Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 08:35 10 Nov 2024
 
- In Russia's shadow: The Baltics wait for Europe's strategic new railway
- Your pictures on the theme of 'road trip'
- Comedian Godley to go on 'final tour' before funeral
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 21/11/24 - ORR Station use stats
23/11/24 - Congresbury cleanup volunteers
27/11/24 - WWRUG, Trowbridge
28/11/24 - Melksham TUG - 18:30

No 'On This Day' events reported for 10th Nov

Train RunningCancelled
10/11/24 08:38 Exeter Central to Okehampton
10/11/24 08:52 London Paddington to Weston-Super-Mare
10/11/24 09:01 Swindon to Bristol Temple Meads
09:12 Swindon to Westbury
10/11/24 09:15 Exeter St Davids to Exmouth
10/11/24 09:35 Swindon to Cheltenham Spa
10/11/24 09:50 Swindon to Bristol Temple Meads
10/11/24 09:55 Exmouth to Paignton
10/11/24 10:01 Bristol Temple Meads to Penzance
10/11/24 10:31 Swindon to Cheltenham Spa
10:46 Westbury to Swindon
10:53 Swindon to Bristol Temple Meads
10/11/24 10:54 Cheltenham Spa to London Paddington
10/11/24 11:00 Bristol Temple Meads to London Paddington
11:25 Okehampton to Exeter Central
10/11/24 11:31 Weston-Super-Mare to London Paddington
10/11/24 11:55 Cheltenham Spa to Swindon
10/11/24 12:30 Swindon to Cheltenham Spa
12:32 Exeter Central to Okehampton
10/11/24 13:29 Swindon to Cheltenham Spa
13:30 Bristol Temple Meads to Westbury
10/11/24 14:00 Cheltenham Spa to Swindon
15:00 Cardiff Central to Penzance
19:26 Taunton to Bristol Temple Meads
19:30 London Paddington to Bristol Temple Meads
20:00 Cheltenham Spa to Swindon
21:57 Worcester Shrub Hill to Bristol Temple Meads
22:10 Taunton to Bristol Temple Meads
22:15 London Paddington to Bristol Temple Meads
10/11/24 23:49 Guildford to Gatwick Airport
Short Run
07:34 Guildford to Gatwick Airport
07:38 London Paddington to Penzance
08:10 Redhill to Guildford
08:15 Worcester Foregate Street to London Paddington
10/11/24 09:18 Cardiff Central to Southampton Central
09:20 Bristol Temple Meads to Southampton Central
10/11/24 09:26 Okehampton to Exeter Central
10/11/24 09:45 Plymouth to Cardiff Central
10/11/24 10:25 Cardiff Central to Southampton Central
10:32 Exeter Central to Okehampton
10/11/24 10:50 Penzance to Cardiff Central
10:52 London Paddington to Plymouth
10/11/24 11:50 Penzance to Cardiff Central
11:54 Paignton to Exmouth
11:57 Southampton Central to Cardiff Central
10/11/24 12:31 London Paddington to Paignton
12:53 Paignton to Exmouth
13:25 Cardiff Central to Southampton Central
13:35 Severn Beach to Weston-Super-Mare
10/11/24 13:50 Penzance to Cardiff Central
13:53 Paignton to Exmouth
13:57 Southampton Central to Cardiff Central
20:30 London Paddington to Weston-Super-Mare
20:46 Great Malvern to London Paddington
11/11/24 00:35 Didcot Parkway to London Paddington
etc
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
November 10, 2024, 08:35:20 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[111] [otd] 9th November 1839 - death at Box Tunnel
[84] New station at Ashley Down, Bristol
[70] Platform tickets
[66] A study of using public transport for someone newly arriving i...
[53] Passenger Charter - what I want
[46] Shortage of train crews on Great Western Railway - ongoing dis...
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: 1 2 [3] 4
  Print  
Author Topic: Bike spaces on IETs  (Read 19334 times)
CyclingSid
Moderator
Hero Member
*****
Posts: 2069


Hockley viaduct


View Profile
« Reply #30 on: July 04, 2021, 16:42:27 »

Similarly luggage in the bike spaces can mean non-acceptance of bikes!
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10315


View Profile
« Reply #31 on: July 04, 2021, 19:17:05 »

Just witnessed a TM(resolve) refuse carriage to a cyclist who had a booked bike reservation because “I’m full up with bikes already”. It’s the [redacted] up service from Charlbury, a 5-coach IET (Intercity Express Train) which is always very busy as there’s a two-hour gap beforehand.

If a reservation doesn’t guarantee you a space, I seriously wonder what the point of them is. At the very least I would have thought the bike could have been stashed elsewhere on the train for the two short stops to Oxford, and the passenger asked to change onto a stopper from there.

