Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 18:55 19 Apr 2024
* Some Welsh roads to revert to 30mph after backlash
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
19th Apr (1938)
Foundation, Beatties of London (link)

Train RunningCancelled
19:02 London Paddington to Bristol Temple Meads
19:18 London Paddington to Swansea
19:23 London Paddington to Oxford
21:02 Oxford to London Paddington
Short Run
15:50 Penzance to Gloucester
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 19, 2024, 19:10:51 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[333] Rail to refuge / Travel to refuge
[69] Rail delay compensation payments hit £100 million
[53] Somerset and Dorset Devonshire Tunnel flood
[30] Difficult to argue with e-bike/scooter rules?
[28] Signage - not making it easy ...
[6] IETs at Melksham
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: [1]
  Print  
Author Topic: Investigation into the DFT and the decision to cancel rail electrification.  (Read 2682 times)
Western Pathfinder
Global Moderator
Hero Member
*****
Posts: 1531



View Profile
« on: March 29, 2018, 13:40:04 »

Came across this released this morning
https://www.nao.org.uk/report/investigation-into-the-department-for-transports-decision-to-cancel-three-rail-electrification-projects/?platform=hootsuite.
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7163


View Profile
« Reply #1 on: March 29, 2018, 14:18:54 »

It's worth noting that the report reaches no conclusion at all - it doesn't aim to, it's just documenting what happened. The most interesting paragraph (for readers here) is I think 4.6, about "Delivering benefits without electrification: Cardiff to Swansea":
Quote
4.6  The main passenger benefits of electrifying the Great Western route were to increase passenger capacity and to improve passenger experience. The Department had already ordered new bi-mode trains to run on the route before the decision to cancel. The train specification includes 24% more seats than the trains they replace. The Department expects to achieve the majority of journey time benefits through running the bi-mode trains in electric mode between London and Cardiff, where the trains can run at 125 miles per hour where line speed allows. The maximum speed a train (diesel or electric) can run between Cardiff and Swansea is 90 miles per hour so the full benefits of running fast electric trains would not have been possible even with electrification. Hitachi, the train manufacturer, estimates that electrification will reduce journey times between London and Swansea by 15 minutes once electrification to Cardiff is completed in 2019. The Department’s appraisal of the project in April 2017 assumed that journey times between Cardiff and Swansea will be 3.5 minutes longer with bi-mode trains operating in diesel rather than electric mode. However, at the Department’s request, the manufacturer has agreed to modify the bi-mode trains to enable them to operate at faster speeds in diesel mode. The Department currently expects that once electrification to Cardiff has been completed, the trains will be able to achieve the same journey times in diesel mode between Cardiff and Swansea as they would have in electric mode.
Logged
bradshaw
Transport Scholar
Hero Member
******
Posts: 1455



View Profile
« Reply #2 on: March 29, 2018, 16:51:54 »

The Audit Office might not have gone that far but they did leave some hints and this Tweet from Lilian Greenwood of the Transport Select Committee goes somewhat further

Grayling decided to cancel MML» (Midland Main Line. - about) electrification before the GE2017 but didn’t tell us; doesn’t know the environmental or financial costs; & promised same benefits from bi-mode trains - even though he knows they don’t exist. East Midlands passengers are entitled to feel very angry

It might be worth reading the 28 page NAO report as it is pretty damning.

Also today Bombardier announced that they have developed a 125mph biome based on their Adventra
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page