Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 05:35 29 Mar 2024
- Bus plunges off South Africa bridge, killing 45
* Easter getaway begins with flood alerts in place
- Easter travel warning as millions set to hit roads
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
29th Mar (1913)
Foundation of National Union or Railwaymen (*)

Train RunningCancelled
07:00 Bedwyn to Newbury
07:22 Newbury to Bedwyn
08:13 Newbury to Bedwyn
08:46 Bedwyn to Newbury
09:54 Bedwyn to Newbury
10:22 Newbury to Bedwyn
11:29 Newbury to Bedwyn
11:57 Bedwyn to Newbury
12:52 Bedwyn to Newbury
Short Run
04:54 Plymouth to London Paddington
05:12 Reading to Bedwyn
05:33 Plymouth to London Paddington
05:55 Plymouth to London Paddington
06:00 Bedwyn to London Paddington
06:37 Plymouth to London Paddington
07:03 London Paddington to Paignton
08:35 Plymouth to London Paddington
10:35 London Paddington to Exeter St Davids
Delayed
23:45 London Paddington to Penzance
05:03 Penzance to London Paddington
06:05 Penzance to London Paddington
07:10 Penzance to London Paddington
08:03 London Paddington to Penzance
08:15 Penzance to London Paddington
09:04 London Paddington to Plymouth
09:37 London Paddington to Paignton
10:04 London Paddington to Penzance
11:03 London Paddington to Plymouth
PollsOpen and recent polls
Closed 2024-03-25 Easter Escape - to where?
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
March 29, 2024, 05:35:10 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[92] West Wiltshire Bus Changes April 2024
[91] would you like your own LIVE train station departure board?
[81] Return of the BRUTE?
[69] Infrastructure problems in Thames Valley causing disruption el...
[56] 2024 - Service update and amendment log, Swindon <-> Westbury...
[50] If not HS2 to Manchester, how will traffic be carried?
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: [1] 2
  Print  
Author Topic: Cutting the cost of electrification  (Read 3948 times)
grahame
Administrator
Hero Member
*****
Posts: 40690



View Profile WWW Email
« on: March 14, 2019, 08:53:39 »

From New Civil Engineer

Quote
Rail electrification costs slashed in 10-year plan

The cost of rail electrification projects could be slashed by as much as 50%, if the government commits to a 10-year pipeline of work, according to the Railway Industry Association (RIA).

In its Electrification Cost Challenge report, the RIA claims that lessons learned from the Great Western Electrification Programme (GWEP (Great Western Electrification Program)) – which went £1.8bn over budget – could result in project cost savings of between 33% and 50%.

According to the RIA, one of the main reasons the GWEP cost rose from £1bn in 2009 to £2.8bn in 2016 was because of the “feast or famine” approach taken by the government to electrifying the UK (United Kingdom)’s rail network.

I've been thinking for years (and I know I'm not alone) that an ongoing program would be a darned sight cheaper per mile electrified that a "flood then drought" system.
Logged

Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
CyclingSid
Data Manager
Hero Member
******
Posts: 1918


Hockley viaduct


View Profile
« Reply #1 on: March 14, 2019, 09:37:41 »

Not only railways, most public services. Also saving on maintenance, until it is that bad that you have to replace it; stations, bridges, barracks, etc. etc.
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7156


View Profile
« Reply #2 on: March 14, 2019, 10:45:40 »

The RIA has just released its report* resulting from the "RIA Electrification Cost Challenge". The RIA styles itself "the voice of the rail supply industry", so this report is the view of the engineering companies that made the bits and did most of the work, including some of the design. Since most of them also work for other European railways, it should provide a realistic comparison with their methods too.

The RIA's summary page says:
Quote
The Electrification Cost Challenge report shows how future electrification schemes can be delivered at 33-50% lower cost.

The Electrification Cost Challenge (ECC) report uses examples from the UK (United Kingdom) and internationally to show that the high costs seen on recent projects, including the Great Western Electrification Programme, can be avoided in the future. It suggests that significant increase in cost on some past projects  like Great Western should be seen as a one-off, caused by an unrealistic programme of work, unpreparedness in using novel technologies resulting in poor productivity and a ‘feast and famine’ electrification policy.

The purpose of the report is to:
  •     Set out the benefits of electrification for passengers and customers, and how it supports the Government’s Decarbonisation Challenge;
  •     Summarise UK electrification strategy since 2007;
  •     Discuss the Great Western Electrification Project (GWEP (Great Western Electrification Program)) and the reasons that it failed;
  •     Highlight the lessons that have been learnt; and
  •     Highlight evidence that electrification can be, and is being, delivered for between 33%-50% of the costs of some recent projects using examples from around the UK and internationally.

