Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 19:15 28 Mar 2024
* Easter getaways hit by travel disruption
- How do I renew my UK passport and what is the 10-year rule?
- Passengers pleaded with knifeman during attack
- Family anger at sentence on fatal crash driver, 19
- Easter travel warning as millions set to hit roads
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
28th Mar (1988)
Woman found murdered on Orpington to London train (*)

Train RunningCancelled
17:48 Reading to Gatwick Airport
17:54 Cardiff Central to London Paddington
17:57 London Paddington to Worcester Foregate Street
18:03 London Paddington to Penzance
18:08 London Paddington to Frome
Additional 18:25 Shalford to Reading
18:36 London Paddington to Plymouth
18:37 Westbury to Swindon
18:55 Bedwyn to Newbury
19:23 Reading to Gatwick Airport
19:24 Newbury to Bedwyn
19:33 London Paddington to Worcester Shrub Hill
19:55 Bedwyn to Newbury
20:13 Swindon to Westbury
20:16 Frome to Westbury
20:49 Newbury to Bedwyn
20:56 Worcester Foregate Street to London Paddington
21:16 Bedwyn to Newbury
21:53 Newbury to Bedwyn
22:25 Bedwyn to Newbury
22:47 Newbury to Bedwyn
Short Run
15:03 London Paddington to Penzance
16:19 Carmarthen to London Paddington
16:23 Portsmouth Harbour to Cardiff Central
16:35 London Paddington to Plymouth
16:50 Plymouth to London Paddington
17:03 London Paddington to Penzance
17:30 London Paddington to Taunton
17:36 London Paddington to Plymouth
17:50 Gloucester to Salisbury
17:59 Gatwick Airport to Reading
18:19 Reading to Gatwick Airport
18:29 Gatwick Airport to Reading
18:54 Reading to Gatwick Airport
18:59 Gatwick Airport to Reading
19:04 Paignton to London Paddington
19:06 London Paddington to Bedwyn
19:13 Salisbury to Bristol Temple Meads
19:29 Gatwick Airport to Reading
20:03 London Paddington to Plymouth
20:42 Bedwyn to London Paddington
21:04 London Paddington to Plymouth
Delayed
13:59 Cardiff Central to Penzance
14:15 Penzance to London Paddington
16:03 London Paddington to Penzance
16:15 Penzance to London Paddington
Additional 17:17 Exeter St Davids to Penzance
Additional 17:26 Castle Cary to Penzance
An additional train service has been planned to operate as shown 18:25 Shalford to Reading
19:04 London Paddington to Plymouth
19:59 Gatwick Airport to Reading
etc
PollsOpen and recent polls
Closed 2024-03-25 Easter Escape - to where?
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
March 28, 2024, 19:24:20 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[133] West Wiltshire Bus Changes April 2024
[132] would you like your own LIVE train station departure board?
[53] Return of the BRUTE?
[44] If not HS2 to Manchester, how will traffic be carried?
[41] Infrastructure problems in Thames Valley causing disruption el...
[32] Reversing Beeching - bring heritage and freight lines into the...
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Poll
Question: How will Exeter's first train under electric power reach there?  (Voting closed: July 06, 2020, 08:02:57)
25kv overhead from London - 11 (24.4%)
25kv overhead Devon Metro (local network) - 1 (2.2%)
Third Rail from Waterloo - 2 (4.4%)
Some other way - 0 (0%)
Won't happen within 15 years - 31 (68.9%)
Total Voters: 44

Pages: 1 ... 3 4 [5]
  Print  
Author Topic: Electric trains to Exeter? How do you see it happening?  (Read 17347 times)
Electric train
Transport Scholar
Hero Member
******
Posts: 4355


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #60 on: December 17, 2020, 07:10:44 »

A bit complex and techie to explain in a post here, sufficed to say lessons have been learned from the engineering of GWEP (Great Western Electrification Program)

Lets hope the teams get the chance to stay together to use that learning rather than have a gap then have to learn it all over again. 

That is certainly part of the message Andrew Haines is sending to the DfT» (Department for Transport - about), the forming a new electrification construction team from scratch after a few years break will add costs and delays as it did with GWEP
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
TonyK
Global Moderator
Hero Member
*****
Posts: 6435


The artist formerly known as Four Track, Now!


