Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 08:15 20 Apr 2024
- Some Wales roads to revert to 30mph after backlash
- BBC presenter reports racist abuse on London train
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
20th Apr (1789)
Opening of Sapperton Canal Tunnel

Train RunningCancelled
06:38 Weymouth to Gloucester
07:38 Bristol Temple Meads to Worcester Foregate Street
07:40 Penzance to Plymouth
07:55 Bristol Temple Meads to Penzance
08:15 Penzance to London Paddington
08:38 Bristol Temple Meads to Worcester Foregate Street
18:52 London Paddington to Great Malvern
19:19 Carmarthen to Swansea
Short Run
05:39 Portsmouth & Southsea to Bristol Temple Meads
06:30 Cardiff Central to Portsmouth Harbour
06:34 Great Malvern to Bristol Temple Meads
06:34 Bristol Temple Meads to Worcester Shrub Hill
06:50 Frome to Filton Abbey Wood
07:05 Westbury to Southampton Central
07:22 Exeter St Davids to Penzance
07:25 Bristol Temple Meads to Exeter St Davids
07:40 Worcester Foregate Street to Bristol Temple Meads
07:42 Weston-Super-Mare to Cardiff Central
07:54 Reading to Gatwick Airport
08:30 Southampton Central to Bristol Temple Meads
08:45 Bristol Temple Meads to Warminster
08:52 Worcester Foregate Street to Bristol Temple Meads
14:48 London Paddington to Carmarthen
21:07 Gloucester to Bristol Temple Meads
Delayed
05:25 Swansea to London Paddington
06:30 Bristol Temple Meads to London Paddington
06:50 Westbury to Weymouth
08:09 Bristol Temple Meads to Gloucester
09:30 Weymouth to Gloucester
09:52 Worcester Foregate Street to Bristol Temple Meads
10:52 Worcester Foregate Street to Bristol Temple Meads
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 20, 2024, 08:17:44 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[315] Somerset and Dorset Devonshire Tunnel flood
[250] Rail to refuge / Travel to refuge
[42] Rail delay compensation payments hit £100 million
[37] Problems with the Night Riviera sleeper - December 2014 onward...
[18] Difficult to argue with e-bike/scooter rules?
[17] Signage - not making it easy ...
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: [1] 2
  Print  
Author Topic: Signalling shutdown - Croydon area - Wednesday night 18.12.19  (Read 4109 times)
grahame
Administrator
Hero Member
*****
Posts: 40784



View Profile WWW Email
« on: December 20, 2019, 01:05:20 »

Fascinating insight from Netwok Rail into a shutdown in the Croydon area on Wednesday.

Quote
Disruption at Victoria and London Bridge:
how it happened and what we are doing about it

John Halsall, Managing Director, Southern region

On Wednesday night, the signalling system that controls the safe movement of trains through Croydon shut itself down to protect itself from an external power supply problem.

A power surge from our external provider put too many volts into our supply for around 20 seconds.

Our system is designed to fail-safe, so every signal – the traffic lights of the railway – went red and every train was brought to a stand.

The result was that for almost an hour we were unable to run services on the busiest section of the UK (United Kingdom)’s railway, causing disruption that lasted until Thursday morning.

[continues]
Logged

Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
broadgage
Transport Scholar
Hero Member
******
Posts: 5408



View Profile
« Reply #1 on: December 20, 2019, 09:34:27 »

Was there any effect on electrical equipment outside of the railway ? Or was this another case of railway equipment being highly sensitive to minor electricity supply fluctuations that no one else noticed.

For signalling equipment of such importance, was no standby supply available? At the very least, I would expect a UPS with a battery run time of some minutes, and with a duplicated mains voltage supply into the UPS.
Logged

A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard.
It has space for cycles, surfboards,luggage etc.
A 5 car DMU (Diesel Multiple Unit) is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #2 on: December 20, 2019, 10:11:48 »

Was there any effect on electrical equipment outside of the railway ? Or was this another case of railway equipment being highly sensitive to minor electricity supply fluctuations that no one else noticed.

For signalling equipment of such importance, was no standby supply available? At the very least, I would expect a UPS with a battery run time of some minutes, and with a duplicated mains voltage supply into the UPS.

