Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 17:55 16 Apr 2024
* Birmingham Airport suspends operations over security incident
* Airport suspends operations over security incident
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
16th Apr (1987)
~ Tulyar arrives at Swanley New Barn Railway (link)

Train RunningCancelled
22:44 Taunton to Bristol Temple Meads
17/04/24 00:45 London Paddington to Reading
Short Run
16:31 Barnstaple to Axminster
17:25 Okehampton to Exeter Central
19:56 Cardiff Central to Taunton
23:24 Didcot Parkway to London Paddington
Delayed
16:13 Exeter Central to Barnstaple
An additional train service has been planned to operate as shown 17:48 Exeter St Davids to Axminster
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 16, 2024, 18:01:35 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[303] Problems with the Night Riviera sleeper - December 2014 onward...
[71] New station at Ashley Down, Bristol
[69] BBC Great Coastal Railway Journeys - A Correction
[69] Proposals for open access services on new routes
[65] Okehampton
[51] First tour train of season
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 15 16 [17] 18 19 ... 78
  Print  
Author Topic: Great Western Main Line electrification - ongoing discussion  (Read 284885 times)
Electric train
Transport Scholar
Hero Member
******
Posts: 4362


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #240 on: June 03, 2018, 19:28:34 »

When will Oxford be electrified?


It is high on the CP6 (Control Period 6 - The five year period between 2019 and 2024) National funding ie its not part of the GW (Great Western) Route funding bid.   part of the reason for its descope in the first place was the redevelopment at Oxford Station had changed from the original GRIP (Guide to Railway Investment Projects) 3 design with of Eastwest rail and Chiltern Marylebone services being introduced; most of the OLE (Overhead Line Equipment, more often "OHLE") structures would have had to be felled and relocates Oxford AT site would have also needed relocating   
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
wabbit
Full Member
***
Posts: 30


View Profile
« Reply #241 on: June 03, 2018, 23:37:00 »

Any idea what the journey times from Swindon to Pad will be once the line is fully electrified?
Logged
TonyK
Global Moderator
Hero Member
*****
Posts: 6438


The artist formerly known as Four Track, Now!


View Profile
« Reply #242 on: June 04, 2018, 10:17:44 »

Oooh - doing a Pilning and making it one direction only??   Or is there another access?

Don't expect that Reading Borough Councillors liked what the NR» (Network Rail - home page) officials said if it came across as a threat - "give us permission or else ....".

It sounded less threat than statement of reality to me. I'm sure Reading council will be able to explain why they didn't see a need for a continued footbridge there, and why its removal won't affect the borough's plans for carbon footprint reduction. Or, my inner conspiracy theorist thinks, they were expecting NR to appeal, to save the council the embarrassment of having to make a decision that could upset somebody. But NR can run the railway without a footbridge, and have better things to spend money on than planning appeals, so...
Logged

Now, please!
onthecushions
Transport Scholar
Hero Member
******
Posts: 977


View Profile
« Reply #243 on: June 14, 2018, 18:33:08 »


I understand that the wires went live to Rushey Platt (SW suburb of Swindon) last Friday night.

78.5 miles done.

OTC
Logged
Western Pathfinder
Global Moderator
Hero Member
*****
Posts: 1531



View Profile
« Reply #244 on: June 15, 2018, 20:15:37 »

Having been in Swindon for the last day or so I can confirm that the OLE (Overhead Line Equipment, more often "OHLE") is humming away to itself quite happily,and I'm told by those in the know that there's a little bit of testing still to do but as soon as that's done it will be used so in operation earlier than expected.
Logged
CJB666
Sr. Member
****
Posts: 210


View Profile
« Reply #245 on: June 16, 2018, 09:08:35 »

Severn Tunnel to shut for electrification work
15 June 2018

https://www.bbc.co.uk/news/uk-wales-south-east-wales-44493847

Rail passengers travelling between south Wales and London face longer journey times for the next three weeks as the Severn Tunnel will be closed.

Main line services between Swansea and London Paddington will take 40 minutes longer as trains will be diverted via Gloucester from Saturday until 6 July.

Great Western Railway said those trains will not call at Bristol Parkway.

The closure is due to a £2.8bn project to electrify the south Wales main line for GWR (Great Western Railway)'s new electric trains.

Commuters between Bristol and south Wales will be forced to take a rail-replacement bus service.

Trains between England's south coast and Wales will start and end at Bristol Parkway, with buses linking to Newport.

On Sunday, there will be no direct trains between south Wales and London with all services starting and terminating at Bristol Parkway.

Replacement coaches will run to Newport for trains to Cardiff and Swansea.

The work will affect passengers going to major events in south Wales such as England's cricket matches in Cardiff as they face Australia on Saturday and India next month.

Fans going to four Ed Sheeran concerts at the Principality Stadium next week may also be affected by the works.

The track inside the four-mile Severn Tunnel is to be renewed, while "further electrification works" are planned. The track will also be lowered in the two Patchway tunnels.

For passengers a bus service will replace trains between Bristol Parkway and Newport and stop at Patchway and Severn Tunnel Junction.

Trains will continue to run as normal between London Paddington and Bristol Temple Meads via Bath, but there will only be one direct service an hour from London to Bristol Parkway.

