grahame
|
|
« Reply #225 on: November 01, 2024, 18:54:21 » |
|
It looks like the Filton shuttle has return today.
Here's an example: 166220 ... arrived at Filton Abbey Wood at 12:26 as 2H62 ... ran as 5H63 to Bristol Parkway, platform 4 ... coninued as 5H63 at 12:48 to Filtom Abbey Wood, arriving 12:52 ... formed 2H63, the 12:54 to Bristol Temple Meads I think I have mis-understood something then. I believed that the reason the stopper up Filton Bank terminated rather oddly at Abbey Wood, one station before it would provide connections to London, Swansea, Birmingham and beyond was because of capacity issues at Bristol Parkway. And yet here it is buzzing in and out empty from platform 4. I am scratching my head and wondering "why". Seated in my armchair on a Friday evening, I have a theory. My theory is that the powers that be know perfectly well that an hourly connection from Lawrence Hill, Stapleton Road and Ashley Down to London, South Wales and the Midlands and north would be very, very popular. However, in their longer term plan they want that train to carry on to Henbury and if they let it go in passenger service to Bristol Parkway, they're going to build up a thriving customer base they're not planning to serve as well if at all in the future, and they don't want the problem of customers they're not planning to accomodate in the long term. Please tell me I'm wrong.
|
|
|
Logged
|
Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
|
|
|
stuving
|
|
« Reply #226 on: November 01, 2024, 19:45:37 » |
|
It looks like the Filton shuttle has return today.
Here's an example: 166220 ... arrived at Filton Abbey Wood at 12:26 as 2H62 ... ran as 5H63 to Bristol Parkway, platform 4 ... coninued as 5H63 at 12:48 to Filtom Abbey Wood, arriving 12:52 ... formed 2H63, the 12:54 to Bristol Temple Meads I think I have mis-understood something then. I believed that the reason the stopper up Filton Bank terminated rather oddly at Abbey Wood, one station before it would provide connections to London, Swansea, Birmingham and beyond was because of capacity issues at Bristol Parkway. And yet here it is buzzing in and out empty from platform 4. I am scratching my head and wondering "why". Seated in my armchair on a Friday evening, I have a theory. My theory is that the powers that be know perfectly well that an hourly connection from Lawrence Hill, Stapleton Road and Ashley Down to London, South Wales and the Midlands and north would be very, very popular. However, in their longer term plan they want that train to carry on to Henbury and if they let it go in passenger service to Bristol Parkway, they're going to build up a thriving customer base they're not planning to serve as well if at all in the future, and they don't want the problem of customers they're not planning to accomodate in the long term. Please tell me I'm wrong. This is an odd exception - most of these shuttles reverse between the two Relief Line platforms (4 and 3). But the odd thing to note is that they take about 30 minutes to do that, so block one of those lines (to/from Wales) while they do it. Presumably they don't want this one to do that, and it so happens there's a gap allowing it to use the Main Lines and BPW» for this reversal. Note that it can't get to BPW from the Reliefs, and as a general statement it would be more in the way on the Mains than the Reliefs. In fact, today it used P2 both ways, rather than P1 (the Down Main) on its return. But what dictates this timing? Would it get to Henbury and back in 25 minutes?
|
|
|
Logged
|
|
|
|
brooklea
|
|
« Reply #227 on: November 01, 2024, 20:59:38 » |
|
It looks like the Filton shuttle has return today.
Back now the engineering works between Bath and Westbury are finished. Here's an example: 166220 ... arrived at Filton Abbey Wood at 12:26 as 2H62 ... ran as 5H63 to Bristol Parkway, platform 4 ... coninued as 5H63 at 12:48 to Filtom Abbey Wood, arriving 12:52 ... formed 2H63, the 12:54 to Bristol Temple Meads
I think I have mis-understood something then. I believed that the reason the stopper up Filton Bank terminated rather oddly at Abbey Wood, one station before it would provide connections to London, Swansea, Birmingham and beyond was because of capacity issues at Bristol Parkway. And yet here it is buzzing in and out empty from platform 4.