View Profile
« Reply #61 on: December 17, 2020, 09:31:02 »


That is certainly part of the message Andrew Haines is sending to the DfT» (Department for Transport - about), the forming a new electrification construction team from scratch after a few years break will add costs and delays as it did with GWEP (Great Western Electrification Program)

It would make perfect sense to keep a permanent team, or teams, with all the kit in full working order, to do a rolling national programme of electrification. Suddenly. most of the cost becomes part of the routine budget, and slowly but surely, we have an electric railway.
Logged

Now, please!
Bmblbzzz
Transport Scholar
Hero Member
******
Posts: 4256


View Profile
« Reply #62 on: December 17, 2020, 10:33:29 »

I wonder if this would be the answer - or at least the first answer likely to happen, though the timescale of any retrofit programme is not clear from this press release from Hitachi Rail:
Quote
Press release - 06 July 2020 07:30
Hitachi Rail and Hyperdrive agreement opens way for battery trains across Britain

Hitachi Rail and Hyperdrive agreement opens way for battery trains across Britain

Hitachi Rail and Hyperdrive Innovation have signed an exclusive agreement to develop battery packs to power zero-emission trains and create a battery hub in the North East.
...

Following on from that announcement earlier this year, Hitachi are now going to put some batteries into some of GWR (Great Western Railway)'s 802s. This was behind this morning's news items, based on this press release from Hitachi:
Quote
Hitachi and Eversholt Rail to develop GWR intercity battery hybrid train ? offering fuel savings of more than 20%
 
  •   Batteries replacing an engine to cut fuel usage and reduce carbon emissions
  •   First time a modern UK (United Kingdom) intercity train, in passenger service, will use alternative fuel
  •   Tri-mode train can improve air quality and reduce noise across South West route?s non-electrified stations

In a UK-first, Hitachi Rail and Eversholt Rail have signed an exclusive agreement aimed at bringing battery power ? and fuel savings of more than 20% ? to the modern Great Western Railway Intercity Express Trains that carry passengers between Penzance and London.

The 36 longer, faster trains ? with their iconic sleek design ? have already transformed journeys for passengers in south west England, since their introduction by GWR in August 2018. Now the partnership between Hitachi, the train builder and maintainer, and Eversholt Rail, the trains? owner, will develop a plan to install batteries on a modern Intercity Express Train. The trial will demonstrate that the innovation meets passenger service and safety standards.

The line between the South West and London is only partially electrified, with the majority of the 300 mile journey requiring diesel power. The partnership is looking at batteries replacing a diesel engine as a power source on an existing Hitachi-built five-carriage train ? currently known as a bi-mode for its ability to switch seamlessly between electric and diesel power.

Adding a battery creates an electric-diesel-battery hybrid train (tri-mode). On non-electrified sections of the route, the batteries will supplement the power of the engines to reduce fuel usage and carbon emissions by more than 20%. Whereas when travelling in and out of stations and surrounding urban areas, the train would rely on battery power only. This has the benefit of improving air quality and dramatically reduce noise levels, creating a more pleasant environment for passengers and people living nearby.

GWR?s Intercity Express Train fleet currently calls at 15 non-electrified stations on its journey between Penzance and London, all of which could benefit from trains running on battery-only power.

Hitachi Rail will draw upon market-leading expertise in Japan, and the support of its battery partner ? Hyperdrive Innovation. The two North East-based companies reached an agreement in July 2020 to create and develop battery packs for mass production at Hyperdrive?s HYVE facility in Sunderland, the UK?s first independent battery pack manufacturing facility.

The projected improvements in battery technology ? particularly in power output and charge ? create opportunities to replace incrementally more diesel engines on long distance trains. With the ambition to create a fully electric-battery intercity train ? that can travel the full journey between London and Penzance ? by the late 2040s, in line with the UK?s 2050 net zero emissions target.

Installing battery technology on trains can complement electrification and helps to improve the business case for upgrades that can level-up the South West and provide a low emission alternative to domestic air travel.

