Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
No recent travel & transport from BBC stories as at 14:35 16 Apr 2024
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
16th Apr (1987)
~ Tulyar arrives at Swanley New Barn Railway (link)

Train RunningCancelled
22:28 London Paddington to Bristol Temple Meads
22:44 Taunton to Bristol Temple Meads
17/04/24 00:45 London Paddington to Reading
Short Run
15:28 London Paddington to Weston-Super-Mare
18:29 Weston-Super-Mare to London Paddington
19:56 Cardiff Central to Taunton
23:24 Didcot Parkway to London Paddington
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 16, 2024, 14:54:16 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[184] Problems with the Night Riviera sleeper - December 2014 onward...
[110] New station at Ashley Down, Bristol
[101] Okehampton
[55] Our first Interrail tour
[38] Proposals for open access services on new routes
[35] Ferry just cancelled - train tickets will be useless - advice?
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Linked Events
  • Network Rail Avonmouth droppin: July 17, 2019
Pages: [1]
  Print  
Author Topic: Network Rail - work on Severn Beach line, summer 2019  (Read 7206 times)
grahame
Administrator
Hero Member
*****
Posts: 40770



View Profile WWW Email
« on: July 05, 2019, 16:06:41 »

From the Network Rail Media Centre

Quote
Network Rail is carrying out vital maintenance work on the Severn Beach line in Bristol during July and August with work starting this weekend to ensure the continued safe and smooth running of the railway.

The upgrade also means that any future maintenance work in the area will cause less disruption for passengers.

The work involves:

* Removing a set of redundant points near Clifton Down station. Points guide trains onto the right route at junctions, however in this case the points are no longer required and will be replaced with straight track

* Renewing the Avonmouth Dock level crossing at West Town Road by upgrading the surface and replacing the tarmac either side of the crossing

* Installing new track between St Andrews Road level crossing and Avonmouth station

The work is being completed over a mixture of weekday nights, Saturday nights and Sunday daytime shifts between Saturday 6 July and Saturday 10 August, with some follow up work in September

As a result of these upgrades, buses will replace trains on three Sundays including 7 and 28 July as well as 4 August.

To keep residents updated Network Rail will be hosting a community drop-in session from 4.30pm to 7pm on Wednesday 17 July at the Avonmouth Community Centre, BS11 9EN.

This would seem to be a good opportunity to do any work at Portway Parkway which requires a possession.
Logged

Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
johnneyw
Transport Scholar
Hero Member
******
Posts: 2270


From station to station, back to Bristol city....


View Profile
« Reply #1 on: July 05, 2019, 17:59:31 »

That might have been useful but I doubt the opportunity will be realised as there isn't really much time until then and there's been no announcement of any work to be started shortly at Portway.

I was curious about whether the whole line required a possession for the track replacement or only the Avonmouth to SB (Signal Box) stretch but I am guessing that a lot of the materials involved (rails, ballast etc) will be brought in/taken away by rail not road.
Logged
Adrian
Transport Scholar
Sr. Member
******
Posts: 171


View Profile
« Reply #2 on: July 05, 2019, 20:42:47 »

Why the over-use of this word "upgrade" (and, for that matter, "improvement works") seemingly whenever NR» (Network Rail - home page) do routine replacements?
An upgrade surely means that something will be made tangibly better from a user's perspective?
Logged
johnneyw
Transport Scholar
Hero Member
******
Posts: 2270


From station to station, back to Bristol city....


View Profile
« Reply #3 on: July 05, 2019, 21:29:27 »

Why the over-use of this word "upgrade" (and, for that matter, "improvement works") seemingly whenever NR» (Network Rail - home page) do routine replacements?
An upgrade surely means that something will be made tangibly better from a user's perspective?

The stretch between Avonmouth and St Andrews Road is still a bit bone shaking (it was worse) but I thought that was fun. Smoothing the way may make it a little more comfortable and may allow for going a little faster but I don't know if I'll treat it as an improvement. 😐
Logged
Red Squirrel
Administrator
Hero Member
*****
Posts: 5205


There are some who call me... Tim


View Profile
« Reply #4 on: July 06, 2019, 12:56:28 »

Very intrigued to know which set of points they plan to remove...
Logged

Things take longer to happen than you think they will, and then they happen faster than you thought they could.
JayMac
Data Manager
Hero Member
******
Posts: 18918



View Profile
« Reply #5 on: July 06, 2019, 22:40:08 »

Very intrigued to know which set of points they plan to remove...

Me too. I'm not aware of any redundant points near Clifton Down.
Logged

"Build a man a fire and he'll be warm for the rest of the day. Set a man on fire and he'll be warm for the rest of his life."

- Sir Terry Pratchett.
martyjon
Transport Scholar
Hero Member
******
Posts: 1941


View Profile
« Reply #6 on: July 06, 2019, 22:48:52 »

Very intrigued to know which set of points they plan to remove...

Me too. I'm not aware of any redundant points near Clifton Down.


