Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 06:55 20 Apr 2024
- Some Wales roads to revert to 30mph after backlash
- BBC presenter reports racist abuse on London train
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
20th Apr (1789)
Opening of Sapperton Canal Tunnel

Train RunningCancelled
05:15 Plymouth to Penzance
06:38 Weymouth to Gloucester
07:40 Penzance to Plymouth
08:15 Penzance to London Paddington
18:52 London Paddington to Great Malvern
19:19 Carmarthen to Swansea
Short Run
06:30 Cardiff Central to Portsmouth Harbour
06:50 Frome to Filton Abbey Wood
07:22 Exeter St Davids to Penzance
14:48 London Paddington to Carmarthen
21:07 Gloucester to Bristol Temple Meads
Delayed
05:25 Swansea to London Paddington
05:30 Bristol Temple Meads to London Paddington
06:28 Bristol Parkway to Weston-Super-Mare
06:30 Bristol Temple Meads to London Paddington
06:34 Great Malvern to Bristol Temple Meads
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 20, 2024, 07:04:50 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[276] Somerset and Dorset Devonshire Tunnel flood
[265] Rail to refuge / Travel to refuge
[45] Rail delay compensation payments hit £100 million
[40] Problems with the Night Riviera sleeper - December 2014 onward...
[19] Difficult to argue with e-bike/scooter rules?
[18] Signage - not making it easy ...
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: [1]
  Print  
Author Topic: THAMESLINK - Delay to enhanced timetable  (Read 2771 times)
martyjon
Transport Scholar
Hero Member
******
Posts: 1941


View Profile
« on: November 23, 2017, 06:55:38 »

Heard on Radio 4 Today programme this am that enhanced services on Thameslink have been delayed by a year as the operator wants to introduce the enhanced service in stages.
Logged
TaplowGreen
Transport Scholar
Hero Member
******
Posts: 7794



View Profile
« Reply #1 on: November 23, 2017, 07:15:37 »

It's already nearly 20 years late, one more won't make much difference.
Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 12357


View Profile Email
« Reply #2 on: November 23, 2017, 08:36:55 »

Not all, just some (from the Southern railways area mainly, like East Grinstead to Cambridge.
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5318


View Profile
« Reply #3 on: November 23, 2017, 12:34:23 »

Not all, just some (from the Southern railways area mainly, like East Grinstead to Cambridge.

The change is to lengthen the ramp up period from one year to two years, since announcements of a transition period a couple of years ago the 24 tph was only achieved gradually over the course of 2018.   Now it will be over a two year period.   They had already intended to have future Thameslink services running short into London Bridge, Blackfriars or Kings Cross.

No doubt it will be reported on in some areas as a kind of disaster, but it could also be seen as sensible to have a gradual approach while they get to grips with the core area ATO (Automatic Train Operation) and the changeover areas, and the wider area subject to Thameslink traffic management.

Suggestions elsewhere that the delay is about the only positive response to all those timetabling proposals in the "Gibb Report", most of which have been ignored as far as I can see...

Paul
Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4362


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #4 on: November 23, 2017, 18:58:15 »

There are also some concerns over some of the existing infrastructure outside the Thamelink work bank needing work to ensure it is resilient .............. read as stuff that was de-scoped by DfT» (Department for Transport - about) also some renewals work that should have been done over the last few years has been "deferred" so as not hamper the Thamelink possessions and blockades.

The intended 20 trains per hour is still going to be impressive, with new destination added to the through London map, Cambridge, Peterborough and add to that the awesome rebuild of London Bridge ............. if you have not visited the London Bridge you should do even not fully open it is amazing compared to what was there
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
IndustryInsider
Data Manager
Hero Member
******
Posts: 10116


View Profile
« Reply #5 on: November 23, 2017, 20:21:49 »

I've purposely avoided going to London Bridge for several years so I can fully appreciate the scale of the works there when finished.  Sounds like a station rebuilt to cope with increasing passenger numbers for many years to come - just like the hugely impressive rebuild at Reading.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
Electric train
Transport Scholar
Hero Member
******
Posts: 4362


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #6 on: November 24, 2017, 20:32:39 »

I've purposely avoided going to London Bridge for several years so I can fully appreciate the scale of the works there when finished.  Sounds like a station rebuilt to cope with increasing passenger numbers for many years to come - just like the hugely impressive rebuild at Reading.

The Reading rebuild is small in comparison to that of London Bridge especially when BDU (Bermondsey Dive Under) Borough viaduct and all the relaying of the junctions South and North of London Bridge 

Although Reading is impressive compared to what it was
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page