Train Graphic
Great Western Passengers' Forum
GWR advice (Project Phoenix)
Forum in and beyond Coronavirus
Great Western Coffee Shop
[home] and [about]
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 18/08/20 - Tuesday Club - ONLINE
24/08/20 - Challenge of Decarb. - ONLINE
16/09/20 - Melksham Rail User Group
17/09/20 - National Rail Awards
Random Image
Train Running Polls Acronyms/Abbreviations Station Comparator Rail news GWR co. site Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
August 14, 2020, 11:33:38 pm *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most liked recent subjects
[100] Finn and bignosemac's return to the rails. Where were we today...
[70] HST derailment, near Stonehaven, 12th August 2020
[54] 2020 - TransWilts cancellation and amendment log
[53] Air fares in the time of pandemic
[44] And you thought some UK liverys where bad
[32] More local ferry operator news
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 4 5 [6] 7
  Print  
Author Topic: Trimode cl 769 to operate Reading to Oxford and Gatwick.  (Read 25464 times)
Electric train
Hero Member
*****
Posts: 3300


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #75 on: February 14, 2020, 06:28:15 pm »

They should be fine on AC - though with limited opportunities to use it.  There is a massive scarcity of pure diesel trains (other than new orders, which isnít really an option for any franchises under a short-term direct award), so itís as much about capacity as anything else.

Though it will be a great shame if they canít use DC, even if not immediately.

Depends on the traction pack and the levels of signal immunisation, just needs to acceptance to be carried out, but the TOC has to pay to have this done and the NoBo
Logged

Neither a wise man nor a brave man lies down on the tracks of history to wait for the train of the future to run over him.     
Dwight D. Eisenhower
stuving
Transport Scholar
Hero Member
******
Posts: 4902


View Profile
« Reply #76 on: February 14, 2020, 07:16:48 pm »

They should be fine on AC - though with limited opportunities to use it.  There is a massive scarcity of pure diesel trains (other than new orders, which isnít really an option for any franchises under a short-term direct award), so itís as much about capacity as anything else.

Though it will be a great shame if they canít use DC, even if not immediately.

Depends on the traction pack and the levels of signal immunisation, just needs to acceptance to be carried out, but the TOC has to pay to have this done and the NoBo

I presume that's a reference to proving on additional routes, after the "new" train has been approved (with all that paperwork) and tested somewhere at Porterbrook's cost. I found this in a Rail Engineer article (which isn't responding now) - from a visit/interview mainly with Helen Simpson (engineering innovation and development manager of Porterbrook):
Quote
Approvals

Helen talked about the compliance and approval process. The modification is not considered an upgrade or renewal and does not require authorisation under the common safety method for risk evaluation and assessment, although this process has been voluntarily applied as a robust means of managing safety. SNC-Lavalin is providing integrated Notified Body, Designated Body and Assessment Body services.

Full details of this process would justify its own article, and Helen described some of the challenges applying the approval process mandated by the Technical Standards for Interoperability (TSI) regulations on a 30-year-old train. For example, TSI noise requirements do not apply, but pass-by noise will be compared to other DMUs operating the same services on the route; in the case of the Northern trains, this means comparing with the Class 15X units. Porterbrook needs to show it is no worse, but is actually aiming for it to be a demonstrable improvement. This, and other type approval testing, was expected to be carried out at the nearby Great Central Railway.

Of course they may have discovered Hofstadter's law applies to NR's approvals requirements.

The plan was to not change the traction at all, just feed it from an on-board generator-alternator-converter. Rather oddly, the shoe gear would be put somewhere new (and perhaps be new itself?). But something must have delayed the programme - by what, a year and a bit? - and that might include some rethinking of that plan, though I've not seen any mention of it.
Logged
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #77 on: February 14, 2020, 09:50:45 pm »

According to info posted elsewhere there are going to be 19 class 769s and a naming list has been drawn up based on mythical characters. Roll Eyes
Logged
eightf48544
Transport Scholar
Hero Member
******
Posts: 4421


View Profile Email
« Reply #78 on: February 15, 2020, 10:02:38 am »

According to info posted elsewhere there are going to be 19 class 769s and a naming list has been drawn up based on mythical characters. Roll Eyes

Very appropriate.
Logged
grahame
Administrator
Hero Member
*****
Posts: 30245



View Profile WWW Email
« Reply #79 on: February 15, 2020, 10:52:42 am »

According to info posted elsewhere there are going to be 19 class 769s and a naming list has been drawn up based on mythical characters. Roll Eyes

Very appropriate.