There's a lot in this document to take in; I'll just put one short quote here (from p43):
Quote
It says something about the ability of the rail industry to forget hard won experience that the ECML (East Coast Main Line) lessons learnt included “The importance of obtaining listed building and other permissions was not appreciated at the outset”.

As well as the earlier NAO report, this report also cites the initial report of the Rail Industry Decarbonisation Task Force (from RSSB (Rail Safety and Standards Board) in January 2019). That provides the underlying justification for future electrification - it's the only way to meet the decarbonisation objectives.

*No live link - I can't make it work - use the button in the web page quoted above.
Logged
CyclingSid
Data Manager
Hero Member
******
Posts: 1918


Hockley viaduct


View Profile
« Reply #3 on: March 14, 2019, 18:07:12 »

Probably not on your reading list, but Public Health England (PHE) have released their document relating to outdoor air quality and public health:
https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/784055/Review_of_interventions_to_improve_air_quality.pdf
260 pages of heavy reading, i have scanned it, electric trains are good diesels aren't. Work hasn't compelled me to read it, so that will probably be it for me. But in many respects it is another well meaning PHE document that is probably counter productive. Most of the bits that are green (on their graphics) the politicians wouldn't touch with a barge pole. Oh well more (electronic) shelf fillers.
Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4356


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #4 on: March 15, 2019, 20:18:09 »

From New Civil Engineer

Quote
Rail electrification costs slashed in 10-year plan

The cost of rail electrification projects could be slashed by as much as 50%, if the government commits to a 10-year pipeline of work, according to the Railway Industry Association (RIA).

In its Electrification Cost Challenge report, the RIA claims that lessons learned from the Great Western Electrification Programme (GWEP (Great Western Electrification Program)) – which went £1.8bn over budget – could result in project cost savings of between 33% and 50%.

According to the RIA, one of the main reasons the GWEP cost rose from £1bn in 2009 to £2.8bn in 2016 was because of the “feast or famine” approach taken by the government to electrifying the UK (United Kingdom)’s rail network.

I've been thinking for years (and I know I'm not alone) that an ongoing program would be a darned sight cheaper per mile electrified that a "flood then drought" system.

Even British Railways suffered from the stop start electrification.  During the lean times BR (British Rail(ways)) was able to deploy its construction teams to assist with maintenance and even with cooperation of its 2 suppliers to do some work on "spec"


The UK has been for decades been politically adverse to spending money on infrastructure, its always a fight to squeeze funding out of the public purse, even Network Rails CP6 (Control Period 6 - The five year period between 2019 and 2024) funding method is different to previous control periods, if the funds are not spent each year there is no rolling over to the next year, the levels of renewals in CP6 and new schemes has been shrunk down compared to the last 15 years
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
johnneyw
Transport Scholar
Hero Member
******
Posts: 2257


From station to station, back to Bristol city....


View Profile
« Reply #5 on: March 15, 2019, 21:26:48 »

There's also an article on making electrification affordable in the March 2019 edition of Modern Railways.
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7156


View Profile
« Reply #6 on: March 16, 2019, 23:25:57 »

The ECC report summarises the reasons for the high cost of GWEP (Great Western Electrification Program) thus:
Quote
The GWEP programme was over-ambitious in trying to introduce internationally novel technology – Overhead Line Equipment (OLE (Overhead Line Equipment, more often "OHLE")) and Plant – on a live project resulting in the design and development of the equipment being incomplete before construction started. Additionally, there was a non-negotiable date for the introduction of new electric trains over which industry had no control, announced before the infrastructure project had been fully scoped and costed, and which added a further major level of risk to timely and cost-efficient delivery. All this against the background of an industry that had not undertaken an electrification project the scale of GWEP for 20 years and so skills and experience needed to be rebuilt.