That reads as if they plan to do a trial, though perhaps even that depends on a bit of prior work on the batteries.
Just wondering on the technical details. They plan to replace one of the under-floor diesel engines with batteries. I presume that each diesel engine only powers the motors in that carriage. But obviously when the train is running on OLE (Overhead Line Equipment, more often "OHLE"), all motors are powered from the same transformer. So is power in fact shared between driven carriages when running in diesel, and therefore presumably also diesel-battery, mode too?
Logged

Waiting at Pilning for the midnight sleeper to Prague.
stuving
Transport Scholar
Hero Member
******
Posts: 7156


View Profile
« Reply #63 on: December 17, 2020, 10:52:06 »

Just wondering on the technical details. They plan to replace one of the under-floor diesel engines with batteries. I presume that each diesel engine only powers the motors in that carriage. But obviously when the train is running on OLE (Overhead Line Equipment, more often "OHLE"), all motors are powered from the same transformer. So is power in fact shared between driven carriages when running in diesel, and therefore presumably also diesel-battery, mode too?

I have been wondering that too. I've not found a clear statement on the matter, though.

I have read of a "3 kV DC (Direct Current) bus", taking power from the transformers via AC/DC converters. However, looking at the cables between vehicles, that's not a bus in the normal sense. It must be implemented as relatively low-power links (ca. 600 W), each from one of the two (5-car) or three (9-car) transformers to a motor drive unit.

When running on diesel power, each engine feeds its own motor drive units. If any engines are not running, that will reduce the adhesion significantly, so a way of feeding some power between motor vehicles would make sense. With a true busbar, that would be the obvious thing to do, but with separate links I think you'd have to reconfigure them by switching. I think it's possible, but you'd need to be told - no way to work it out by looking.
Logged
broadgage
Transport Scholar
Hero Member
******
Posts: 5398



View Profile
« Reply #64 on: December 17, 2020, 23:33:02 »


That is certainly part of the message Andrew Haines is sending to the DfT» (Department for Transport - about), the forming a new electrification construction team from scratch after a few years break will add costs and delays as it did with GWEP (Great Western Electrification Program)

It would make perfect sense to keep a permanent team, or teams, with all the kit in full working order, to do a rolling national programme of electrification. Suddenly. most of the cost becomes part of the routine budget, and slowly but surely, we have an electric railway.

Agree, a steady rolling programe of electrification is IMHO (in my humble opinion) the way forward. Hopefully the work would become quicker, cheaper, or better in other ways.
Priority should be given to the most heavily used routes, and to shorter lines that connect therewith.
Logged

A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard.
It has space for cycles, surfboards,luggage etc.
A 5 car DMU (Diesel Multiple Unit) is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
Electric train
Transport Scholar
Hero Member
******
Posts: 4355


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #65 on: December 18, 2020, 07:25:09 »

Just wondering on the technical details. They plan to replace one of the under-floor diesel engines with batteries. I presume that each diesel engine only powers the motors in that carriage. But obviously when the train is running on OLE (Overhead Line Equipment, more often "OHLE"), all motors are powered from the same transformer. So is power in fact shared between driven carriages when running in diesel, and therefore presumably also diesel-battery, mode too?

I have been wondering that too. I've not found a clear statement on the matter, though.

I have read of a "3 kV DC (Direct Current) bus", taking power from the transformers via AC/DC converters. However, looking at the cables between vehicles, that's not a bus in the normal sense. It must be implemented as relatively low-power links (ca. 600 W), each from one of the two (5-car) or three (9-car) transformers to a motor drive unit.

When running on diesel power, each engine feeds its own motor drive units. If any engines are not running, that will reduce the adhesion significantly, so a way of feeding some power between motor vehicles would make sense. With a true busbar, that would be the obvious thing to do, but with separate links I think you'd have to reconfigure them by switching. I think it's possible, but you'd need to be told - no way to work it out by looking.

Electrical power "bus" on rolling stock is quite common.  For example Class 800 have 25kV bus along the entire unit, Class 700 have two 400V 3 phase bus one for each half of the train with a bus coupler to join the 2 if required.

A common 3kV dc bus is possible, its likely to be a common feature on some European trains, the prime mover (diesel or hydrogen) would generate at a standard 3 ph 400V feeding into the power bus via switch mode power supply and onto the power bus; traction power, battery charging and domestic power can be tapped off of the power bus via inverters
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
stuving
Transport Scholar
Hero Member
******
Posts: 7156


View Profile
« Reply #66 on: December 18, 2020, 10:39:14 »

Electrical power "bus" on rolling stock is quite common.  For example Class 800 have 25kV bus along the entire unit, Class 700 have two 400V 3 phase bus one for each half of the train with a bus coupler to join the 2 if required.