This is an odd exception - most of these shuttles reverse between the two Relief Line platforms (4 and 3). But the odd thing to note is that they take about 30 minutes to do that, so block one of those lines (to/from Wales) while they do it. Presumably they don't want this one to do that, and it so happens there's a gap allowing it to use the Main Lines and BPW» for this reversal. Note that it can't get to BPW from the Reliefs, and as a general statement it would be more in the way on the Mains than the Reliefs. In fact, today it used P2 both ways, rather than P1 (the Down Main) on its return. But what dictates this timing? Would it get to Henbury and back in 25 minutes? The empty stock moves at Filton from Platform 4 to 3 run onto the freight line towards Avonmouth, so they don’t block the main lines to or from Wales. The example noted by grahame runs to Bristol Parkway so as not to be in the way of Westbury to Avonmouth freight train which is due to pass through Filton Abbey Wood at 12:53 1/2, heading onto the line which the shuttle trains generally wait time on. If I remember correctly, the capacity issues were linked with the proposed “Superfast” Bristol to London services which would have run half hourly up and down Filton Bank in order to give Bristol Temple Meads four trains an hour to London Paddington. Obviously they fell by the wayside... Henbury station will be no more than three miles on from the junction at Filton, so 25 minutes should be ample time for that journey.
|
|
|
Logged
|
|
|
|
grahame
|
|
« Reply #228 on: November 02, 2024, 06:57:20 » |
|
The empty stock moves at Filton from Platform 4 to 3 run onto the freight line towards Avonmouth, so they don’t block the main lines to or from Wales.
The example noted by grahame runs to Bristol Parkway so as not to be in the way of Westbury to Avonmouth freight train which is due to pass through Filton Abbey Wood at 12:53 1/2, heading onto the line which the shuttle trains generally wait time on. If I remember correctly, the capacity issues were linked with the proposed “Superfast” Bristol to London services which would have run half hourly up and down Filton Bank in order to give Bristol Temple Meads four trains an hour to London Paddington. Obviously they fell by the wayside...
Henbury station will be no more than three miles on from the junction at Filton, so 25 minutes should be ample time for that journey.
I took a sample of one train - didn't spend time looking through at each hourly train on what I looked to be a pattern, and I happened to find one that does not fit the pattern. Still a lesson in there? Yes, I think so. 166220 proved that it's totally possible for the Filton terminator to run on to Bristol Parkway, have a generous but not excessive pause there in a platform, and run back to Filton to form the next southbound. The explanation of why this is not regularly done - to allow paths for the super fasts - is now historic. Those trains are not running and I don't think they're expected to. So that excuse for stopping one station short of the major interchanges no longer holds. Which brings it back to my suggestion that "we don't want to encourage these customers / this traffic flow by providing services". It could be because they know they would build up a vibrant set of users without a plan to keep those customers served if and when Henbury opens.
|
|
|
Logged
|
Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
|
|
|
brooklea
|
|
« Reply #229 on: November 02, 2024, 09:05:38 » |
|
Perhaps the xx:08 from Temple Meads to Gloucester should just leave at xx:04 and call at all stations up the Filton Bank? Job done.
In the opposite direction it probably wouldn’t work so neatly to do the same with the train from Gloucester that leaves Parkway at xx:46, because that already has a tight turnaround at Temple Meads. Putting extra stops into the xx:16 from Parkway (the train from Worcester) might work.
“They”, the “Powers that be”, whoever “they” are might not like that idea either, but it’s a thought.
(Run the Filton shuttle from Temple Meads at xx:30 and you could double the frequency at Ashley Down, picking up the return trip from Filton in the current timing. Problem then being, how do you serve Henbury?)
|
|
|
Logged
|
|
|
|
stuving
|
|
« Reply #230 on: November 02, 2024, 11:17:04 » |
|
The explanation of why this is not regularly done - to allow paths for the super fasts - is now historic. Those trains are not running and I don't think they're expected to. So that excuse for stopping one station short of the major interchanges no longer holds.
Which brings it back to my suggestion that "we don't want to encourage these customers / this traffic flow by providing services". It could be because they know they would build up a vibrant set of users without a plan to keep those customers served if and when Henbury opens.
I still think that the issue is one of conflicts with Main Line paths by a train reversing at BPW» . Each one crosses from the Up Relief to the Up Main south of FIT, stops in P2, goes to BPW and gets into its platform, then comes back on the Down Main (crossing the other Main going in or out), stops in P1 at FIT, crossing over the Up Main to get to the Down Relief. That will block more than one Main Line path each way.
|
|
|
Logged
|
|
|
|
RichardB
|
|
« Reply #231 on: November 02, 2024, 15:02:08 » |
|
I should imagine Ashley Down is pretty busy today, particularly with Weston-super-Mare fans heading for their FA Cup match against Bristol Rovers.
|
|
|
Logged
|
|
|
|
WelshBluebird
|
|
« Reply #232 on: November 02, 2024, 20:39:40 » |
|
I should imagine Ashley Down is pretty busy today, particularly with Weston-super-Mare fans heading for their FA Cup match against Bristol Rovers.