Might be that trap point in the tunnel which has been clipped and padlocked ever since the line was singled.
Logged
rich0099
Jr. Member
**
Posts: 19


View Profile
« Reply #7 on: July 08, 2019, 08:19:30 »

I'm quite glad the sleepers are being replaced between AVN and SAR - Every evening on the way home I peer down and see them in a terrible state of disrepair.

I know all of you know far more about the rail infrastructure than I - but I'm curious - the curve/radius between AVN and the SAR Level crossing is quite tight (sorry - I don't know the technical term). When replacing the rail, would the curve of the rail be created on site - of would it be pre-shaped?

Sorry for such a noob question - I'm just interested.
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7162


View Profile
« Reply #8 on: July 08, 2019, 11:16:15 »

I'm quite glad the sleepers are being replaced between AVN and SAR - Every evening on the way home I peer down and see them in a terrible state of disrepair.

I know all of you know far more about the rail infrastructure than I - but I'm curious - the curve/radius between AVN and the SAR Level crossing is quite tight (sorry - I don't know the technical term). When replacing the rail, would the curve of the rail be created on site - of would it be pre-shaped?

Sorry for such a noob question - I'm just interested.

The answer is basically that rail is a lot more bendy than it looks. Rail is made in 216 m lengths (max, on latest info I have), and several taken to their installation site on a train - and it just bends to go round the corners. OK, there's a little more to it than that, like keeping all the rails vertical, but for the curvatures involved (that curve at AVN has a radius of about 200 m) it's not even very springy. Of course it is heavy, and the forces needed to lift and bend it are correspondingly large. Note that when talking about rail expansion, and buckling in the heat, the forces involved there (which are along the rail) are are very much bigger.
Logged
johnneyw
Transport Scholar
Hero Member
******
Posts: 2270


From station to station, back to Bristol city....


View Profile
« Reply #9 on: July 08, 2019, 11:17:00 »

I'm quite glad the sleepers are being replaced between AVN and SAR - Every evening on the way home I peer down and see them in a terrible state of disrepair.

I know all of you know far more about the rail infrastructure than I - but I'm curious - the curve/radius between AVN and the SAR Level crossing is quite tight (sorry - I don't know the technical term). When replacing the rail, would the curve of the rail be created on site - of would it be pre-shaped?

Sorry for such a noob question - I'm just interested.

I'm not a Permanent Way expert myself but while following the well blogged coverage of the rail laying on the Glos Warks Steam Railway extension, one of the noticeable things was how bendy the rails were when being unloaded on site from the flat wagons. These seemed to quite easily* fit into the pre laid sleepers just ahead, even on a bend.

*I say "quite easily" from the comfort of a sofa accompanied by a coffee and bun. Those working on the project may employ slightly different terminology.
« Last Edit: July 08, 2019, 11:36:52 by johnneyw » Logged
Bmblbzzz
Transport Scholar
Hero Member
******
Posts: 4256


View Profile
« Reply #10 on: July 08, 2019, 18:04:18 »

I saw the rails being laid on the Filton Four Tracking and they looked quite bendy even in a vertical plane. I think they heat them, which presumably increases their flex?
Logged

Waiting at Pilning for the midnight sleeper to Prague.
Red Squirrel
Administrator
Hero Member
*****
Posts: 5205


There are some who call me... Tim


View Profile
« Reply #11 on: July 08, 2019, 19:09:15 »

No heat involved in the laying process. This video shows how it's done on a modern railway: https://vimeo.com/109587564
Logged

Things take longer to happen than you think they will, and then they happen faster than you thought they could.
Bmblbzzz
Transport Scholar
Hero Member
******
Posts: 4256


View Profile
« Reply #12 on: July 08, 2019, 20:48:18 »

Yep, that's the machine I saw.
Logged

Waiting at Pilning for the midnight sleeper to Prague.
paul7575
Transport Scholar
Hero Member
******
Posts: 5318


View Profile
« Reply #13 on: July 08, 2019, 21:00:03 »

Remember new rail is flexible enough to be delivered on specialist trains, that can take normal track curvature during the journey from the manufacturer or welding plant. 

The delivery trains carry numerous rails at the same time, (up to 32 I think), but the rails can still flex from side to side and deal with changing gradients quite happily...

New rail for renewals of existing track is often delivered and pre-positioned between the ‘other’ running tracks, and a technique called thimbling, using a road rail machine attachment, is used to lift and position the new rail into the sleepers.  The following videos show how flexible the rail is as they lift it sideways a few metres, and also how quick they can do it:

https://youtu.be/mK1d-nscTsc

https://youtu.be/SupWOAddodw

Hope they are of interest...

Paul
« Last Edit: July 08, 2019, 21:37:02 by paul7755 » Logged
rich0099
Jr. Member
**
Posts: 19


View Profile
« Reply #14 on: July 09, 2019, 08:08:40 »

Thanks for everyone's input - much appreciated (knowledge is a wonderful thing).  Smiley
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page