A common 3kV dc bus is possible, its likely to be a common feature on some European trains, the prime mover (diesel or hydrogen) would generate at a standard 3 ph 400V feeding into the power bus via switch mode power supply and onto the power bus; traction power, battery charging and domestic power can be tapped off of the power bus via inverters

What I have found out about 800/802s, from Hitachi or other reliable sources, is:
  • There is a fixed link - bus of you prefer - at 25 kV from the two pantographs (only one of which will be up) to the two or three transformers. Presumbaly there's VCB (Vacuum Circuit Breaker - electrification) for each transformer.
  • The alternators are rated at 700 kW/1900 rpm/1950 V/214 A.
  • The big cables (single conductors) between body ends are marked 1800/3000V-150mm2. And there are lots of them at the ends of the unit, fewer as you go inwards. 
  • I can't see the cables would be paralleled, especially given the number of joints in them. Hence the idea that they feed point-point between modules on vehicles. Power could be fed at either 1800V AC or 3000 V DC (Direct Current), given the information above.
  • One Hitachi diagram I'm not convinced by - it may be a non-technical illustration, since done for a semi-technical article in Hitachi Review. It shows each motor vehicle with an auxiliary power (240 kVA)/battery charger unit feeding a 400V 3-phase bus, and a combined drive for four motors (226 kW continuous each), which sounds OK. It also shows the alternator feeding the same converter as the 25 kV transformer, which implies that the feed between vehicles is at ca. 2 kV AC.
  • The fix (or half of it) for the EMI problem on the ECML (East Coast Main Line) (not the axle counter one) was to add inductance. Roger Ford describes this as "between the transformer and the traction converter under each Driving Pantograph Transformer cars". That implies there is a converter on each DPT (which in turn implies one on the TPS too), but then again it could refer to the converters being on the MEx vehicles.
  • So there's still a question about the power flow topology that's "not proven".
  • None of this relates to 801s, on which one GU has to move the whole train. Whatever its power, it has to feed all motors to get full adhesion, so links have to exist to support that.
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10095


View Profile
« Reply #67 on: May 24, 2021, 13:24:37 »

I was reading an article about the development of aluminium-ion batteries (which I'd never heard of previously).  It appears they have many advantages over lithium-ion ones.

This was the article:

https://www.forbes.com/sites/michaeltaylor/2021/05/13/ev-range-breakthrough-as-new-aluminum-ion-battery-charges-60-times-faster-than-lithium-ion/?sh=2bf34746d287

Do our experts on batteries here on the forum think that they have the potential to become game changers in terms of trains, as the author of the article suggests they will be for cars?
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
ellendune
Transport Scholar
Hero Member
******
Posts: 4452


View Profile
« Reply #68 on: May 24, 2021, 14:21:55 »

I was reading an article about the development of aluminium-ion batteries (which I'd never heard of previously).  It appears they have many advantages over lithium-ion ones.

This was the article:

https://www.forbes.com/sites/michaeltaylor/2021/05/13/ev-range-breakthrough-as-new-aluminum-ion-battery-charges-60-times-faster-than-lithium-ion/?sh=2bf34746d287

Do our experts on batteries here on the forum think that they have the potential to become game changers in terms of trains, as the author of the article suggests they will be for cars?

It certainly looks a game changer on several counts:

  • it does not use 'exotic metals' such as lithium (bad news for Cornwall?) as it uses commonly occurring materials (aluminium, carbon and urea)
  • it reduces the weight of the battery considerably
  • it can be charged in much less time

However, the article does not have any information on the efficiency. 
Logged
broadgage
Transport Scholar
Hero Member
******
Posts: 5398



View Profile
« Reply #69 on: May 24, 2021, 16:42:09 »

I am a bit doubtful for two reasons.

Firstly, lithium is more reactive than aluminium and therefore seems likely to have a higher energy density.

Secondly, the claimed much faster charging seems most unlikely in practice due to power availability limits. The larger electric cars have batteries of about 40 Kwh.
These can be slow charged in a day or so from a domestic 13 amp socket, or fast charged from a domestic 32 amp circuit overnight, or very fast charged in much less than hour at some charge points.
Fast charging can use as much as 350 Kw. Faster than that seems unlikely in most cases due to the cost of providing the power.

