Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 16:15 28 Mar 2024
* Passengers pleaded with knifeman during attack
- How do I renew my UK passport and what is the 10-year rule?
- Jet2 launches first flight from Liverpool airport
- Easter travel warning as millions set to hit roads
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
28th Mar (1988)
Formal end to carrying coffins by BR (link)

Train RunningCancelled
13:28 Weymouth to Gloucester
15:16 London Paddington to Cardiff Central
15:30 Bristol Temple Meads to London Paddington
16:04 Bristol Temple Meads to Filton Abbey Wood
16:51 Filton Abbey Wood to Bristol Temple Meads
17:23 Portsmouth Harbour to Cardiff Central
17:54 Cardiff Central to London Paddington
17:57 London Paddington to Worcester Foregate Street
19:33 London Paddington to Worcester Shrub Hill
20:56 Worcester Foregate Street to London Paddington
Short Run
12:03 London Paddington to Penzance
13:03 London Paddington to Plymouth
13:10 Gloucester to Weymouth
15:10 Gloucester to Weymouth
15:23 Portsmouth Harbour to Cardiff Central
15:30 Cardiff Central to Portsmouth Harbour
16:19 Carmarthen to London Paddington
16:23 Portsmouth Harbour to Cardiff Central
16:54 Cardiff Central to London Paddington
Delayed
13:30 Cardiff Central to Portsmouth Harbour
13:55 Paignton to London Paddington
13:59 Cardiff Central to Penzance
14:30 Cardiff Central to Portsmouth Harbour
14:36 London Paddington to Paignton
PollsOpen and recent polls
Closed 2024-03-25 Easter Escape - to where?
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
March 28, 2024, 16:17:10 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[142] West Wiltshire Bus Changes April 2024
[80] would you like your own LIVE train station departure board?
[56] Return of the BRUTE?
[46] If not HS2 to Manchester, how will traffic be carried?
[43] Infrastructure problems in Thames Valley causing disruption el...
[34] Reversing Beeching - bring heritage and freight lines into the...
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Poll
Question: How will Exeter's first train under electric power reach there?  (Voting closed: July 06, 2020, 08:02:57)
25kv overhead from London - 11 (24.4%)
25kv overhead Devon Metro (local network) - 1 (2.2%)
Third Rail from Waterloo - 2 (4.4%)
Some other way - 0 (0%)
Won't happen within 15 years - 31 (68.9%)
Total Voters: 44

Pages: 1 [2] 3 4 5
  Print  
Author Topic: Electric trains to Exeter? How do you see it happening?  (Read 17346 times)
PhilWakely
Transport Scholar
Hero Member
******
Posts: 2007



View Profile
« Reply #15 on: June 28, 2020, 11:43:02 »

Having lived in Pinhoe for all bar three years of my life, I have used every available opportunity to push for improvements on the Mule. I even used my S' Level Statistics and Degree in Statistics to produce projects on re-doubling the line or using better powered locomotives to improve timing! Call my a cynic if you will, but HS2 (The next High Speed line(s)) will be fully operational to Birmingham before we'll see any major improvements to the Mule. Yes, we may well see a Tisbury-style loop just east of Whimple to enable the Devon Metro to improve local services, but, unless something major causes significant, long-lasting disruption between Exeter and Castle Cary, I cannot see anything else being done to the Mule in the foreseeable future. It is likely that the Tories will promise something to their voters in 2023, but these will be quickly forgotten.
Logged
rogerpatenall
Hero Member
*****
Posts: 321



View Profile
« Reply #16 on: June 28, 2020, 16:32:13 »

Well. I have ticked the not in 15 years box. However, you can argue that electric trains are already running to Exeter. Perhaps the thread should have been headed 'Electric traction to Exeter'?
Logged
JontyMort
Hero Member
*****
Posts: 342


View Profile
« Reply #17 on: June 28, 2020, 20:59:30 »

Well. I have ticked the not in 15 years box. However, you can argue that electric trains are already running to Exeter. Perhaps the thread should have been headed 'Electric traction to Exeter'?