Quite a few have been used before ... https://www.sparknotes.com/lit/mythology/characters/ may give some ideas.

I was wondering how serious the original suggestion was.
Logged

Coffee Shop Admin, Vice Chair of Melksham Rail User Group, and on the board of TravelWatch SouthWest.
Electric train
Hero Member
*****
Posts: 3300


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #80 on: February 16, 2020, 12:01:23 pm »

They should be fine on AC - though with limited opportunities to use it.  There is a massive scarcity of pure diesel trains (other than new orders, which isnít really an option for any franchises under a short-term direct award), so itís as much about capacity as anything else.

Though it will be a great shame if they canít use DC, even if not immediately.

Depends on the traction pack and the levels of signal immunisation, just needs to acceptance to be carried out, but the TOC has to pay to have this done and the NoBo

I presume that's a reference to proving on additional routes, after the "new" train has been approved (with all that paperwork) and tested somewhere at Porterbrook's cost. I found this in a Rail Engineer article (which isn't responding now) - from a visit/interview mainly with Helen Simpson (engineering innovation and development manager of Porterbrook):
Quote
Approvals

Helen talked about the compliance and approval process. The modification is not considered an upgrade or renewal and does not require authorisation under the common safety method for risk evaluation and assessment, although this process has been voluntarily applied as a robust means of managing safety. SNC-Lavalin is providing integrated Notified Body, Designated Body and Assessment Body services.

Full details of this process would justify its own article, and Helen described some of the challenges applying the approval process mandated by the Technical Standards for Interoperability (TSI) regulations on a 30-year-old train. For example, TSI noise requirements do not apply, but pass-by noise will be compared to other DMUs operating the same services on the route; in the case of the Northern trains, this means comparing with the Class 15X units. Porterbrook needs to show it is no worse, but is actually aiming for it to be a demonstrable improvement. This, and other type approval testing, was expected to be carried out at the nearby Great Central Railway.

Of course they may have discovered Hofstadter's law applies to NR's approvals requirements.

The plan was to not change the traction at all, just feed it from an on-board generator-alternator-converter. Rather oddly, the shoe gear would be put somewhere new (and perhaps be new itself?). But something must have delayed the programme - by what, a year and a bit? - and that might include some rethinking of that plan, though I've not seen any mention of it.

The 319's did not necessary have universal route clearance, the were never cleared for instance to operate through Canal Tunnels (the new Thameslink between the ECML and St Pancras) Rolling stock does not always have route clearance under "grandfather rights" on new (to it) routes
Logged

Neither a wise man nor a brave man lies down on the tracks of history to wait for the train of the future to run over him.     
Dwight D. Eisenhower
eightonedee
Transport Scholar
Hero Member
******
Posts: 765



View Profile
« Reply #81 on: April 26, 2020, 07:08:08 pm »

Quote
Quote from: eightonedee on Today at 04:40:08 pm
Quote
A quick look at the North Downs Line timetable suggests to me that there are 10 daily diagrams or so on that line; not sure how many are pairs of units, though.

The short answer "none" I think. The 769s would (when they eventually arrive!) be useful for Reading-Oxford services as a  replacement for the Turbos used there. I think that there are currently some two unit services on this service - one I used to catch, albeit with one locked out of use to avoid people falling out at Appleford.

No plans to use 769s west of Reading.  Virtually all will be confined to North Downs duties, which will release the 16 Turbos for cascade west.

II's reply sums up the sorry saga that has unfolded as set out in this thread. OK, they will probably not arrive as last promised this month due to Covid 19. But when they do, we will have tri-mode trains that will not be able to run on electric for most of the electrified part of the North Downs route, and from what our learned friend Stuving has told us may have traction problems on a route that is relatively steeply graded in parts in adverse rail head conditions. However, the OHL equipment will remain largely (entirely?) unused, while diesels still ply the part electrified route between Reading and Oxford.

