Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 18:35 24 Apr 2024
- Further delays to repairs on main Arran ferry
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

No 'On This Day' events reported for 24th Apr

Train RunningCancelled
16:59 Gatwick Airport to Reading
Short Run
15:28 Weymouth to Gloucester
17:30 Warminster to Bristol Temple Meads
Delayed
An additional train service has been planned to operate as shown 18:10 Bristol Temple Meads to Gloucester
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 24, 2024, 18:36:13 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[133] Lack of rolling stock due to attacks on shipping in the Red Se...
[72] Where have I been?
[70] 2024 - Service update and amendment log, Swindon <-> Westbury...
[66] Theft from Severn Valley Railway
[59] Death of another bus station?
[53] Penalty fares on Severn Beach Line
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: [1]
  Print  
Author Topic: Big Ben Refurbishment Costs Double  (Read 3977 times)
John R
Hero Member
*****
Posts: 4416


View Profile
« on: September 29, 2017, 17:57:43 »

http://www.bbc.co.uk/news/uk-politics-41444415

Repair costs for the Elizabeth Tower in the Palace of Westminster have now doubled to an estimated £61m, parliamentary authorities have said.
The project is more complex and extensive than originally thought, when the estimate of £29m to £45m was made.
While there were "unique challenges" in work on a historic site, Parliament said it was disappointed at the rising bill and would launch a review.


Maybe the government will now "pause" the project, and will subsequently sign off a rescoped project, with only two faces restored to use, and the chimes replaced by innovative technology (i.e. a loudspeaker playing a recording).
Logged
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #1 on: September 29, 2017, 20:46:36 »

Got their GRIP (Guide to Railway Investment Projects) 4 cost estimates a little bit wrong then...... Roll Eyes Tongue

http://www.bbc.co.uk/news/uk-politics-41444415

Quote
Repair costs for the Elizabeth Tower in the Palace of Westminster have now doubled to an estimated £61m, parliamentary authorities have said.

The project is more complex and extensive than originally thought, when the estimate of £29m to £45m was made.
While there were "unique challenges" in working on a historic site, Parliament said it was disappointed at the rising bill and would launch a review.

Big Ben chimed for the last time in August pending the work beginning.

The rising cost was announced as Parliament confirmed it had appointed construction firm Robert McAlpine to carry out the renovation, which could take up to four years, following a tendering process.

The authorities said the revised figure followed more detailed and technical assessment of the 160-year-old Tower's condition, including the state of stonework and the cost of removing and repainting the metal in the tower and reglazing the clock face.

Big Ben will chime only on New Year's Eve and other special occasions.

More extensive ground works will be required in the Palace of Westminster, due to the quantity of pipes and other utility-related infrastructure under the surface, to support the scaffolding required.

While the estimated cost of the work has risen from £29m to £44m, the level of contingency funding to be put aside in case of "unexpected events" has gone up from £5.8m to £17.2m.

The authorities also said they had transferred the cost of fire safety work, due to be carried out as part of another project and already budgeted for, to the restoration of the tower.

They said they had "expressed their disappointment in the cost increases, and the unreliability of the original estimate" and "instructed officials to provide regular updates on progress".

"In advance of tendering contracts, the initial high level estimates were set at a lower level to avoid cost escalation from the market," they said in a statement.

"Subsequent estimates, using better data and more extensive surveys, better reflect the true likelihood of the costs. We believe that we now have a more accurate estimate of the cost of the works and will report regularly to the committees on the progress of work."

The news that Big Ben would not sound again before 2021, except for special occasions such as New Year and Remembrance Sunday, prompted criticism from Theresa May and other MPs (Member of Parliament).

The House of Commons said it would look again at the duration of the project and the scope for hearing the bell's famous bongs more often.
Logged
broadgage
Transport Scholar
Hero Member
******
Posts: 5410



View Profile
« Reply #2 on: September 30, 2017, 14:20:19 »

Perhaps the project managers could get a job with network rail.
Logged

A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard.
It has space for cycles, surfboards,luggage etc.
A 5 car DMU (Diesel Multiple Unit) is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
Electric train
Transport Scholar
Hero Member
******
Posts: 4362


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #3 on: October 01, 2017, 08:02:48 »

Perhaps the project managers could get a job with network rail.

The Big Ben PM's ultimately work for the same client as the NR» (Network Rail - home page) PM's ..................... and the client the same lot who are making a hash or running the country  Grin a client that never gets past GRIP (Guide to Railway Investment Projects) 1 and see GRIP 8 as a mystical beast
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
TaplowGreen
Transport Scholar
Hero Member
******
Posts: 7798



View Profile
« Reply #4 on: October 01, 2017, 10:03:12 »

Perhaps the project managers could get a job with network rail.

They probably used to work for Network Rail looking at those figures - remember that the standard public sector technique for dealing with under performance is to move those concerned onto another job!  Roll Eyes
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page