But even that won’t work - the traction is electric in both modes.
Logged
grahame
Administrator
Hero Member
*****
Posts: 40690



View Profile WWW Email
« Reply #18 on: June 28, 2020, 21:12:34 »

Looks like I have "goofed" on the description ... and thinking about it, my first visit to Exeter by train must have been some 50 years ago ... electric traction all the way from Brighton, with the train having its own diesel generators carriages 1, 6, 7 and 12 and borrowed for the Saturday Only service off the Hastings to Cannon Street Monday to Friday trains.
Logged

Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
Electric train
Transport Scholar
Hero Member
******
Posts: 4355


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #19 on: June 29, 2020, 07:21:13 »

Here is the ORR» (Office of Rail and Road formerly Office of Rail Regulation - about) position on 3rd rail extension.
It places the onus of safety with the organisation promoting the extension. It specifically mentions the time taken for isolations but NR» (Network Rail - home page) South East and presumably Wessex are installing modular isolation systems that make it both safer and quicker.

https://orr.gov.uk/__data/assets/pdf_file/0017/17621/dc-electrification-policy-statement.pdf

NR Southern Region (formally Wessex Route and SE Route) are installing a system remotely controlled "Negative Shorting Circuiting Devices" (NSCD) these avoid the need for staff to go on to the track to test and the apply manual straps.  The NSCD are not currently operated by the ECRs but by a facility near the work sites.

The NSCD do make it safer for the isolation staff and does speed the process up.


I would not put forward the idea of wholesale additions to the 3rd Rail network but infills such as Oxted and the North Downs line need to be considered. The other outpost, Ashford to Hastings, would be better done at 25kV so that it could be served from HS1 (High Speed line 1 - St Pancras to Channel Tunnel) at Ashford.

Ashford - Hastings electrification at 25kV has more or less been ruled out, due to some significant engineering challenges -

Currently there is no direct track connection from the Hasting line to HS1
The OLE (Overhead Line Equipment, more often "OHLE") wiring across Ashford from the SE side to NE side
The A/C - DC (Direct Current) interface at Ore

Options being looked at are bi-mode battery / Third Rail, if the above could be funded / overcome then the 395 could operate the Hastings / London services
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
4064ReadingAbbey
Hero Member
*****
Posts: 455


View Profile
« Reply #20 on: July 01, 2020, 14:50:31 »

The much mentioned - by Network Rail anyway - rolling programme of 25kV electrification must proceed. The first fairly immediate step on the B&H (Berks and Hants - railway line from Reading to Taunton via Westbury) should be wiring to Bedwyn, so the IET (Intercity Express Train)'s can be replaced by 387's. Follow that with electrification in stages to Westbury (new electric service to include the projected Devizes Parkway station), Taunton & Exeter.

The electrification project teams have enough recent practice, particularly in terms of what not to do, on this route to complete the work in 5-7 years.

(At the same time perhaps the DfT» (Department for Transport - about) & NR» (Network Rail - home page) would care to remove their collective head from the orifice in which it currently resides and authorise full completion of the wiring on the routes to BRI» (Bristol Temple Meads - next trains).)
I would suggest that replacing IETs by Class 387s on the Bedwyns would affect line capacity between Paddington and Reading. The 387s have a 110mph top speed rather than the 125mph of practically every other train using the Mains between Paddington and Reading and this will affect pathing and line capacity. In the 2019 timetable trains are scheduled to leave Paddington and two minute headways, with the maximum being five minutes there being, IIRC (if I recall/remember/read correctly), some 16 departures per hour. Introducing even slightly slower trains on this stretch, even if there is only one per hour, will affect punctuality.

I can't see it happening.
Logged
eightf48544
Transport Scholar
Hero Member
******
Posts: 4574


View Profile Email
« Reply #21 on: July 01, 2020, 15:04:02 »

If Bedwyn/Westbury  is electrified then IETs (Intercity Express Train) could still be used on the services
Logged
southwest
Guest
« Reply #22 on: July 01, 2020, 23:51:11 »

The much mentioned - by Network Rail anyway - rolling programme of 25kV electrification must proceed. The first fairly immediate step on the B&H (Berks and Hants - railway line from Reading to Taunton via Westbury) should be wiring to Bedwyn, so the IET (Intercity Express Train)'s can be replaced by 387's. Follow that with electrification in stages to Westbury (new electric service to include the projected Devizes Parkway station), Taunton & Exeter.

