Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 14:35 29 Mar 2024
* Delays at Dover as millions begin Easter getaway
- Attempted murder charge after man stabbed on train
* A view from inside ship that hit Baltimore bridge
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
29th Mar (1913)
Foundation of National Union or Railwaymen (*)

Train RunningCancelled
12:30 London Paddington to Weston-Super-Mare
13:15 London Paddington to Cardiff Central
14:12 Newbury to Bedwyn
14:19 Westbury to Swindon
14:57 Bedwyn to Newbury
15:14 Swindon to Westbury
15:22 Newbury to Bedwyn
15:28 Weston-Super-Mare to London Paddington
15:50 Bedwyn to Newbury
15:54 Cardiff Central to London Paddington
16:15 Newbury to Bedwyn
16:23 Westbury to Swindon
16:55 Bedwyn to Newbury
17:36 Swindon to Westbury
18:37 Westbury to Swindon
20:13 Swindon to Westbury
21:16 Westbury to Swindon
22:30 Swindon to Westbury
Short Run
10:55 Paignton to London Paddington
12:35 London Paddington to Exeter St Davids
13:10 Gloucester to Weymouth
13:42 Exeter St Davids to London Paddington
13:46 Bristol Temple Meads to Warminster
13:55 Paignton to London Paddington
14:36 London Paddington to Paignton
15:42 Exeter St Davids to London Paddington
16:35 London Paddington to Plymouth
16:50 Plymouth to London Paddington
17:03 London Paddington to Penzance
17:36 London Paddington to Plymouth
18:03 London Paddington to Penzance
18:36 London Paddington to Plymouth
19:04 Paignton to London Paddington
20:03 London Paddington to Plymouth
21:04 London Paddington to Plymouth
Delayed
09:10 Penzance to London Paddington
10:04 London Paddington to Penzance
10:20 Penzance to London Paddington
11:03 London Paddington to Plymouth
12:03 London Paddington to Penzance
12:15 Penzance to London Paddington
13:03 London Paddington to Plymouth
13:15 Plymouth to London Paddington
13:50 London Paddington to Great Malvern
14:03 London Paddington to Penzance
14:15 Penzance to London Paddington
15:03 London Paddington to Penzance
15:15 Plymouth to London Paddington
16:03 London Paddington to Penzance
16:15 Penzance to London Paddington
19:04 London Paddington to Penzance
etc
PollsOpen and recent polls
Closed 2024-03-25 Easter Escape - to where?
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
March 29, 2024, 14:42:25 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[135] 2024 - Service update and amendment log, Swindon <-> Westbury...
[85] Infrastructure problems in Thames Valley causing disruption el...
[46] Travel for free on the m2 metrobus - Bristol - 4,5,6 April 202...
[36] would you like your own LIVE train station departure board?
[34] West Wiltshire Bus Changes April 2024
[33] Reversing Beeching - bring heritage and freight lines into the...
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: [1] 2
  Print  
Author Topic: Waterloo closed by engineering over run  (Read 3278 times)
rogerw
Global Moderator
Hero Member
*****
Posts: 1336



View Profile
« on: November 19, 2018, 07:50:13 »

https://www.bbc.co.uk/news/uk-england-46258720

At least Filton bank opened on time
Logged

I like to travel.  It lets me feel I'm getting somewhere.
Timmer
Global Moderator
Hero Member
*****
Posts: 6293


View Profile
« Reply #1 on: November 19, 2018, 08:51:16 »

Another day of shockingly poor service for SWR» (South Western Railway - about)’s customers.
Logged
JayMac
Moderator
Hero Member
*****
Posts: 18897



View Profile
« Reply #2 on: November 19, 2018, 09:02:28 »

Whilst blame doesn't lie with SWR» (South Western Railway - about), they have to handle the fallout. And it looks like they're not doing a very good job communicating.

Sadly it appears to be another example of FirstGroup's Maxwell touch. Thats the polar opposite of the Midas touch. Named after Robert Maxwell - everything he touched turning to s***.
Logged

"Build a man a fire and he'll be warm for the rest of the day. Set a man on fire and he'll be warm for the rest of his life."

- Sir Terry Pratchett.
stuving
Transport Scholar
Hero Member
******
Posts: 7156


View Profile
« Reply #3 on: November 19, 2018, 10:28:20 »

As of 10:16:
Quote
All lines have reopened between Surbiton and London Waterloo as the overrunning engineering work has now been completed. As trains and train crew are in the wrong locations for their next duty, services will remain severely disrupted for the rest of today.

Despite the way the news has been presented, most Windsor Lines services were running, though with a few gaps due to missing stock. Reading trains were worse than that, most delayed and some missing, but that was our old friend "signalling at Earley" having a bit of a strop.

And then, a little to the east:
Quote
Trains across the whole Southern and Thameslink network may be delayed, cancelled or revised this morning, this is due to earlier overrunning engineering work at various locations.
...
Following planned weekend engineering works over running, all lines have re-opened in the London Victoria area.

