Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 06:15 29 Mar 2024
- Bus plunges off South Africa bridge, killing 45
- Easter getaway begins with flood alerts in place
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
29th Mar (1913)
Foundation of National Union or Railwaymen (*)

Train RunningCancelled
06:24 Newbury to Bedwyn
06:30 Bristol Temple Meads to London Paddington
07:00 Bedwyn to Newbury
07:22 Newbury to Bedwyn
07:49 Bedwyn to Newbury
08:13 Newbury to Bedwyn
08:46 Bedwyn to Newbury
09:54 Bedwyn to Newbury
10:22 Newbury to Bedwyn
11:29 Newbury to Bedwyn
11:57 Bedwyn to Newbury
12:52 Bedwyn to Newbury
Short Run
04:54 Plymouth to London Paddington
05:23 Hereford to London Paddington
05:33 Plymouth to London Paddington
05:55 Plymouth to London Paddington
06:00 Bedwyn to London Paddington
06:37 Plymouth to London Paddington
07:03 London Paddington to Paignton
08:35 Plymouth to London Paddington
10:35 London Paddington to Exeter St Davids
Delayed
23:45 London Paddington to Penzance
05:03 Penzance to London Paddington
06:05 Penzance to London Paddington
07:10 Penzance to London Paddington
08:03 London Paddington to Penzance
08:15 Penzance to London Paddington
09:04 London Paddington to Plymouth
09:37 London Paddington to Paignton
10:04 London Paddington to Penzance
11:03 London Paddington to Plymouth
PollsOpen and recent polls
Closed 2024-03-25 Easter Escape - to where?
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
March 29, 2024, 06:27:18 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[82] would you like your own LIVE train station departure board?
[76] West Wiltshire Bus Changes April 2024
[74] Reversing Beeching - bring heritage and freight lines into the...
[67] Return of the BRUTE?
[57] Infrastructure problems in Thames Valley causing disruption el...
[46] 2024 - Service update and amendment log, Swindon <-> Westbury...
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 13 14 [15] 16 17 ... 78
  Print  
Author Topic: Great Western Main Line electrification - ongoing discussion  (Read 283499 times)
Electric train
Transport Scholar
Hero Member
******
Posts: 4356


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #210 on: May 05, 2018, 08:31:35 »

Incidentally, in that picture the Foxhall Junction ATFS is over on the right, and close to it there is a kind of compost bin halfway up a pole. That is a braking resistor.

These are needed in case there are no trains drawing power when one (or more) are regenerating, so trying to put power back into the supply. However, I don't think this one is sized to do that for very long. IETs (Intercity Express Train) are required to provide regenerative braking, but to turn this off if the OLE (Overhead Line Equipment, more often "OHLE") voltage rises above 29 kV. They are allowed 100 ms to do this, so the energy to be dumped is not very large - but the resistor is still needed.

With no resistor the line voltage could rise too fast, so the voltage could still reach a damaging level before the IET reacts. I suspect it is also there to cope if a train "forgets" to turn off its regeneration.

Its not a "breaking resistor" its called a damper but electrically it is a harmonic filter and also helps with power factor correction.   The train regulates the re-gen braking it can only raise to a certain voltage after that the train dumps the energy in to resistors on board the train.

Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
stuving
Transport Scholar
Hero Member
******
Posts: 7156


View Profile
« Reply #211 on: May 05, 2018, 10:03:16 »

Incidentally, in that picture the Foxhall Junction ATFS is over on the right, and close to it there is a kind of compost bin halfway up a pole. That is a braking resistor.

These are needed in case there are no trains drawing power when one (or more) are regenerating, so trying to put power back into the supply. However, I don't think this one is sized to do that for very long. IETs (Intercity Express Train) are required to provide regenerative braking, but to turn this off if the OLE (Overhead Line Equipment, more often "OHLE") voltage rises above 29 kV. They are allowed 100 ms to do this, so the energy to be dumped is not very large - but the resistor is still needed.

With no resistor the line voltage could rise too fast, so the voltage could still reach a damaging level before the IET reacts. I suspect it is also there to cope if a train "forgets" to turn off its regeneration.

Its not a "breaking resistor" its called a damper but electrically it is a harmonic filter and also helps with power factor correction.   The train regulates the re-gen braking it can only raise to a certain voltage after that the train dumps the energy in to resistors on board the train.

OK, I stand corrected on that one. Big lineside resistors are used for both purposes (and probably a few others).