The electrification project teams have enough recent practice, particularly in terms of what not to do, on this route to complete the work in 5-7 years.

(At the same time perhaps the DfT» (Department for Transport - about) & NR» (Network Rail - home page) would care to remove their collective head from the orifice in which it currently resides and authorise full completion of the wiring on the routes to BRI» (Bristol Temple Meads - next trains).)
I would suggest that replacing IETs by Class 387s on the Bedwyns would affect line capacity between Paddington and Reading. The 387s have a 110mph top speed rather than the 125mph of practically every other train using the Mains between Paddington and Reading and this will affect pathing and line capacity. In the 2019 timetable trains are scheduled to leave Paddington and two minute headways, with the maximum being five minutes there being, IIRC (if I recall/remember/read correctly), some 16 departures per hour. Introducing even slightly slower trains on this stretch, even if there is only one per hour, will affect punctuality.

I can't see it happening.

Extend the Reading to Newbury stopper, then replace the Paddington - Bedwyn stopper with more Exeter/Taunton/Westbury trains.
Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4355


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #23 on: July 02, 2020, 07:06:07 »

The much mentioned - by Network Rail anyway - rolling programme of 25kV electrification must proceed. The first fairly immediate step on the B&H (Berks and Hants - railway line from Reading to Taunton via Westbury) should be wiring to Bedwyn, so the IET (Intercity Express Train)'s can be replaced by 387's. Follow that with electrification in stages to Westbury (new electric service to include the projected Devizes Parkway station), Taunton & Exeter.

The electrification project teams have enough recent practice, particularly in terms of what not to do, on this route to complete the work in 5-7 years.

(At the same time perhaps the DfT» (Department for Transport - about) & NR» (Network Rail - home page) would care to remove their collective head from the orifice in which it currently resides and authorise full completion of the wiring on the routes to BRI» (Bristol Temple Meads - next trains).)
I would suggest that replacing IETs by Class 387s on the Bedwyns would affect line capacity between Paddington and Reading. The 387s have a 110mph top speed rather than the 125mph of practically every other train using the Mains between Paddington and Reading and this will affect pathing and line capacity. In the 2019 timetable trains are scheduled to leave Paddington and two minute headways, with the maximum being five minutes there being, IIRC (if I recall/remember/read correctly), some 16 departures per hour. Introducing even slightly slower trains on this stretch, even if there is only one per hour, will affect punctuality.

I can't see it happening.

Mixing 387 and 800 in a service pattern is all about flighting, putting a 387 on fast with a 800 on a Slough stopper flighted together lowers the impact.  Also the difference in acceleration and braking between the two is not big as it was between 165/6 and 253/4

Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
grahame
Administrator
Hero Member
*****
Posts: 40690



View Profile WWW Email
« Reply #24 on: July 06, 2020, 08:46:29 »

Poll closed

25kv overhead from London   - 11 (24.4%)
25kv overhead Devon Metro (local network)   - 1 (2.2%)
Third Rail from Waterloo   - 2 (4.4%)
Some other way   - 0 (0%)
Won't happen within 15 years   - 31 (68.9%)

So - let me see. 

If you asked to place a bet (hypothetical - I am not licensed nor interested) on there being trains running in and out of an Exeter Station under electric power by July 2035, I could offer you odds:
7/1 for overhead catenary 25kv from London
40/1 for third rail electric from London
80/1 for their being local 25kv electric services only
200/1 for there being something else

Sadly, if you wanted to bet on there being no electric trains (although of course internal transmission could be by way of electricity from diesel, hydrogen, nuclear, battery, steam generator, or passenger pedal sources) I could only offer odds of 5/2 on - returning each £1 stake and paying you just 40p winnings.
« Last Edit: July 06, 2020, 13:03:21 by grahame » Logged

Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
stuving
Transport Scholar
Hero Member
******
Posts: 7156


View Profile
« Reply #25 on: July 06, 2020, 18:22:00 »

I wonder if this would be the answer - or at least the first answer likely to happen, though the timescale of any retrofit programme is not clear from this press release from Hitachi Rail:
Quote
Press release - 06 July 2020 07:30
Hitachi Rail and Hyperdrive agreement opens way for battery trains across Britain

Hitachi Rail and Hyperdrive agreement opens way for battery trains across Britain

Hitachi Rail and Hyperdrive Innovation have signed an exclusive agreement to develop battery packs to power zero-emission trains and create a battery hub in the North East.

