infoman
|
|
« on: June 04, 2019, 07:48:48 » |
|
BBC» Spotlight local news on Monday 3rd June had a feature on the construction work now taking place at Dawlish station area to strengthen the wall
|
|
|
Logged
|
|
|
|
|
|
Pb_devon
|
|
« Reply #3 on: June 10, 2019, 17:22:32 » |
|
I agree with joining the thread mentioned.... and include the “Decision on Dawlish Wall....” thread as well. Brings everything together for Phase 1. Thank you to Admins for establishing the separate threads for the two Phases.
|
|
|
Logged
|
|
|
|
|
REVUpminster
|
|
« Reply #5 on: April 07, 2020, 13:30:08 » |
|
I thought they have completed the uprights or nearly have. The curved cap is still to be fitted and infilling between old and new wall.
|
|
|
Logged
|
|
|
|
eightonedee
|
|
« Reply #6 on: April 07, 2020, 13:57:57 » |
|
Hey - who was thinking they would have liked to go to Devon this Easter? You can sit and watch this and imagine you've booked a room at a sea-front guest house in Dawlish!
|
|
|
Logged
|
|
|
|
SandTEngineer
|
|
« Reply #7 on: April 07, 2020, 16:52:24 » |
|
I thought they have completed the uprights or nearly have. The curved cap is still to be fitted and infilling between old and new wall. Yes, correct. I meant to say the top sections are now being fitted. Here is a view looking towards the wall on 10 March 2020: https://youtu.be/lpFloyGzN1o
|
|
|
Logged
|
|
|
|
|
Thatcham Crossing
|
|
« Reply #9 on: April 16, 2020, 08:11:31 » |
|
The upper section seems to be progressing quite well Is that upper section going to stretch all the way along that part of the seawall (ie, between Dawlish Station and Kennaway Tunnel)?
|
|
|
Logged
|
|
|
|
|
|
SandTEngineer
|
|
« Reply #12 on: May 05, 2020, 18:00:08 » |
|
There is a further camera view looking towards the new wall from the opposite direction. Watching it at high tide the new wall section seems to be doing its job: https://m.youtube.com/watch?v=R1tU6ps_bSk
|
|
« Last Edit: May 05, 2020, 21:03:00 by SandTEngineer »
|
Logged
|
|
|
|
IndustryInsider
|
|
« Reply #13 on: May 05, 2020, 23:38:04 » |
|
Looks to be working well, though they'll never get it finished if work stops when waves are only gently lapping at it like that.
|
|
|
Logged
|
To view my GWML▸ Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
|
|
|
grahame
|
|
« Reply #14 on: May 24, 2020, 07:23:24 » |
|
Multiple threads running on these works at / around Dawlish. To help reduce fragmentation of discussion, may I please direct followups to http://www.passenger.chat/22771 .
|
|
|
Logged
|