In fact, I recall seeing in one article about the order for 802s that not only did they get higher engine rating (for going up more hills) and bigger fuel tanks (for going further) but also bigger on-board resistors (for going down more hills). In that case the same braking resistors are used with no external power supply, of course. That does suggest that these roof-mounted resistors are sized to provide all the electric braking the train needs without having to send any power off-board as regeneration.

Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4356


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #212 on: May 05, 2018, 17:06:05 »

Incidentally, in that picture the Foxhall Junction ATFS is over on the right, and close to it there is a kind of compost bin halfway up a pole. That is a braking resistor.

These are needed in case there are no trains drawing power when one (or more) are regenerating, so trying to put power back into the supply. However, I don't think this one is sized to do that for very long. IETs (Intercity Express Train) are required to provide regenerative braking, but to turn this off if the OLE (Overhead Line Equipment, more often "OHLE") voltage rises above 29 kV. They are allowed 100 ms to do this, so the energy to be dumped is not very large - but the resistor is still needed.

With no resistor the line voltage could rise too fast, so the voltage could still reach a damaging level before the IET reacts. I suspect it is also there to cope if a train "forgets" to turn off its regeneration.

Its not a "breaking resistor" its called a damper but electrically it is a harmonic filter and also helps with power factor correction.   The train regulates the re-gen braking it can only raise to a certain voltage after that the train dumps the energy in to resistors on board the train.

OK, I stand corrected on that one. Big lineside resistors are used for both purposes (and probably a few others).

In fact, I recall seeing in one article about the order for 802s that not only did they get higher engine rating (for going up more hills) and bigger fuel tanks (for going further) but also bigger on-board resistors (for going down more hills). In that case the same braking resistors are used with no external power supply, of course. That does suggest that these roof-mounted resistors are sized to provide all the electric braking the train needs without having to send any power off-board as regeneration.



Those "sheds" as they were called were first installed on the WCML (West Coast Main Line) in around 2000 for the introduction of the Pendolino's. 
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
ellendune
Transport Scholar
Hero Member
******
Posts: 4452


View Profile
« Reply #213 on: May 10, 2018, 19:27:10 »

I saw a lot of knitting in Swindon Station last week though by no means complete.

I also notices some additional switchgear going in at the Dicot feeder is this for the swindon section?

I'm puzzled by that. The ATFS enclosure at Foxhall Junction looked to be fully populated when first built, so where would they put any new bits?

It seems to be a separate enclosure a few metres to the West

I had an opportunity to go and look at this today, and I reckon it's a bunch of isolators or track switches. So that is switchgear in a sense, but not the usual one of protection (circuit breakers). They are usually found on top of OLE (Overhead Line Equipment, more often "OHLE") structures, next to points, allowing each running track to be isolated in case of a failure while keeping the rest in use. That means they are OLE components, not part of the ATFS.

As a switch connecting across an insulated gap in the conductor/catenary pair, a position close to the gap is preferred as it keeps the 25 kV wires short. The operating rods can run from the side of the track, where operation is either manual or motorised. However, in this case a small copse of stanchions has been built instead of using the OLE supports. That does seem rather odd.

Presumably they will provide isolation of the OLE at the four crossovers west of Foxhall junction itself, and perhaps some more as well (there a ten stanchions with I think one switch each). But how will the 25kV connections get to various places above the track? Such leads from the ATFS call for overheight stanchions both side of the line, and ther's no sign of them yet.

Anyway, here's a picture of the forest...

I went past again today.  There seem to be three enclosures.  The main one at the rear of the Stuving's picture is I believe the feeder.  Then behind that there is another completed smaller enclosure similar to the one being built.   
Logged
ellendune
Transport Scholar
Hero Member
******
Posts: 4452


View Profile
« Reply #214 on: May 10, 2018, 19:29:22 »

I also noticed the wiring in Swindon Station is nearing completion.  On Tuesday the south side of the station had been done and by today most of the north side had been done as well.  Lots of shiny copper wire!
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7156


View Profile
« Reply #215 on: May 10, 2018, 19:44:47 »

I went past again today.  There seem to be three enclosures.  The main one at the rear of the Stuving's picture is I believe the feeder.  Then behind that there is another completed smaller enclosure similar to the one being built.   