Did seem to be well used when I was heading to Cardiff and back again for my teams match today! Does look like a couple of the extra services were cancelled pre match though, and pretty surprised the extra services that did call weren't the Cardiff to West County services as they would have given a direct service from Weston!
|
|
|
Logged
|
|
|
|
XPT
|
|
« Reply #233 on: November 03, 2024, 10:22:03 » |
|
A really bad again for anyone using(or intending to use) Ashley Down station today. On Sundays, the calling point of Ashley Down is included in the hourly services between Cardiff Central and Taunton/Exeter St Davids/Plymouth/Penzance. But so far today, every single one of those services has been cancelled! The first service northbound from Ashley Down currently expected to be on time isn't until 1421 and the first service southbound until 1445!! What an absolute joke!
|
|
|
Logged
|
|
|
|
brooklea
|
|
« Reply #234 on: November 03, 2024, 11:24:32 » |
|
From JourneyCheck Cancellations to services between Bristol Temple Meads and Cardiff Central Following engineering works not being finished on time at Severn Tunnel Jn the line will be reopened shortly. Disruption is expected until 11:30 03/11. Train services between Bristol Temple Meads and Cardiff Central may be cancelled or delayed.
Customer Advice We are currently experiencing disruption between Cardiff Central and Bristol Temple Meads due to engineering works not being finished on time, as a result services will be disrupted between Cardiff Central and Bristol Temple Meads. . Network Rail technicians are on site and estimate the service will be moving again at approximately 11:00. . We re working with our providers to source Road Transport. Please check back shortly. . We are sorry for the delay to your journey. Hopefully the handful of trains booked to call this afternoon at Ashley Down will run.
|
|
|
Logged
|
|
|
|
WelshBluebird
|
|
« Reply #235 on: November 03, 2024, 21:51:58 » |
|
Not sure how many were done to the late running engineering works and how many were actually to do with the long running staff shortage - especially as most of the afternoon Ashley Down services were cancelled too. Looks like just 3 (out of I think 11 timetabled services) called today.
|
|
|
Logged
|
|
|
|
grahame
|
|
« Reply #236 on: November 03, 2024, 22:13:35 » |
|
Not sure how many were done to the late running engineering works and how many were actually to do with the long running staff shortage - especially as most of the afternoon Ashley Down services were cancelled too. Looks like just 3 (out of I think 11 timetabled services) called today.
Oh dear ... I really dislike logging it like this because it looks of poor ...
|
|
|
Logged
|
Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
|
|
|
Chris from Nailsea
|
|
« Reply #237 on: November 03, 2024, 22:22:26 » |
|
That is indeed shocking!
|
|
|
Logged
|
William Huskisson MP▸ was the first person to be killed by a train while crossing the tracks, in 1830. Many more have died in the same way since then. Don't take a chance: stop, look, listen.
"Level crossings are safe, unless they are used in an unsafe manner." Discuss.
|
|
|
brooklea
|
|
« Reply #238 on: November 06, 2024, 18:34:12 » |
|
Here's an example: 166220 ... arrived at Filton Abbey Wood at 12:26 as 2H62 ... ran as 5H63 to Bristol Parkway, platform 4 ... coninued as 5H63 at 12:48 to Filtom Abbey Wood, arriving 12:52 ... formed 2H63, the 12:54 to Bristol Temple Meads
I think I have mis-understood something then. I believed that the reason the stopper up Filton Bank terminated rather oddly at Abbey Wood, one station before it would provide connections to London, Swansea, Birmingham and beyond was because of capacity issues at Bristol Parkway. And yet here it is buzzing in and out empty from platform 4.
5H63 terminated at Bristol Parkway today, and then ran back to Filton as 2H63, and then continuing on to Temple Meads https://www.realtimetrains.co.uk/service/gb-nr:24369/2024-11-06/detailed(Apologies for posting a link to a page that’ll expire in a few weeks time). Partly filling a gap caused by the cancellation of 12:10 Gloucester to Westbury, but at least a sensible use of the resources available.
|
|
|
Logged
|
|
|
|
johnneyw
|
|
« Reply #239 on: November 09, 2024, 19:13:59 » |
|
Picked up some prepaid tickets today from the machine at Ashley Down Station which just happened to be shortly after the Bristol Rovers match finished. Although I couldn't see how many people had got on to the northbound service which pulled out as I arrived, there was still a steady stream of people arriving for both platforms including the Worcester Foregate service which pulled in two or three minutes behind the one that I just missed. Looks like a fair few services in each direction were stopping there in the hour after the match and people were catching on to this. Not sure what the home/away fan ratio was but the numbers seemed encouraging.
|
|
|
Logged
|
|
|
|
|