Agree completely that if the passenger held a reservation then the TM should, unless there is a safety issue due to crowding on the train, have honoured that reservation by allowing the bike in a vestibule until other arrangements could be made.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
trainbuff
Transport Scholar
Sr. Member
******
Posts: 251


View Profile
« Reply #32 on: July 04, 2021, 22:28:11 »

I guess the problem is that the vestibule area is actually quite small. It is possible, especially in the blame culture society we live in, that allowing a bicycle in a vestibule could cause injury to a third party. Litigation could result. Ultimately the Train Manager should move the luggage out of the bike racks. Just putting that forward as Devils Advocate really.
Logged

Invest in Railways in Devon and Cornwall!
IndustryInsider
Data Manager
Hero Member
******
Posts: 10315


View Profile
« Reply #33 on: July 04, 2021, 22:32:47 »

If there was luggage in the reserved bike spaces, then yes.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
froome
Transport Scholar
Hero Member
******
Posts: 944


View Profile Email
« Reply #34 on: July 04, 2021, 22:38:16 »

I spent many years of the 1980s and 1990s campaigning on improving bike access to trains, including getting it aired on Radio 4 for half an hour, and despair at how we still manage to go backwards on this provision. Together, bikes and trains have always offered the best opportunity to reduce car use.

But on a recent journey I did see a train manager going out of their way to accommodate bikes, when 3 cyclists were trying to get their bikes onto a crowded train at Abergavenny. There really wasn't any space to get them in without completely blocking access, but between him and the riders, they spent a few minutes managing to fit them in. So some train managers do go out of their way to help.
Logged
froome
Transport Scholar
Hero Member
******
Posts: 944


View Profile Email
« Reply #35 on: July 05, 2021, 07:40:54 »

Just to respond more properly to Richard's point. I agree that the current reservation system for IETs (Intercity Express Train) is mostly pointless, as it appears almost unworkable for TMs(resolve) trying to ensure trains run to time, who don't have the capacity to manage it.

Reservations have always been brought in to manage demand that far exceeds supply. Some bike journeys are planned ahead (holidays etc) but most demand for bikes on trains is ad hoc, dependent on the weather and other circumstances. The pandemic has probably increased demand, and hopefully our collective response to the climate emergency will increase it further. Without better on-train provision, there will always be an element of conflict between TMs and cyclists, to the detriment of both, and to other passengers.

Richard's initial post in this thread offered some sensible short-term solutions, but the only longer term solution is a positive working relationship between train operators and cyclists groups that worked to design trains to enable demand to be better met, and to create a working environment for train staff to manage it.
Logged
Bmblbzzz
Transport Scholar
Hero Member
******
Posts: 4256


View Profile
« Reply #36 on: July 08, 2021, 13:40:14 »

In practice it's very difficult to stop people bringing unreserved bikes on a train. It could only be done by having one staff member policing the relevant door(s) at each stop.
Logged

Waiting at Pilning for the midnight sleeper to Prague.
broadgage
Transport Scholar
Hero Member
******
Posts: 5592



View Profile
« Reply #37 on: July 08, 2021, 15:33:04 »

I spent many years of the 1980s and 1990s campaigning on improving bike access to trains, including getting it aired on Radio 4 for half an hour, and despair at how we still manage to go backwards on this provision. Together, bikes and trains have always offered the best opportunity to reduce car use.

But on a recent journey I did see a train manager going out of their way to accommodate bikes, when 3 cyclists were trying to get their bikes onto a crowded train at Abergavenny. There really wasn't any space to get them in without completely blocking access, but between him and the riders, they spent a few minutes managing to fit them in. So some train managers do go out of their way to help.

"despair at how we still manage to go backwards on this provision"

Surely not ! IET (Intercity Express Train) advocates assured us that IETs are purpose designed trains with more cycle spaces than previously available. And that the cycle spaces were designed in consultation with relevant groups.
What went wrong ?
Logged

A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard.
It has space for cycles, surfboards,luggage etc.
A 5 car DMU (Diesel Multiple Unit) is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
Lee
Transport Scholar
Hero Member
******
Posts: 7519


GBR - The Emperor's New Rail Network


View Profile WWW
« Reply #38 on: July 08, 2021, 16:53:49 »

I spent many years of the 1980s and 1990s campaigning on improving bike access to trains, including getting it aired on Radio 4 for half an hour, and despair at how we still manage to go backwards on this provision. Together, bikes and trains have always offered the best opportunity to reduce car use.

But on a recent journey I did see a train manager going out of their way to accommodate bikes, when 3 cyclists were trying to get their bikes onto a crowded train at Abergavenny. There really wasn't any space to get them in without completely blocking access, but between him and the riders, they spent a few minutes managing to fit them in. So some train managers do go out of their way to help.

"despair at how we still manage to go backwards on this provision"

Surely not ! IET (Intercity Express Train) advocates assured us that IETs are purpose designed trains with more cycle spaces than previously available. And that the cycle spaces were designed in consultation with relevant groups.
What went wrong ?

Sustrans were involved in that process. From a 2017 Guardian article:

Quote from: 2017 Guardian article
Martyn Brunt of Sustrans was involved in testing the new bike carriages out. Brunt says although the space is “designed pretty well” with secure hangers for bikes and enough space to safely load and unload, there are potential problems.

