Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 20:15 08 Oct 2024
 
- Troubled HS2 rail line may now run to central London, minister says
- Euston, we have a problem: Concern over weekly Friday night scramble
- 'I felt isolated in school': Traveller children have highest persistent absence rate
- Be prepared to wait longer for an electric taxi, says Uber boss
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 11/10/24 - TWSW General Meeting
22/10/24 - BoA Public Transport talk
25/10/24 - Melksham Transport Group
16/11/24 - Special Bletchey to Bicester

On this day
8th Oct (1952)
Harrow and Wealdstone Rail Crash (link)

Train RunningCancelled
18:30 Plymouth to Penzance
18:54 Reading to Gatwick Airport
20:29 Gatwick Airport to Reading
23:21 Swindon to Gloucester
Short Run
18:15 Penzance to Exeter St Davids
21:00 Penzance to Exeter St Davids
22:16 Cheltenham Spa to Swindon
Delayed
20:29 Par to Newquay
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
October 08, 2024, 20:21:05 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[110] Circle line, 7th October 2024
[96] Euston: a five point plan
[65] New station at Ashley Down, Bristol
[50] Railway Clearing House Maps
[37] 11th October 2024 - Travelwatch Southwest general meeting, Tau...
[34] HS2 - Government proposals, alternative routes and general dis...
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: 1 [2] 3
  Print  
Author Topic: North Downs December 2019 timetable changes and lack of investment  (Read 23415 times)
grahame
Administrator
Hero Member
*****
Posts: 42068



View Profile WWW Email
« Reply #15 on: October 11, 2019, 17:45:25 »

The continued frustration of both passenger groups and GWR (Great Western Railway) at the lack of improvements possible on the North Downs line was made very clear at today's GWR stakeholder conference.  With  a very clear message that GWR really want it to happen, but aren't able / allowed to do so because of limits to what the infrastructure provider is willing and able to let them do.
Logged

Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
eightonedee
Transport Scholar
Hero Member
******
Posts: 1637



View Profile
« Reply #16 on: October 12, 2019, 19:24:24 »

Quote
According to a post on railforums, the 3tph service on the North Downs Line, much delayed, is now happening next May.


Really? Where are they going to get the rolling stock from if the 769s are not available by then - or if they are as unsuitable as recent posts imply?
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7298


View Profile
« Reply #17 on: October 12, 2019, 19:45:22 »

Quote
According to a post on railforums, the 3tph service on the North Downs Line, much delayed, is now happening next May.


Really? Where are they going to get the rolling stock from if the 769s are not available by then - or if they are as unsuitable as recent posts imply?

I think you're forgetting that May 2020 is in the future. There are no facts in the future - only such as prediction, beliefs, estimates or, as in this case, plans (several meanings). As GWR (Great Western Railway) currently plan to use these trains, they (involving NR» (Network Rail - home page) etc.) are drawing up detailed plans do implement that. If something prevents that plan happening, new plans will be needed. Or do I mean when?
Logged
grahame
Administrator
Hero Member
*****
Posts: 42068



View Profile WWW Email
« Reply #18 on: October 12, 2019, 20:00:14 »

At the Stakeholder conference yesterday, we were told that a second 'production line' was to be opened for GWR (Great Western Railway) 769s so that they're not waiting for units to follow follow other TOC (Train Operating Company)'s orders.   Also, notably, the minister told us (wit a prompt from his civil servants in the back of the room) that there will be a dispensation to allow the 143s to stay into the new year.   Finally, the minister spoke as if five car suburban trains are already pretty standard in the Bristol area, and I suspect a bit of later-than-planned-even-now lengthening could provide ....

Then of course the 125 group may be able to lend a castle ...
Logged

Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
TonyK
Global Moderator
Hero Member
*****
Posts: 6538


The artist formerly known as Four Track, Now!


View Profile
« Reply #19 on: October 12, 2019, 23:08:05 »

Just a warning to people to expect timetabling changes on the Gatwick to Reading line in December.


Sunfire, we have forgotten our manners - welcome to the Great Western Passengers' Forum! And thank you for a useful heads-up.
Logged

Now, please!
FenMan
Jr. Member
**
Posts: 21


View Profile
« Reply #20 on: October 13, 2019, 00:29:46 »

At the Stakeholder conference yesterday, we were told that a second 'production line' was to be opened for GWR (Great Western Railway) 769s so that they're not waiting for units to follow follow other TOC (Train Operating Company)'s orders. 

Hmm, that'll hurt the ROSCO» (Rolling Stock Owning Company - about)'s profit margin. That GWR have applied pressure, and the ROSCO has buckled, says plenty.

Smells of last chance saloon to me. I await developments with interest.
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7298


View Profile
« Reply #21 on: September 04, 2020, 18:05:12 »

According to a post on railforums, the 3tph service on the North Downs Line, much delayed, is now happening next May.

With only one week to go, the WTT (Working Time-Table) now visible online has ... 3 tph most of the day, one to Gatwick and two to Redhill! (The "paper" one shows the same.) So presumably that will happen - a big jump from the current service of 1 tph most of the day, plus a few peak extras two of which get to Gatwick. The one train that stopped in the past at Winnersh to collect kids out of school doesn't do so now, nor after these changes.