====
Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4362


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #246 on: June 16, 2018, 09:18:11 »

Having been in Swindon for the last day or so I can confirm that the Over-Head Line Equipment (OHLE) is humming away to itself quite happily,and I'm told by those in the know that there's a little bit of testing still to do but as soon as that's done it will be used so in operation earlier than expected.


Passanger train use of the Over-Head Line Equipment (OHLE) West of Didcot is not planned until September 18.


I have been told by a Project insider that Section Proving has been completed, there are however immunisation, protection and control tests to be done as well as dynamic test to be done by a mesurment train (Mentor) these are done in engineering hours.


Edit: VickiS - Clarifying Acronym
« Last Edit: May 21, 2021, 11:40:23 by VickiS » Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
YouKnowNothing
Full Member
***
Posts: 72


View Profile Email
« Reply #247 on: June 16, 2018, 23:29:43 »


I read an article that stated that this closure is needed to replace rusted assets that were installed in the last large closure in October 2016.

How many more closures are needed?

Severn Tunnel to shut for electrification work
15 June 2018

https://www.bbc.co.uk/news/uk-wales-south-east-wales-44493847

Rail passengers travelling between south Wales and London face longer journey times for the next three weeks as the Severn Tunnel will be closed.

Main line services between Swansea and London Paddington will take 40 minutes longer as trains will be diverted via Gloucester from Saturday until 6 July.

Great Western Railway said those trains will not call at Bristol Parkway.

The closure is due to a £2.8bn project to electrify the south Wales main line for GWR (Great Western Railway)'s new electric trains.

Commuters between Bristol and south Wales will be forced to take a rail-replacement bus service.

Trains between England's south coast and Wales will start and end at Bristol Parkway, with buses linking to Newport.

On Sunday, there will be no direct trains between south Wales and London with all services starting and terminating at Bristol Parkway.

Replacement coaches will run to Newport for trains to Cardiff and Swansea.

The work will affect passengers going to major events in south Wales such as England's cricket matches in Cardiff as they face Australia on Saturday and India next month.

Fans going to four Ed Sheeran concerts at the Principality Stadium next week may also be affected by the works.

The track inside the four-mile Severn Tunnel is to be renewed, while "further electrification works" are planned. The track will also be lowered in the two Patchway tunnels.

For passengers a bus service will replace trains between Bristol Parkway and Newport and stop at Patchway and Severn Tunnel Junction.

Trains will continue to run as normal between London Paddington and Bristol Temple Meads via Bath, but there will only be one direct service an hour from London to Bristol Parkway.

====

Logged
bobm
Administrator
Hero Member
*****
Posts: 9827



View Profile
« Reply #248 on: June 16, 2018, 23:37:26 »

Apparently the original Severn road bridge is closed westbound this weekend too.
Logged
YouKnowNothing
Full Member
***
Posts: 72


View Profile Email
« Reply #249 on: June 17, 2018, 18:10:45 »

Here's the article for those that are interested -

https://www.walesonline.co.uk/news/severn-tunnel-shut-three-weeks-14785503

Does anyone know if it's true?
Logged
broadgage
Transport Scholar
Hero Member
******
Posts: 5407



View Profile
« Reply #250 on: June 17, 2018, 19:15:01 »

I suspect that it is factually correct but rather misleading.

The conductor rail probably HAS corroded and would be better cleaned than not.
A lot of electrification related works DO remain to be done.

However to imply that the closure is primarily to remove rust is probably rather misleading.

Logged

A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard.
It has space for cycles, surfboards,luggage etc.
A 5 car DMU (Diesel Multiple Unit) is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
Electric train
Transport Scholar
Hero Member
******
Posts: 4362


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #251 on: June 17, 2018, 22:34:57 »

I suspect that it is factually correct but rather misleading.

The conductor rail probably HAS corroded and would be better cleaned than not.
A lot of electrification related works DO remain to be done.

However to imply that the closure is primarily to remove rust is probably rather misleading.




The local maintainer of the tunnel did advise the project that very little survives in the tunnel for very long, they have even had stainless steel corrode over the years.

It is an extremely harsh environment 
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
ChrisB
Transport Scholar
Hero Member
******
Posts: 12355


View Profile Email
« Reply #252 on: June 18, 2018, 13:15:12 »

Here's the article for those that are interested -

https://www.walesonline.co.uk/news/severn-tunnel-shut-three-weeks-14785503

Does anyone know if it's true?

Absolute tosh I'm afraid. Ever seen *aluminium* rust?
Logged
broadgage
Transport Scholar
Hero Member
******
Posts: 5407



View Profile
« Reply #253 on: June 18, 2018, 13:38:12 »

"rust" is generally accepted to a type of corrosion that only attacks ferrous metals.
Aluminium CAN corrode, though not rust.
It is asking a bit much to expect a journalist to know the difference between rust and corrosion.
Logged

A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard.
It has space for cycles, surfboards,luggage etc.
A 5 car DMU (Diesel Multiple Unit) is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
bradshaw
Transport Scholar
Hero Member
******
Posts: 1454



View Profile
« Reply #254 on: June 18, 2018, 13:38:35 »

Aluminium is a reactive metal and does ‘rust’ but by forming a layer of aluminium oxide over the surface. Unlike iron, this seals the surface from further oxidation. It is seen as a dull white layer over the metal.
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 15 16 [17] 18 19 ... 78
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page