Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
No recent travel & transport from BBC stories as at 05:15 16 Apr 2024
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
16th Apr (1987)
~ Tulyar arrives at Swanley New Barn Railway (link)

Train RunningCancelled
13:48 London Paddington to Carmarthen
18:02 Worcester Foregate Street to London Paddington
Short Run
07:10 Penzance to London Paddington
15:23 London Paddington to Worcester Foregate Street
15:28 London Paddington to Weston-Super-Mare
18:29 Weston-Super-Mare to London Paddington
18:34 London Paddington to Cheltenham Spa
19:56 Cardiff Central to Taunton
Delayed
15/04/24 21:45 Penzance to London Paddington
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 16, 2024, 05:32:11 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[127] Okehampton
[119] The One-Way Wizzo
[59] Ferry just cancelled - train tickets will be useless - advice?
[53] From Melksham to Tallinn by train
[44] A two carriage train running back and forth - Swedish differen...
[30] 2024 Delays and Cancellations - North Cotswold Line
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: [1]
  Print  
Author Topic: Slippery Conditions Underfoot at Reading  (Read 3288 times)
Gordon the Blue Engine
Transport Scholar
Hero Member
******
Posts: 752


View Profile
« on: February 08, 2019, 16:07:23 »

Yesterday’s wind and rain led to slippery conditions on the footbridge and stairways down to the platforms at Reading yesterday.  The floor tiles are very slippery when wet.  Staff were doing their best to mop up the rain, but extreme care was necessary to avoid slipping.

The roof design is fine when the rain falls vertically, but it wasn’t doing that yesterday and I suspect conditions are even worse to-day.  Wind and rain together are not uncommon, and perhaps the station design should have taken this into account.

Worth noting that the reason given for not installing non-slip floor tiles on the lawn at Paddington was because of its listing status.  This argument doesn’t hold water at Reading.
Logged
eightonedee
Transport Scholar
Hero Member
******
Posts: 1535



View Profile
« Reply #1 on: February 08, 2019, 21:25:09 »

I agree Gordon, indeed this is what I posted on the issue as part of my posting on the recent parliamentary debate thread as part of some observations on the downsides of the new Reading Station (apologies - perhaps I went on a bit in that post, so I'm not surprised you may have missed it!) -

Quote
         - much of the flooring is a dark grey tiling that becomes very slippery when wet turning the floor of the busy over bridge into a hazardous skating rink. This occurs when moisture or snow blows in through the large apertures at the top of the escalators and staircases from the platform, and in some atmospheric conditions when moisture condenses on the floor.

I'm surprised it has not been commented on before (unless it was before I joined last spring). It really ought to be dealt with - unless NR» (Network Rail - home page) specified this material to their designers and contractors, they may have a claim to get them changed as a design or construction defect.
Logged
4064ReadingAbbey
Hero Member
*****
Posts: 455


View Profile
« Reply #2 on: February 09, 2019, 12:52:15 »

Yesterday’s wind and rain led to slippery conditions on the footbridge and stairways down to the platforms at Reading yesterday.  The floor tiles are very slippery when wet.  Staff were doing their best to mop up the rain, but extreme care was necessary to avoid slipping.

The roof design is fine when the rain falls vertically, but it wasn’t doing that yesterday and I suspect conditions are even worse to-day.  Wind and rain together are not uncommon, and perhaps the station design should have taken this into account.

Worth noting that the reason given for not installing non-slip floor tiles on the lawn at Paddington was because of its listing status.  This argument doesn’t hold water at Reading.

Apparently the footbridge was not built as a closed-in space because if this had been done a whole series of extra fire and emergency evacuation precautions would have had to have been built into the structure. These would have significantly inflated the cost.

But the design is, at best, sub-optimal as winds and water can easily enter the space - from the staircase and escalator openings to the clerestories in the roof which only have a metal mesh in the openings. It may be that there were several compromises made during the construction to cut costs, for example the early artists impressions showed glass panelling on each side of the escalators and stairways down to platform level - these were not fitted.

The platform canopies are also much too high to offer much protection if the rain is falling at any angle other than the vertical.

It must at least be possible to find some effective design for windbreaks at the stairway and escalator openings from the bridge which does not infringe the fire regulations. At ground level the building is effectively open from one side to the other - the wind whistles through the gateline at the bottom of the main flight of escalators towards the town as well as eddying around the older gateline in the 1989 building near the Southern platforms now that the windbreak offered by the stairs to the old (now removed) overbridge is no longer there.

I feel sorry for those that have to work on the gates - especially on a cold, wet, windy winter's day...

It's a pity that the station is let down by such details. The basic concept is fine and it works well in reducing train pathing conflicts and the scrums on the platforms by spreading the load over more platform faces.

But it's these niggling little details which stay stuck in the mind.
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page