I can understand that Gatwick is not expected to become a very popular destination this autumn, but it still looks odd. If it's to cope with the loadings and allow enough spacing in small trains, how does it match the split of  minor/only major stations? There are two semifasts, evenly spaced, one of which is a bit faster than the other - it's non-stop Wokingham to Guildford, where it overtakes the stopper (most of which are indeed all stops).

Is there any operational benefit? I did wonder if it could mean one less diagram, but the faster semifast, which doesn't go to Gatwick, goes off to the siding for 30 minutes to preserve the timing for Gatwick. It also passes the train from Gatwick in Redhill, and is overtaken by the stopper while in its siding. I can see that going wrong occasionally...
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10285


View Profile
« Reply #22 on: September 04, 2020, 18:25:50 »

I heard the intention is to get the trains into the timetable, as a kind of 'preview' service, then fine tune them over time to remove some oddities and optimise them as best as possible.  Some further changes are planned to happen in December when the 769s (hopefully) get phased into service, which will hopefully optimise turn rounds margins and therefore improve performance. 

Then it's a case of wait and see how everything settles in, and see what the market is like after the pandemic, with a particular eye on interfaces with SWR» (South Western Railway - about) trains between Reading and Wokingham, and Southern on the line between Reigate-Redhill-Gatwick.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
CyclingSid
Data Manager
Hero Member
******
Posts: 2044


Hockley viaduct


View Profile
« Reply #23 on: September 06, 2020, 08:03:35 »

Hopefully it will improve the connections with SWR» (South Western Railway - about) trains (old fashioned idea?). I have spent best part of an hour reading on Guildford station between the Portsmouth - Waterloo train and getting the Reading train on recent Saturdays.
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7298


View Profile
« Reply #24 on: September 06, 2020, 10:51:51 »

Hopefully it will improve the connections with SWR» (South Western Railway - about) trains (old fashioned idea?). I have spent best part of an hour reading on Guildford station between the Portsmouth - Waterloo train and getting the Reading train on recent Saturdays.

Well ... it looks as if someone has been listening in on your unspoken complaints. Now, the train from Portsmouth is on P5 and the fast to Reading on P6 - five minutes for a cross-platform change! Mind you the poor suckers who need to change between the two Reading services have to trek over or under to or from P8. And of course these short changes do, just ever so often, go wrong. Never mind, there's another almost as fast Reading train within half an hour.
Logged
RichT54
Sr. Member
****
Posts: 130


View Profile
« Reply #25 on: September 15, 2020, 21:29:13 »

GWR (Great Western Railway) Press Release for Monday 14th September 2020.

Quote
Great Western Railway has today started to introduce a third hourly train service on the North Downs line, realising ambitions held for more than a decade.

From Monday 14 September, eight extra weekday trains will run between Reading and Redhill - four in each direction - and increasing the number of services from two-an-hour to three-an-hour at key parts of the day.

https://www.gwr.com/about-us/media-centre/news/2020/september/gwr-realises-ambition-for-three-trains-an-hour-on-north-downs-line
Logged
eightonedee
Transport Scholar
Hero Member
******
Posts: 1637



View Profile
« Reply #26 on: September 15, 2020, 21:45:22 »

Somewhat bizarrely though we've lost a train from Reading between 8 and 9, when there is just one service (the old 8-04ish having been moved forward to 7-58 a little while back)- the 8-32/4ish to Gatwick has gone even though it was a useful second string for Guildford 9-30 starters!
Logged
RichT54
Sr. Member
****
Posts: 130


View Profile
« Reply #27 on: September 16, 2020, 09:34:42 »

From some posts on RailUK forums it appears that the start of the new services has been rather disrupted by infrastructure issues.

https://www.railforums.co.uk/threads/3tph-on-north-downs-line.140595/post-4773385

Logged
ellendune
Transport Scholar
Hero Member
******
Posts: 4484


View Profile
« Reply #28 on: September 16, 2020, 10:47:20 »

Somewhat bizarrely though we've lost a train from Reading between 8 and 9, when there is just one service (the old 8-04ish having been moved forward to 7-58 a little while back)- the 8-32/4ish to Gatwick has gone even though it was a useful second string for Guildford 9-30 starters!

That's very careless! Where did we last have it?
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10285


View Profile
« Reply #29 on: September 23, 2020, 14:49:08 »

From observations on the ground and on OTT (Open Train Times website) maps it seems to be going reasonably well at the moment.  The known pinch points, are still pinch points, but are just about coping. 

Redhill is seeing quite a few short notice platform changes and stacking of trains (some would say that's nothing new!), and it's a shame that some of the additional trains have to head from Redhill into the loco siding to get out of the way for a while, which means crossing over all the other tracks twice.  That probably causes more hassles than sending them through to Gatwick, so as soon as the rebuild there is completed the better.

Guildford also seeing a few platform changes, but coping reasonably well, although if the additional Redhill>Reading service is more than a couple of minutes late, it does knock on to the Reading stopper and Farnham stopper behind.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 [2] 3
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page