If you read it again it says it was a power surge, not a loss of supply.  Electronic signalling equipment has strict set voltage limits and if these are exceeded the electronic equipment involved will self isolate to protect it from all being blown to pieces......   Normally things will reset after the supply restores to normal limits, but perhaps in this instance it didn't for some time due to other external factors.
Logged
onthecushions
Transport Scholar
Hero Member
******
Posts: 977


View Profile
« Reply #3 on: December 20, 2019, 10:37:45 »


If the CB opens then there is certainly a loss of supply, however caused, hi-volts or lo-volts.

If there was uninteruptable power available to turn the signals red then there was the same power around to maintain the system.

I despair of electrical engineers.

OTC
Logged
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #4 on: December 20, 2019, 10:43:24 »


If the CB opens then there is certainly a loss of supply, however caused, hi-volts or lo-volts.

If there was uninteruptable power available to turn the signals red then there was the same power around to maintain the system.

I despair of electrical engineers.

OTC

Lineside signalling equipment is not usually supported by a UPS, but by a standby diesel generator.  We don't generally utilise Circuit Breakers but use hard wired fuses which are not susceptable to voltage/frequency flucuations, but only to excessive currents.

Does your despair also apply to Signal Engineers...... Tongue
« Last Edit: December 20, 2019, 11:12:44 by SandTEngineer » Logged
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #5 on: December 20, 2019, 11:04:12 »

I don't do TWITTER but apparently an explanation of what happened has been posted by NR» (Network Rail - home page) here which seems to be the same info a in the link posted by Grahame in the opening topic post: https://mobile.twitter.com/networkrailse/status/1207703163358392322?s=21
« Last Edit: December 20, 2019, 11:14:52 by SandTEngineer » Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10116


View Profile
« Reply #6 on: December 20, 2019, 11:08:26 »

Very impressive explanation and apology from NR» (Network Rail - home page) there.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
ellendune
Transport Scholar
Hero Member
******
Posts: 4452


View Profile
« Reply #7 on: December 20, 2019, 11:16:48 »

Very impressive explanation and apology from NR» (Network Rail - home page) there.

For those who don't do twitter it includes a link to a longer explanation on their website
Logged
onthecushions
Transport Scholar
Hero Member
******
Posts: 977


View Profile
« Reply #8 on: December 20, 2019, 12:13:14 »

[

Does your despair also apply to Signal Engineers...... Tongue


No. I think they/you are marvellous, making me and mine blissfully safe in rail travel. Many thanks.

A pity S&T (Signalling and Telegraph) types don't train highways designers.

Season's greetings,

OTC
Logged
broadgage
Transport Scholar
Hero Member
******
Posts: 5408



View Profile
« Reply #9 on: December 20, 2019, 13:51:53 »

Was there any effect on electrical equipment outside of the railway ? Or was this another case of railway equipment being highly sensitive to minor electricity supply fluctuations that no one else noticed.

For signalling equipment of such importance, was no standby supply available? At the very least, I would expect a UPS with a battery run time of some minutes, and with a duplicated mains voltage supply into the UPS.

If you read it again it says it was a power surge, not a loss of supply.  Electronic signalling equipment has strict set voltage limits and if these are exceeded the electronic equipment involved will self isolate to protect it from all being blown to pieces......   Normally things will reset after the supply restores to normal limits, but perhaps in this instance it didn't for some time due to other external factors.

I DID» (Didcot Parkway - next trains) read it properly. A UPS protects not only against complete loss of power, but also against voltage out of tolerance as was reported to be the case.
If the mains supply is present but with an excessively high or low voltage, then a UPS will either correct this via a built in transformer, or will revert to battery power.
Logged

A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard.
It has space for cycles, surfboards,luggage etc.
A 5 car DMU (Diesel Multiple Unit) is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
Surrey 455
Hero Member
*****
Posts: 1230


View Profile
« Reply #10 on: December 20, 2019, 22:31:02 »