Reading the report, what stands out is the high cost of inexperience, where the lack of confidence led to very conservative designs. The section on foundations shows how this led to very long poiles that the HOOP trains couldn't cope with:
Quote
In 2012 the assumption on GWEP was that the majority of foundations would be 5m long steel piles placed using the ‘factory train’ (See Section 13). This approach was consistent with the long established ‘ORE/ OLEMI (Overhead Line Equipment Master Index)’ empirical design guidance which had been used on previous UK (United Kingdom) electrification schemes. However, when detailed design was started the ORE method was not used and a ‘first principles’ limit state design approach was adopted as the loads resulting from, amongst other things, higher wire tensions were considered to beyond the evidence base which underpinned the empirical rules. Not only that but different designers were responsible for the OLE system, the masts and the foundations. These interfaces, combined with some unduly onerous design assumptions including design life, resulted in designs for piles up to 12 to 15m long. Another factor as illustrated in Figure 12 was the decision to place piles further from the track to avoid buried cables which meant a significant loss in the power the piling equipment could apply due to the increased operating radius. This also meant the cantilevers27 or portals needed to be longer increasing the loading on the pile which meant it had to be longer still. Unsurprisingly the ‘factory train’ struggled to drive such long piles and productivity was very poor. Many piles were left protruding from the ground requiring de-design and/or repositioning. This resulted in inefficient multiple visits.

All of these issues were further compounded by the immaturity of the OLE design when piling operations commenced which meant that piles, even when installed successfully, were often found to be in the wrong place when the OLE design was completed.
[..]
By 2015 it was recognised that the Great Western was not so different from previous electrification schemes and there was no justification for piles sometimes up to twice as long as previous experience for the same application28. Network Rail therefore undertook a review29 of past experience with the ORE method and commissioned research and full-size tests from the University of Southampton which demonstrated that the ORE method was adequate and therefore it had simply been unnecessary to install the very long piles which had so damaged productivity on Great Western.

That explains some of the less less detailed comments, such as the NAO's.

But that kind of issue can be picked up with a quite limited amount of inputs from more experienced outsiders, which might include some of the contractors, so why did that never happen?
Logged
eightonedee
Transport Scholar
Hero Member
******
Posts: 1532



View Profile
« Reply #7 on: March 16, 2019, 23:38:18 »

Quote
All of these issues were further compounded by the immaturity of the OLE (Overhead Line Equipment, more often "OHLE") design when piling operations commenced which meant that piles, even when installed successfully, were often found to be in the wrong place when the OLE design was completed.

And indeed there are a number of half+ driven but unused piles alongside the track, including stretches such as Didcot to Oxford that have now been deprived (hopefully temporarily) of their OHL (Over-Head Line) as permanent testament to this. They are the 21st Century equivalent of the atmospheric railway pump houses.

I had not realised this review was being undertaken, so will stop harping on about why such a review has not been undertaken, but instead do so about how the lesson has not been learnt and why are we not committed to a long term electrification plan across the remainder of  the GW (Great Western) and UK (United Kingdom) mainline network (and busier/longer branches).

Electrification now! - no more bi-/tri-mode lash-ups or explosive hydrogen trains!
Logged
grahame
Administrator
Hero Member
*****
Posts: 40690



View Profile WWW Email
« Reply #8 on: March 17, 2019, 04:38:51 »


Reading the report, what stands out is the high cost of inexperience, where the lack of confidence led to very conservative designs.

Quote
[text from report]

That explains some of the less less detailed comments, such as the NAO's.

But that kind of issue can be picked up with a quite limited amount of inputs from more experienced outsiders, which might include some of the contractors, so why did that never happen?

We're talking in this thread about the cost of electrification ... but is there a common thread for the cost of just about anything on the railways?

Let's look at station build inflation ...

https://en.wikipedia.org/wiki/Dilton_Marsh_railway_station
Quote
The Great Western Railway opened "Dilton Marsh Halt" on 1 June 1937. The wooden platforms were 300 feet (91 m) long and were provided with small wooden shelters; the construction cost £1,134.

http://www.in2013dollars.com/1937-GBP-in-2018
Quote
In other words, £100 in 1937 is equivalent in purchasing power to £6,636.10 in 2018, a difference of £6,536.10 over 81 years. The 1937 inflation rate was 3.75%. The inflation rate in 2018 was 2.48%. The 2018 inflation rate is higher compared to the average inflation rate of 1.80% per year between 2018 and 2019.
So in 2019 terms, the cost of building a Dilton Marsh would be £75,253 looking at the general inflation rates

Let's take a look at wage inflation over the same period
Filling in a form at https://www.icalculator.info/inflation/salary-inflation-calculator.html
Quote
2019   £57,000.00   = 1937   £1,138.22
So in 2019 terms, the cost of building a Dilton Marsh would be £57,000 looking at the wage inflation rates

I wonder whether a budget of even fifty times the adjusted costs from 1937 (£2.85 million or £3.76 million) would be sufficient these days!
Logged

Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
TonyK
Global Moderator
Hero Member
*****
Posts: 6435


The artist formerly known as Four Track, Now!


View Profile
« Reply #9 on: March 17, 2019, 08:51:49 »

But you wouldn't build a station with wooden platforms and "small wooden shelters" these days. Not anywhere.