Is that really a satisfactory outcome?   
Logged
eightonedee
Transport Scholar
Hero Member
******
Posts: 765



View Profile
« Reply #82 on: June 17, 2020, 07:16:56 pm »

Quote
Meanwhile from the Sheffield Star

Quote
Fury over plans to axe 450 workers at Doncaster rail factory
Plans to axe up to 450 jobs at a Doncaster rail maintenance factory have been blasted by a union which claimed they had been Ďsmuggled out under the cloak of the Covid-19 crisisí.

and

Quote
Odd that ... Wabtec have a queue of work and are laying off lots of staff ...

Appropriate prompts - what's the latest on the delivery of the 769s?
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 8263


View Profile
« Reply #83 on: June 17, 2020, 08:08:15 pm »

GWRís first is expected to arrive next month AIUI.
Logged

To view my GWML Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
grahame
Administrator
Hero Member
*****
Posts: 30245



View Profile WWW Email
« Reply #84 on: June 17, 2020, 08:26:00 pm »

Appropriate prompts - what's the latest on the delivery of the 769s?

GWRís first is expected to arrive next month AIUI.

I wondered if I had missed "first revenue earning service" anywhere, but I don't think so:

Northern - Driver training started (or was planned to start) February 2020
Transport for Wales - entering service "some time in 2020".  Understand testing from mid March
Great Western - noting arrival date above (thank you II) - Wikipedia says "eventually"
Rail Operations Group - in service in 2020.
Logged

Coffee Shop Admin, Vice Chair of Melksham Rail User Group, and on the board of TravelWatch SouthWest.
IndustryInsider
Data Manager
Hero Member
******
Posts: 8263


View Profile
« Reply #85 on: June 17, 2020, 09:47:04 pm »

I suspect itíll be a fair while yet before any enter service on GWR.
Logged

To view my GWML Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
grahame
Administrator
Hero Member
*****
Posts: 30245



View Profile WWW Email
« Reply #86 on: July 29, 2020, 05:05:22 pm »

GWRís first is expected to arrive next month AIUI.

Tomorrow - 30th July.
10:27 from Loughborough, onto GWR territory at Banbury at 14:14, Reading Traincare Depot 15:24.
(( https://www.realtimetrains.co.uk/train/K05794/2020-07-30/detailed ))

The training ... when will it carry passengers?

Logged

Coffee Shop Admin, Vice Chair of Melksham Rail User Group, and on the board of TravelWatch SouthWest.
IndustryInsider
Data Manager
Hero Member
******
Posts: 8263


View Profile
« Reply #87 on: July 30, 2020, 10:55:54 am »

Delivery cancelled until the second week of August according to a poster on Railforums

The training ... when will it carry passengers?

It'll no doubt be a while as there is still a ban (emergencies excepted) on more than one person in a cab at a time, although a trial solution to that issue is in the pipeline.
Logged

To view my GWML Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
TonyN
Transport Scholar
Full Member
******
Posts: 58


View Profile
« Reply #88 on: August 08, 2020, 01:04:01 pm »

A 769 unit was moved South through Banbury yesterday by 50007 and 50049.

This is reported to be 769943 on its way to Reading as 5Z69 but I have not found it on Realtime trains.

Picture here on Facebook
https://www.facebook.com/photo.php?fbid=3356919184365881&set=gm.3159948040762940&type=3&theater&ifg=1
Logged
grahame
Administrator
Hero Member
*****
Posts: 30245



View Profile WWW Email
« Reply #89 on: August 08, 2020, 01:14:43 pm »


This is reported to be 769943 on its way to Reading as 5Z69 but I have not found it on Realtime trains.


https://www.realtimetrains.co.uk/train/44324/2020-08-07/detailed
Logged

Coffee Shop Admin, Vice Chair of Melksham Rail User Group, and on the board of TravelWatch SouthWest.
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 4 5 [6] 7
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by a customer of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page