I was sitting on a very delayed train at London Bridge that night which was cancelled and later re-instated (although about an hour later) after I had got off and gone to Waterloo instead Sad. I was impressed with the scrolling information screens on that train, a Southern 377. This told me that all trains would be delayed or cancelled due to power supply failure in the East Croydon area. A few days earlier I was on another Southern 377 when approaching Epsom, the scrolling display mentioned that there were no SWR» (South Western Railway - about)  trains between Epsom and Ewell West because of a landslip.
I have never seen this up to date information on any other train before. Is it keyed in manually or transmitted from a control centre?
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7163


View Profile
« Reply #11 on: December 20, 2019, 23:42:33 »

I was sitting on a very delayed train at London Bridge that night which was cancelled and later re-instated (although about an hour later) after I had got off and gone to Waterloo instead Sad. I was impressed with the scrolling information screens on that train, a Southern 377. This told me that all trains would be delayed or cancelled due to power supply failure in the East Croydon area. A few days earlier I was on another Southern 377 when approaching Epsom, the scrolling display mentioned that there were no SWR» (South Western Railway - about)  trains between Epsom and Ewell West because of a landslip.
I have never seen this up to date information on any other train before. Is it keyed in manually or transmitted from a control centre?

It will be sent by radio, but perhaps set up in advance and triggered.

Bombardier's in-house CIS (Customer Information System) makers BTROS offer a Real Time Passenger Information System (RTPIS), of which they say:

Quote
Unlike the current PIS (Passenger Information System) Systems, where the on-train modems communicate directly with a single remote ground based system fitted with a dial-up modem, the RTPIS converted trains communicate via an intermediate secure hosted Transmission Router. This arrangement enables RTPIS uploads, RTPIS downloads, route database uploads and GPS tracking operations to be available concurrently from multiple ground based support locations, enabling quicker and easier updates to the PIS system.

However, from 2013 if not earlier, the OTMR (On Train Monitoring Recorder) (on-board train monitoring recorder) on 377s had developed a bit and might do that already: "The OTMR has ship to shore capability and a real time passenger information system. GPS is used to verify the train’s position so that relevant messages can be transmitted for the location. This is being applied system-wide." (Piers Connor for Modern Railways March 2013)

But if it's Bombardier standard kit, almost new 387s could have it too.
Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4362


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #12 on: December 21, 2019, 12:54:28 »

I don't know the specifics of this particular event, but I do know something about the power supplies on the ***Southern Region*** of NR» (Network Rail - home page)

First the term power surge is used in the rail industry by folks in the operating department, a true power surge would fry a lot of equipment other than just the signalling. It was more likely to have been a short loss of power, just a few milliseconds is sufficient for the signalling system to go into a fail safe mode.  Basically, many of the modules used in signalling have "crowbar" protection, this device shorts out the supply into the module if it sees voltage transient's or an unstable supply and blows the fuse in the module; the signalling will fail safe but this will stop or restrict the movement of trains until a tech has attended site.

NR ***Southern Region*** takes its power from a number of DNO (Distribution Network Operator) and TNO (Transmission Network Operator) Grid sites a fault on their system of on NR's own internal 33kV distribution network can be sufficient to cause the above yet to any user they might have notice the light dip a bit.

There are UPS around the NR signalling supply system but these are not always installed, a complex set of sums used by commercial people of ten overrides the Engineers choice.


*** as an Western Region (BR (British Rail(ways))) it uncomfortable working in the Southern Region  Grin Grin Grin
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
ellendune
Transport Scholar
Hero Member
******
Posts: 4452


View Profile
« Reply #13 on: December 21, 2019, 13:38:31 »

First the term power surge is used in the rail industry by folks in the operating department, a true power surge would fry a lot of equipment other than just the signalling. It was more likely to have been a short loss of power, just a few milliseconds is sufficient for the signalling system to go into a fail safe mode. 

Why would NR» (Network Rail - home page) say it was an over-voltage fault lasting 20 seconds or more then?
Logged
onthecushions
Transport Scholar
Hero Member
******
Posts: 977


View Profile
« Reply #14 on: December 21, 2019, 15:42:26 »


There are UPS around the NR» (Network Rail - home page) signalling supply system but these are not always installed, a complex set of sums used by commercial people of ten overrides the Engineers choice.


I'm intrigued but not surprised to learn the actual age of the railway's commercial people.

Greetings!

OTC
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1] 2
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page