ideas - there were quite a few - on grade separation and where various line went, and they modelled as above.)
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5316


View Profile
« Reply #19 on: April 07, 2017, 10:57:47 »

[Re Basingstoke]

Another question is whether you have to remove every flat crossing move whatsoever.

If the up and down Reading lines ran through the station (what I suggested might be P6 and P7), would you really need an up direction passenger platform anyway?   Up direction XC (Cross Country Trains (franchise)) services that currently pass through P4, (and are the majority of P4 services over the course of the day), could continue to do so using the existing route - they'd only have to be timed to cross with any down freights coming from Reading. 

Another suggestion to deal with the trains that terminate at Basingstoke, once down XC services are out of the picture over on a new through P6, then how about using P1 as the main through platform for down direction trains and putting the terminating trains in P2, from where they can return onto the up fast?

Paul

« Last Edit: April 07, 2017, 11:43:39 by paul7755 » Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 [2]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page