Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 19:15 19 Apr 2024
* Some Welsh roads to revert to 30mph after backlash
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
19th Apr (1938)
Foundation, Beatties of London (link)

Train RunningCancelled
19:02 London Paddington to Bristol Temple Meads
19:18 London Paddington to Swansea
19:23 London Paddington to Oxford
21:02 Oxford to London Paddington
Short Run
15:50 Penzance to Gloucester
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 19, 2024, 19:17:35 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[333] Rail to refuge / Travel to refuge
[69] Rail delay compensation payments hit £100 million
[53] Somerset and Dorset Devonshire Tunnel flood
[30] Difficult to argue with e-bike/scooter rules?
[28] Signage - not making it easy ...
[6] IETs at Melksham
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 [2]
  Print  
Author Topic: Frosting applied to footbridge windows at Reading  (Read 9628 times)
Electric train
Transport Scholar
Hero Member
******
Posts: 4362


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #15 on: December 22, 2019, 07:42:37 »

I’m sure the architect would be mortified by this assault on his/her design. 

I wouldn't feel too sorry for them. Am I correct in remembering comments by others that the footbridge design allowed in rain and wind? Was that ever rectified?
No it wasn't - and won't be unless somebody has several millions to spare.

If the space is enclosed it comes under a whole new set of fire and escape regulations - and to meet these requires £££. At the moment it is treated as some form of open space (I don't know the exact regulations) and therefore does not need the extra escape passages and so on which would otherwise be necessary.

The openness of Reading overbridge concourse was done for the same reason for the openness of Blackfriars and London Bridge.  It was explained to me by a Civil Engineer who was involved in Blackfriars and Farringdon the main concern is in the event of an IED exploding the pressure from such a device would cause a much higher number of casualties in an enclosed space, there was also the consideration as mentioned of a fire and the need to vent smoke. 

Stations are designed for the free flow of people the most important time is in an emergency evacuation 
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
Marlburian
Hero Member
*****
Posts: 692


View Profile
« Reply #16 on: January 02, 2020, 16:32:40 »

This afternoon I had a few minutes to spare at Reading Station and noticed that the windows facing westover platforms 7 and 8 remain unfrosted, as do those by the Starbucks seating area, where the immediate view is obscured by a canopy.

And I don't think that the windows facing east have been frosted. (I didn't think to notice.)

Marlburian
Logged
eightonedee
Transport Scholar
Hero Member
******
Posts: 1535



View Profile
« Reply #17 on: January 03, 2020, 07:59:13 »

 Having just walked across the overbridge, I can confirm that the frosting has been applied both sides but only above platforms 9 to 12 inclusive.

I cannot understand why only these platforms in the light of the explanations put forward. Can anyone else explain?
Logged
grahame
Administrator
Hero Member
*****
Posts: 40784



View Profile WWW Email
« Reply #18 on: January 03, 2020, 08:03:00 »

Having just walked across the overbridge, I can confirm that the frosting has been applied both sides but only above platforms 9 to 12 inclusive.

I cannot understand why only these platforms in the light of the explanations put forward. Can anyone else explain?

Suggest ... the platforms the none-stop IETs (Intercity Express Train) pass through?
Logged

Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 [2]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page