The matter of electrification is interesting. There was no doubt something of a start-up cost before the work began. Design, procurement of the HOOP train, training, but I cant see how that would reach 9 figures, let alone 10. Moving all the roads slightly to the left, raising bridges by a metre or so - that's what did for the budget, plus the unanticipated consequences of digging holes by the side of the tracks quickly, to save time. But surely the cost of the actual electric bit - stanchions, small dangly bits, cable, transformers and the like - should have been fairly easy to calculate? If you need 100 kilometres of cable and the cost is £10 per metre isn't too difficult to work out. One days, someone will figure out what went so wrong.

Meantime in Germany, the electrification team, now with years of experience, is going on quietly with the aim of electrifying 200 Km per year.
Logged

Now, please!
Bob_Blakey
Transport Scholar
Hero Member
******
Posts: 783


View Profile
« Reply #10 on: March 17, 2019, 09:23:05 »

For what it's worth - if anything - I have decided that only candidates or parties who either support or commit to a rolling programme of railway electrification will be potential recipients of my vote at the next General Election (?2022). And if not previously sorted out the programme would have to include completion of all the missing bits of the current GW (Great Western) scheme such as via Bath, BPW» (Bristol Parkway - next trains)<>BRI» (Bristol Temple Meads - next trains) & Oxford.
Logged
Lee
Transport Scholar
Hero Member
******
Posts: 7519


GBR - The Emperor's New Rail Network


View Profile WWW
« Reply #11 on: March 17, 2019, 09:34:54 »

Going back to Dilton Marsh, when the platforms were recently lengthened, the work included new shelters and on both the existing platform sections, they seemed to be encompassed by scaffolding, giving the overall appearance of a complete station rebuild.

Do we know how much that all cost as a comparator figure? Im sure someone like grahame must have the figure buried somewhere in the correspondence that circulated at the time.
Logged

Vous devez être impitoyable, parce que ces gens sont des salauds - https://looka.com/s/78722877
grahame
Administrator
Hero Member
*****
Posts: 40690



View Profile WWW Email
« Reply #12 on: March 17, 2019, 13:06:19 »

Going back to Dilton Marsh, when the platforms were recently lengthened, the work included new shelters and on both the existing platform sections, they seemed to be encompassed by scaffolding, giving the overall appearance of a complete station rebuild.

Do we know how much that all cost as a comparator figure? Im sure someone like grahame must have the figure buried somewhere in the correspondence that circulated at the time.

I do recall keeping an eye out for the various platform lengthening costs ... but don't recall any "ah, ha" moment when  I round them.  One or two other members may have data, or be able to point us in the right direction.

Virtually complete rebuild at platform level.   The ramps up from the road to the platforms (which are probably still longer than even the new platforms), and the gates / sign boards / station fixings I don't think were changed.

But you wouldn't build a station with wooden platforms and "small wooden shelters" these days. Not anywhere.

No, you wouldn't.   These things have moved on from wood through concrete to other modern materials.

We had a thread on pop up stations last year, and if a station with two short platforms and two small shelters (whatever the material) could be build for even £150,000 - that's twice what Dilton Marsh cost in the first place after inflation is considered - there would be numerous places worth trying out under Speller experimental rules.
Logged

Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
TonyK
Global Moderator
Hero Member
*****
Posts: 6435


The artist formerly known as Four Track, Now!


View Profile
« Reply #13 on: March 17, 2019, 13:23:07 »


But you wouldn't build a station with wooden platforms and "small wooden shelters" these days. Not anywhere.

No, you wouldn't.   These things have moved on from wood through concrete to other modern materials.

We had a thread on pop up stations last year, and if a station with two short platforms and two small shelters (whatever the material) could be build for even £150,000 - that's twice what Dilton Marsh cost in the first place after inflation is considered - there would be numerous places worth trying out under Speller experimental rules.

Meantime, the cost of the Portway park and ride, due for completion on 2013 at a cost of £400,000 is running at £2.23 million by the time it opens later this year. That will need one platform. Something didn't go to plan.
Logged

Now, please!
Lee
Transport Scholar
Hero Member
******
Posts: 7519


GBR - The Emperor's New Rail Network


View Profile WWW
« Reply #14 on: March 18, 2019, 01:30:48 »

Worth noting too that we have the specific cost example of when the Dilton Marsh platforms were rebuilt in concrete in 1994 - That cost £180,000
Logged

Vous devez être impitoyable, parce que ces gens sont des salauds - https://looka.com/s/78722877
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1] 2
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page