The two North East manufacturers will now accelerate the creation of batteries that can be mass-produced to provide emission-free power for hundreds of battery trains across the UK (United Kingdom).

With almost two-thirds (58%) of the UK’s 20,000 mile rail network not electrified and with the Government setting ambitious decarbonisation targets, Hitachi Rail analysis estimates the potential market for Hyperdrive and Hitachi’s battery technology is over 400 trains.

This agreement is an important step towards manufacturing batteries at Hyperdrive’s HYVE facility in Sunderland, and then installing them just 20 miles away at Hitachi Rail’s train-building factory in Newton Aycliffe, County Durham.

Hitachi has identified its fleets of 275 trains as potential early recipients of the batteries for use in the UK, as well as installing them on new metro and intercity trains that will be needed in the coming years to replace ageing diesel fleets.

Battery trains produce no greenhouse gases, air pollution and are a far quieter, offering passengers cleaner air in stations, less noise disruption and a carbon-free way to travel. Installing batteries on to existing fleets can also extend their range and allow passengers to reach stations on non-electrified branch lines without having to change train.

A widespread adoption of battery train technology could be a major boost for industry in the UK, creating a market for Hyperdrive to increase its manufacturing capability up to 30,000 battery packs per year and double the number of jobs at its Sunderland factory.

Development of the UK’s first independent battery pack manufacturing facility will drive costs down and for the first time offer domestic production of batteries for rail, automotive, construction and energy sectors.
« Last Edit: July 06, 2020, 22:08:35 by stuving » Logged
Bmblbzzz
Transport Scholar
Hero Member
******
Posts: 4256


View Profile
« Reply #26 on: July 06, 2020, 18:47:54 »

This has high potential!  Wink

Although they're going to need more than 50km range if they're going to be used on most of the network. Interesting though to see the competition between this, hydrogen, bi-mode, OHLE and possibly third-rail.
Logged

Waiting at Pilning for the midnight sleeper to Prague.
GBM
Transport Scholar
Hero Member
******
Posts: 1468


View Profile Email
« Reply #27 on: July 07, 2020, 08:44:39 »

Does member Broadgage have shares in this!  Grin Grin Grin
Logged

Personal opinion only.  Writings not representative of any union, collective, management or employer. (Think that absolves me...........)
johnneyw
Transport Scholar
Hero Member
******
Posts: 2257


From station to station, back to Bristol city....


View Profile
« Reply #28 on: July 07, 2020, 10:25:14 »

It sounds like Hitachi and Co have come to the conclusion that Vivarail came to a few years ago.
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7156


View Profile
« Reply #29 on: July 07, 2020, 16:01:56 »

It sounds like Hitachi and Co have come to the conclusion that Vivarail came to a few years ago.

The announcement was of just one commercial step in a long development process at Hitachi, looking at putting batteries in trains. Downpage it includes:
Quote
Hitachi has extensive battery train experience across the world. In 2016, Hitachi introduced one of the world’s first regional battery trains in Japan. The Dencha currently carries passengers on two routes in Japan, with a wire-free range of 50km.

In 2007, Hitachi Rail fitted a hybrid test train – known as a Class 43 HST (High Speed Train) – with batteries and ran over 100,000 km. The ‘Haybusa’ train produced no emissions out of stations and provided a 15% fuel saving.

And that experimental hybrid train in 2007 is described in this from Railway Gazette - you may recognise it as something else, though:


I guess the results of that didn't support the hybrid option for IEP (Intercity Express Program / Project.) (and hybrids have never offered much in trains anyway), but now batteries have moved on far enough make it worth planning their use as a primary power source, at least for shorter ranges..
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 [2] 3 4 5
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page