Moving on to trains, a battery capacity of 1 Mwh has been suggested as a "ball park" figure for a basic battery train. That can be fast charged from existing OHLE in an hour or so, or charged overnight from a 3 phase 415 volt supply.
Charging ten times faster implies a power input of 10 Mw which is beyond the capacity of most existing or likely future OHLE.

And remember that a larger or higher specification battery train might have a battery of SEVERAL Mwh capacity, and that one might need to charge several at the same time.

Battery trains are in my view not optimum for fast or long distance use. More suitable for the Minehead branch and other similar locations, or for short sections of main lines that are problematic to electrify such as Dawlish.
Logged

A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard.
It has space for cycles, surfboards,luggage etc.
A 5 car DMU (Diesel Multiple Unit) is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
Electric train
Transport Scholar
Hero Member
******
Posts: 4355


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #70 on: May 25, 2021, 06:56:00 »

I was reading an article about the development of aluminium-ion batteries (which I'd never heard of previously).  It appears they have many advantages over lithium-ion ones.

This was the article:

https://www.forbes.com/sites/michaeltaylor/2021/05/13/ev-range-breakthrough-as-new-aluminum-ion-battery-charges-60-times-faster-than-lithium-ion/?sh=2bf34746d287

Do our experts on batteries here on the forum think that they have the potential to become game changers in terms of trains, as the author of the article suggests they will be for cars?

The feasibility work on the proposal to use battery powered trains is the high charge current, an example Ashford - Hastings the charge current at Ashford exceeds the normal traction current and for a longer duration than a pure DC (Direct Current) traction rolling stock.   The duty cycle for traction supplies allow for short duration peak loads with rest time between, battery charging has a high current for a prolonged time especially at a turn around station.

Work is on going to how best to adopt battery powered trains
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
stuving
Transport Scholar
Hero Member
******
Posts: 7156


View Profile
« Reply #71 on: December 22, 2022, 00:15:56 »

What's that bimode/hybrid train been up to? I've not heard anything for ages. And then up pops this Italian example of much the same idea, but as a fleet coming into service. From E&T:
Quote
Sicily is introducing a new, Hitachi-built hybrid train that can run electrically, on battery or on diesel depending on which part of the network it is travelling on.

Hitachi Rail said the new ‘Blues’ train, which is the first of its type to enter passenger service in Europe, could reduce carbon dioxide emissions and fuel consumption by up to 50 per cent when compared to traditional trains.

The train is ready to begin passenger service following its international presentation at rail expo Innotrans last September in Berlin.

The Blues is equipped with a new generation of hybrid technology: the train can travel with diesel engines on non-electrified lines, with pantographs on electrified lines, and with batteries, where applicable, to travel the last mile on non-electrified lines or while stopping at stations, avoiding the use of fuel.

Batteries also help to further improve normal power performance. Switching off the engines during the arrival, parking and departure from stations allows a 50 per cent reduction in fuel consumption and CO2 emissions compared to current diesel trains as well as helping to reduce noise pollution, Hitachi said.

The Blues train is also equipped with an air-conditioning system designed to optimise power consumption based on the actual number of passengers on board. Other on-board technologies designed to minimise energy consumption include internal and external LED lighting systems and the use of smart parking.

It also includes USB and 220V power sockets for greater connectivity, as well as bike areas and high luggage transport capacity.

Here's a bit more from Hitachi:
Quote
Blues Commuter

The "Blues" trains derive from the Masaccio platform and are equipped with diesel-electric propulsion integrated with batteries that make the train a hybrid-bimodal solution, that can also run without electrification.

These new vehicles are record-breaking in terms of performance and sustainability as they are equipped with new-generation and low-emission diesel engines (Stage V) integrated with batteries allowing emission and noise reduction.

The trains can run up to 160 km/h on electrified lines with great travel time savings.

On-board technologies include: smart air-conditioning systems capable of adapting to internal conditions such as temperature and the number of passengers on board, LED systems that contribute to save energy, video surveillance for improved safety of passengers, WiFi connection, electric and USB plugs and space for bikes and baggage.

A dedicated area and toilet are available for people with reduced mobility who can also benefit from enhanced ease of access.

No sign there that is has any common history or design with the Hyperdrive one.

Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 3 4 [5]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page