Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 19:15 28 Mar 2024
* Easter getaways hit by travel disruption
- How do I renew my UK passport and what is the 10-year rule?
- Passengers pleaded with knifeman during attack
- Family anger at sentence on fatal crash driver, 19
- Easter travel warning as millions set to hit roads
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
28th Mar (1988)
Formal end to carrying coffins by BR (link)

Train RunningCancelled
17:48 Reading to Gatwick Airport
17:54 Cardiff Central to London Paddington
17:57 London Paddington to Worcester Foregate Street
18:03 London Paddington to Penzance
18:08 London Paddington to Frome
Additional 18:25 Shalford to Reading
18:36 London Paddington to Plymouth
18:37 Westbury to Swindon
18:51 Filton Abbey Wood to Bristol Temple Meads
18:55 Bedwyn to Newbury
19:23 Reading to Gatwick Airport
19:24 Newbury to Bedwyn
19:33 London Paddington to Worcester Shrub Hill
19:55 Bedwyn to Newbury
20:13 Swindon to Westbury
20:16 Frome to Westbury
20:49 Newbury to Bedwyn
20:56 Worcester Foregate Street to London Paddington
21:16 Bedwyn to Newbury
21:53 Newbury to Bedwyn
22:25 Bedwyn to Newbury
22:47 Newbury to Bedwyn
Short Run
15:03 London Paddington to Penzance
16:19 Carmarthen to London Paddington
16:23 Portsmouth Harbour to Cardiff Central
16:35 London Paddington to Plymouth
16:50 Plymouth to London Paddington
17:03 London Paddington to Penzance
17:30 London Paddington to Taunton
17:36 London Paddington to Plymouth
17:50 Gloucester to Salisbury
17:59 Gatwick Airport to Reading
18:18 Newbury to London Paddington
18:19 Reading to Gatwick Airport
18:29 Gatwick Airport to Reading
18:54 Reading to Gatwick Airport
18:59 Gatwick Airport to Reading
19:04 Paignton to London Paddington
19:06 London Paddington to Bedwyn
19:29 Gatwick Airport to Reading
20:03 London Paddington to Plymouth
20:42 Bedwyn to London Paddington
Delayed
13:59 Cardiff Central to Penzance
14:15 Penzance to London Paddington
16:03 London Paddington to Penzance
16:15 Penzance to London Paddington
Additional 17:17 Exeter St Davids to Penzance
Additional 17:26 Castle Cary to Penzance
17:29 Gatwick Airport to Reading
An additional train service has been planned to operate as shown 18:25 Shalford to Reading
19:04 London Paddington to Plymouth
19:59 Gatwick Airport to Reading
etc
PollsOpen and recent polls
Closed 2024-03-25 Easter Escape - to where?
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
March 28, 2024, 19:16:15 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[133] West Wiltshire Bus Changes April 2024
[132] would you like your own LIVE train station departure board?
[53] Return of the BRUTE?
[44] If not HS2 to Manchester, how will traffic be carried?
[41] Infrastructure problems in Thames Valley causing disruption el...
[32] Reversing Beeching - bring heritage and freight lines into the...
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 [2]
  Print  
Author Topic: Gloucester Area Resignalling CP6  (Read 7656 times)
Dispatch Box
Hero Member
*****
Posts: 433


View Profile
« Reply #15 on: November 16, 2018, 12:11:55 »

I don't think it was the original plan to have all the Western Route controlled from there - by which I mean the plan when it was built - that is why it is only called the Thames Valley Signalling Centre.  Then the plan changed and I thought they were planning to extend the building - always a tricky thing when it is a live installation.  So I guess they have now realised that and have scaled back their aspirations to match the capacity of the building. 

I think there's a difference between what was initially planned - as in going to be done within the foreseeable and plannable future - and what was always intended as the final result. There are maps with the NR» (Network Rail - home page) routes  (their management regions, one of which is "Western"), identified one to one with ROCs (Rail Operating Centre - a centralised location for railway signalling and train control operations for a specific route or region) (excepting some historical anomalies). But the Western Route Plan of 2013 said:
Quote
Signalling migration synopsis
Thames Valley Signalling Centre (TVSC» (Thames Valley Signalling Centre - about)) was commissioned in December 2010 as part of the Reading area enhancement programme. The Route has developed a migration plan for the current Great Western Mainline Power Signal Boxes which sees control of the entire line between Paddington and Bristol, Oxford and Newbury move to TVSC by 2015.

That's signalling, but an ROC also holds the ECR (electric power), NR route, and TOC (Train Operating Company) operations control functions. I suspect that these have ended up employing more people than was foreseen. And of course that "planned" may have assumed that if more space was needed 30 years later than some could be built.

And has someone wearing a "resilience" hat come along to NR's planners of control strategy and asked what the backup arrangements are - e.g. if a major fire puts an ROC out of action for months, how and to where will control of all functions be transferred to be operational the next day? That must be easier to do with more, smaller, control units, though obviously needs some spare capacity somewhere.


I Am assuming that route control in swindon would be a backup incase the worst happened to TVSC. They must have thought of that obviously.
Logged
Dispatch Box
Hero Member
*****
Posts: 433


View Profile
« Reply #16 on: November 16, 2018, 12:17:16 »

I understand it has been removed, as has a similar one at Newbury.

The latter is now in the care of the Swindon Panel Preservation Society.


When I last went to Weston-Super-Mare I had noticed it had gone, there were just desks where it stood. This was back in May 2012, that I visited.
Logged
Dispatch Box
Hero Member
*****
Posts: 433


View Profile
« Reply #17 on: December 24, 2018, 19:46:09 »

What has happened in Gloucester right now, the trains are all new becoming very delayed with one stuck at barnwood.
Logged
MVR S&T
Transport Scholar
Hero Member
******
Posts: 438


View Profile
« Reply #18 on: December 24, 2018, 19:50:01 »

From Cross Country Journey Check:

 Delays to services between Cheltenham Spa and Bristol Parkway
Due to a points failure between Cheltenham Spa and Bristol Parkway all Southbound lines are blocked.
Impact
Train services running through these stations may be delayed. Disruption is expected until 20:45 24/12.
Last Updated:24/12/2018 19:46
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 [2]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page