The enclosure behind (i.e. east) of the ATFS is the National Grid's 25 kV substation, which does contain ground-mounted switchgear, plus a tin shed. It is at the end of the buried cable link that starts in their 400 kV substation by the power station, where the two 400/25 kV transformers are.
Logged
martyjon
Transport Scholar
Hero Member
******
Posts: 1941


View Profile
« Reply #216 on: May 10, 2018, 20:04:19 »

I have been watching the wiring work near my residence. It would appear to me that two work compounds near me are being used as training schools for a wiring gang. Both lines have the overhead wires in place for a short stretch but stanchion to stanchion wiring remains to be done. I'm also intrigued by the varying heights of some stanchions, one pair of stanchions has a gantry affixed so that the top side of the gantry and the top of the stanchions are level but he next pair of stanchions has a gantry affixed at the same height with the pair of stanchions protruding above the gantry by a metre or so whilst another stanchion has what looks like a tubular bracket strapped to it to provide an at contact height the copper wire OHL (Over-Head Line) whilst the stanchion top rises to more than twice the height of the height from the pile cap to the strapped tubular bracket. Weird.
Logged
onthecushions
Transport Scholar
Hero Member
******
Posts: 977


View Profile
« Reply #217 on: May 15, 2018, 19:05:42 »


While it's not GWML (Great Western Main Line) electrification, two return journeys were made using the OLE (Overhead Line Equipment, more often "OHLE") by Pendolino 390 152 "Virgin Knight" from Preston to Blackpool North,  overnight (14/15) without incident.

Well done.

OTC
Logged
TonyK
Global Moderator
Hero Member
*****
Posts: 6435


The artist formerly known as Four Track, Now!


View Profile
« Reply #218 on: May 16, 2018, 23:51:40 »


While it's not GWML (Great Western Main Line) electrification, two return journeys were made using the OLE (Overhead Line Equipment, more often "OHLE") by Pendolino 390 152 "Virgin Knight" from Preston to Blackpool North,  overnight (14/15) without incident.

Well done.

OTC

I'm pleased! For the year up to November last, I made regular trips to Blackpool North, and could see the electrification taking shape from the start. My last trip by rail was just before the long, long closure of the line, and sadly my future trips are likely to be infrequent and accompanied, so by car.
Logged

Now, please!
Thatcham Crossing
Transport Scholar
Hero Member
******
Posts: 793


View Profile
« Reply #219 on: May 17, 2018, 09:04:35 »

Wires going up through Theale Station when I was there late last night.
Logged
onthecushions
Transport Scholar
Hero Member
******
Posts: 977


View Profile
« Reply #220 on: May 18, 2018, 17:46:50 »


....and ORR» (Office of Rail and Road formerly Office of Rail Regulation - about) is reported to have signed off NWEP 3 (Blackpool N) for passenger service operation from Sunday 20/5.

So we needn't expect delays for Swindon etc from them as they can respond within the same week!

Silver linings,

OTC
Logged
ellendune
Transport Scholar
Hero Member
******
Posts: 4452


View Profile
« Reply #221 on: May 26, 2018, 11:05:22 »

So what is happening between Didcot and Chippenham this weekend that they have closed the line for three days?
Logged
Rob on the hill
Hero Member
*****
Posts: 354


View Profile
« Reply #222 on: May 26, 2018, 11:24:20 »

So what is happening between Didcot and Chippenham this weekend that they have closed the line for three days?

https://www.networkrail.co.uk/running-the-railway/our-routes/western/great-western-mainline/wiltshire-swindon/
Logged
DidcotPunter
Sr. Member
****
Posts: 166


View Profile Email
« Reply #223 on: May 26, 2018, 11:40:18 »

So what is happening between Didcot and Chippenham this weekend that they have closed the line for three days?

Network Rail (NR» (Network Rail - home page)) are supposed to be energising the Over-Head Line Equipmnet (OHLE) between Milton Junction (the present limit) and Wantage Road this weekend. There were lots of engineers all over the Over-Head Line Equipment (OHLE) at Challow when I went past on the A417 earlier this morning so they are clearly using the blockade to prepare this section to go live in a few weeks time.

Edit: VickiS - Clarifying Acronyms
« Last Edit: May 21, 2021, 11:32:12 by VickiS » Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4356


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #224 on: May 27, 2018, 08:38:47 »

So what is happening between Didcot and Chippenham this weekend that they have closed the line for three days?

NR» (Network Rail - home page) are supposed to be energising the OLE (Overhead Line Equipment, more often "OHLE") between Milton Junction (the present limit) and Wantage Road this weekend. There were lots of engineers all over the OLE at Challow when I went past on the A417 earlier this morning so they are clearly using the blockade to prepare this section to go live in a few weeks time.


This is so they can commission the Neutral Sections and associated (electrical) protection and control systems at Foxhall ATFS.
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 13 14 [15] 16 17 ... 78
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page