Additionally, a freight train is currently blocking the line in the Haydons Road area. This train was supposed to cross over onto the Wessex route earlier this morning but has been unable to due to overunning engineering works in the Surbiton area. Due to no alternative routes being available for the train to take the southbound line is currently blocked. Attempts are being made to move the train off the route as the engineering works have concluded, however as this took place a Track Circuit failed at Wimbledon and is now requiring further attention from Network Rail specialist signalling technicians.
Logged
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #4 on: November 19, 2018, 11:10:08 »

I was never called a 'SPECIALIST' signal technician in my time in the S&T (Signalling and Telegraph).  Can't repeat here what I was called at times, though...... Roll Eyes
Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 12334


View Profile Email
« Reply #5 on: November 19, 2018, 11:22:31 »

Whilst blame doesn't lie with SWR» (South Western Railway - about), they have to handle the fallout. And it looks like they're not doing a very good job communicating.

Correspondents here too.....The subject line is incorrect, as noted by posts above.
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7156


View Profile
« Reply #6 on: November 19, 2018, 11:38:57 »

I was never called a 'SPECIALIST' signal technician in my time in the S&T (Signalling and Telegraph).  Can't repeat here what I was called at times, though...... Roll Eyes

It's odd, isn't it? I guess they say that to make it sound as if these are a superior kind of technician, not the ordinary ones who know very little. But if it means anything in this kind of highly technical field, it means someone who has only been trained on a limited range of equipment, and can't be sent out to fix any fault anywhere. In other words, the equivalent of semi-skilled (but when did you last hear that used?) - after all the French equivalent of that is ouvrier specialisé (which you don't hear much these days either).
« Last Edit: November 19, 2018, 12:21:04 by stuving » Logged
JayMac
Moderator
Hero Member
*****
Posts: 18897



View Profile
« Reply #7 on: November 19, 2018, 12:12:45 »

Correspondents here too.....The subject line is incorrect, as noted by posts above.

Do you mean the thread title? What's incorrect about it?
Logged

"Build a man a fire and he'll be warm for the rest of the day. Set a man on fire and he'll be warm for the rest of his life."

- Sir Terry Pratchett.
ChrisB
Transport Scholar
Hero Member
******
Posts: 12334


View Profile Email
« Reply #8 on: November 19, 2018, 12:18:30 »

Waterloo was severely disrupted, not 'closed'
Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4356


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #9 on: November 19, 2018, 18:32:37 »

Simple sequence of events ……….. as I understand it.

  • Defective rail need to be replaced, just routine work that had been planned in.
    Defective rails had been removed.
    RRV (Road Rail Vehicle) runs through a set of points in the wrong direction thus damaging the points, something that should not happen but sadly does.
    Whole team stood down for 3 hours for a safety brief /investigation
    Re-rail team informs NR» (Network Rail - home page) that they will not complete intime
    At this time SWR» (South Western Railway - about) Shunters had gone off shift, mainline drives do not have route knowledge for depots.
Melt down!!!!



Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
Oxonhutch
Transport Scholar
Hero Member
******
Posts: 1244



View Profile
« Reply #10 on: November 19, 2018, 21:00:28 »

Point 4 appears to be the major problem - was that really necessary? Then Point 6 - what happened to the real [multi-tasking] railway workers?
Logged
JayMac
Moderator
Hero Member
*****
Posts: 18897



View Profile
« Reply #11 on: November 19, 2018, 21:08:49 »

Simple sequence of events ……….. as I understand it.

  • Defective rail need to be replaced, just routine work that had been planned in.
    Defective rails had been removed.
    RRV (Road Rail Vehicle) runs through a set of points in the wrong direction thus damaging the points, something that should not happen but sadly does.
    Whole team stood down for 3 hours for a safety brief /investigation
    Re-rail team informs NR» (Network Rail - home page) that they will not complete intime
    At this time SWR» (South Western Railway - about) Shunters had gone off shift, mainline drives do not have route knowledge for depots.
Melt down!!!!

What was the issue with NR staff unwilling to tamp that I've heard of elsewhere?
Logged

"Build a man a fire and he'll be warm for the rest of the day. Set a man on fire and he'll be warm for the rest of his life."

- Sir Terry Pratchett.
bradshaw
Transport Scholar
Hero Member
******
Posts: 1450



View Profile
« Reply #12 on: November 19, 2018, 22:12:41 »

Christian Wolmar on Twitter earlier today.

“Chaos at Waterloo today was caused by works to replace long sections of track which then proved to be faulty on testing and had to be relaid, along with tamper problems.”
Logged
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #13 on: November 19, 2018, 22:30:11 »

I trust he means rails, not track.  If the track had to be replaced it would have been very drastic and certainly taken more than a week..... Roll Eyes
Logged
TaplowGreen
Transport Scholar
Hero Member
******
Posts: 7750



View Profile
« Reply #14 on: November 20, 2018, 06:08:27 »

I trust he means rails, not track.  If the track had to be replaced it would have been very drastic and certainly taken more than a week..... Roll Eyes

 Wink

Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1] 2
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page