He says: “The cycle space itself is designed to be flexible, which means that other things than bikes can be stored in there, for instance large luggage. Unless a cycle space is booked ahead, the chances of getting on with a bike are pretty much zero.”

He fears that as the number and configuration of carriages on a given service is at the discretion of the train operating company, busy services may have “virtually no cycle spaces”.

As he puts it: “The strict commercial targets imposed by the Department for Transport create a system that favours getting more seats filled, and thus reducing the space for non-paying items like cycles.”
Logged

Vous devez être impitoyable, parce que ces gens sont des salauds - https://looka.com/s/78722877
Richard Fairhurst
Global Moderator
Hero Member
*****
Posts: 1243


View Profile Email
« Reply #39 on: August 28, 2021, 23:06:45 »

Looks like the Government-run LNER» (London North Eastern Railway - about) have recognised that the bike spaces on their 80Xs aren’t fit for purpose:

https://mobile.twitter.com/LNER/status/1431567369407811589

Et tu, GWR (Great Western Railway)?
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10315


View Profile
« Reply #40 on: August 29, 2021, 12:33:46 »

A different design of hook?

Should be easy enough to adapt on the government run GWR (Great Western Railway) trains too if so.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
Bmblbzzz
Transport Scholar
Hero Member
******
Posts: 4256


View Profile
« Reply #41 on: August 29, 2021, 14:58:50 »

A different hook might be better in terms of rim size but still retains the fundamental dangly problem.
Logged

Waiting at Pilning for the midnight sleeper to Prague.
Richard Fairhurst
Global Moderator
Hero Member
*****
Posts: 1243


View Profile Email
« Reply #42 on: September 10, 2021, 17:02:54 »

I travelled back from Rhyl (oh, the glamour!) yesterday - two of us, two (narrow) bikes, reservations made for each leg. Interesting to contrast the provision on the three trains we took.

Leg 1 was Rhyl to Wolverhampton, a TfW 158: 2 carriages to begin, 4 carriages after Chester. There was one (folding but unfolded) bike already on, and a third cyclist getting on at Rhyl with us. That's twice as many bikes as the stated capacity, but it worked fine, thanks not least to the very helpful guard who was keen to talk to us about his new gravel bike!

Leg 2 was Wolverhampton to Oxford, a CrossCountry 22something - or two in fact, totalling nine carriages. Voyager bike accommodation is slightly curious: 2 hanging cabinets, one taking two bikes, the other only one. Absolutely full marks to the XC (Cross Country Trains (franchise)) staff member who saw there was a single, wide-handlebarred bike in the 2-bike cabinet, and took it on herself to move that across to the 1-bike cabinet so we could get ours in.

Leg 3 was Oxford to Charlbury, and a five-coach IET (Intercity Express Train). I had an ominous feeling this would be the tricky one, and it was. No indication of which of the two "bike & bulk" rooms we were meant to use, but we chose the one nearest the front (and suggested to an Oxford-Hanborough cyclist that he use the other). But, as documented, IET bike spaces are not forgiving for anything that isn't a narrow-barred road bike... and though ours were, an existing occupant of the space wasn't: an "e-bike" that I would charitably describe as a motorbike with pedals. Absolutely no way you could have got a fully folded Brompton in the cabinet with it, let alone two full-size bikes! So we stood in the vestibules with our bikes and manhandled them out the way at Hanborough. No sign of any staff.

Any lessons learned? One is that staff goodwill can go a very long way - we were delighted with how helpful the TfW and XC staff were.

The second is that bikes come in all sorts of shapes and sizes these days, and bike accommodation needs to keep pace with that. I doubt it's ever going to be feasible for motorbike-sized e-bikes to be transported by train, and TOCs (Train Operating Company) might want to consider setting a maximum size. But the wide-barred bike on the Voyager was just a "normal bike", and it was a little alarming that it nominally took up two spaces.

Similarly, the folding bike on the 158 would ideally have been in a luggage rack, folded, rather than the main bike spaces. Luggage racks have been getting smaller over time, not least with IETs compared to HSTs (High Speed Train), and maybe that needs to be revisited.
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10315


View Profile
« Reply #43 on: September 10, 2021, 17:56:57 »

Usually there is a cycle symbol on the CIS (Customer Information System) at Oxford to show which carriage/zone the cycles go.  With the reservation, did the carriage letter not come with that?

As an aside I’ve just witnessed a very panic stricken passenger running up and down the platform (and a delay of a few minutes) at Preston when they were unable to access their bike stowed in the back compartment of a Pendolino.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
PhilWakely
Transport Scholar
Hero Member
******
Posts: 2110



View Profile
« Reply #44 on: September 10, 2021, 20:52:23 »

Usually there is a cycle symbol on the CIS (Customer Information System) at Oxford to show which carriage/zone the cycles go.  With the reservation, did the carriage letter not come with that?

Cycle reservation tickets do not show the coach letter.
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 2 [3] 4
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page