Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 22:35 28 Mar 2024
- Bus plunges off South Africa bridge, killing 45
* Easter getaways hit by travel disruption
- Where Baltimore bridge investigation goes now
- How do I renew my UK passport and what is the 10-year rule?
- Family anger at sentence on fatal crash driver, 19
- Easter travel warning as millions set to hit roads
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
28th Mar (1992)
MOD Kineton tour, branch line society (*)

Train RunningCancelled
19:35 Exeter St Davids to London Paddington
20:56 Worcester Foregate Street to London Paddington
22:25 Bedwyn to Newbury
22:30 Gatwick Airport to Reading
22:47 Newbury to Bedwyn
Short Run
17:03 London Paddington to Penzance
18:03 London Paddington to Penzance
20:03 London Paddington to Plymouth
21:04 London Paddington to Plymouth
22:10 Severn Beach to Bristol Temple Meads
23:04 Reading to Bedwyn
23:17 Bedwyn to Reading
Delayed
19:04 London Paddington to Plymouth
21:30 Gatwick Airport to Reading
21:45 Penzance to London Paddington
23:45 London Paddington to Penzance
PollsOpen and recent polls
Closed 2024-03-25 Easter Escape - to where?
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
March 28, 2024, 22:48:13 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[104] West Wiltshire Bus Changes April 2024
[103] would you like your own LIVE train station departure board?
[78] Infrastructure problems in Thames Valley causing disruption el...
[56] If not HS2 to Manchester, how will traffic be carried?
[41] Return of the BRUTE?
[25] Reversing Beeching - bring heritage and freight lines into the...
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: 1 2 [3] 4 5 ... 7
  Print  
Author Topic: Engineering work to close St Ives branch Jan to Feb 2021  (Read 18942 times)
Electric train
Transport Scholar
Hero Member
******
Posts: 4356


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #30 on: January 05, 2021, 19:45:59 »

In the light of the last few posts - what prospects of someone developing something better than the much-heralded machine that failed to deliver the goods on the Great Western Main Line (GWML (Great Western Main Line)) electrification to deliver Over-Head Lines (OHL (Over-Head Line)) quicker and cheaper?

The "clever" people who dreamt up the Over-Head Lines (OHL) factory train have mostly left the industry, we now have engineer in the industry with recent experience who have learnt the lessons of GWEP (Great Western Electrification Program) especially from a number of former British Rail (BR (British Rail(ways))) engineers who were involved in East Coast Main Line (ECML (East Coast Main Line)) etc that were brought in as consultants.



Edit: VickiS - Clarifying Acronyms
« Last Edit: March 14, 2021, 19:03:34 by VickiS » Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
RailCornwall
Hero Member
*****
Posts: 642


View Profile
« Reply #31 on: January 05, 2021, 21:59:21 »

So how practically will the work be done at St Ives, when the line ends at the buffers at the station. An explanation would be welcome.
Logged
CyclingSid
Data Manager
Hero Member
******
Posts: 1918


Hockley viaduct


View Profile
« Reply #32 on: January 06, 2021, 07:12:24 »

Probably not acceptable to Network Rail:
https://www.yorkshirepost.co.uk/heritage-and-retro/heritage/army-has-relaid-bridge-level-crossing-and-450m-track-wensleydale-railway-just-three-weeks-3002103
From another article it appears the Army's interest is that this is the railway that brings tanks into Catterick Garrison.
What I was looking for was the fabulous picture of an RE (Religious Education) track laying machine on the Longmoor Military Railway, not to modern H&S (Health and Safety) standards but a typical Army pragmatic solution.
Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4356


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #33 on: January 06, 2021, 07:25:30 »

So how practically will the work be done at St Ives, when the line ends at the buffers at the station. An explanation would be welcome.

The sleeper laying train will work as close to the line end as it can, also when the Maidenhead - Bourne End was relayed last year the platform areas have concrete sleepers which were laid by RRV (Road Rail Vehicle) (Road Rail Vehicles) effectively track panel by track panel (60 ft ish)
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
TonyK
Global Moderator
Hero Member
*****
Posts: 6435


The artist formerly known as Four Track, Now!


View Profile
« Reply #34 on: January 06, 2021, 08:35:54 »


There is plenty of video of the Plasser machine in action, including this piece in Sweden.

In the light of the last few posts - what prospects of someone developing something better than the much-heralded machine that failed to deliver the goods on the GWML (Great Western Main Line) electrification to deliver OHL (Over-Head Line) lines quicker and cheaper?

It seemed to me at the time that the fault lay not with the Over-Head Lines (OHL) train but with whoever thought it was appropriate for the particular job in hand. I may well have this wrong and look forward to correction, but I recall that it worked according to what it said on the tin. There were lots of issues with stuff that had been buried along the lineside without being recorded, such as a massive internet outage when it punched a gantry base through a fibre optic cable, and signal cables being cut. Some of the tracks weren't in the same position as when someone last updated records, and we were left with exploratory digging having to be done by men with shovels. On a lovely virgin railway, with all the add-ons routed neatly through proper conduits, it might well have accomplished the claimed 1.6 Km per overnight shift, but the real world proved to be a more challenging environment. I would hope that we got our money back, but somehow, I doubt it..


Edit: VickiS - Clarifying Acronyms
« Last Edit: March 14, 2021, 19:07:08 by VickiS » Logged

Now, please!
RailCornwall
Hero Member
*****
Posts: 642


View Profile
« Reply #35 on: January 06, 2021, 08:50:36 »









from Network Rail Western on Twitter.
Logged
bobm
Administrator
Hero Member
*****
Posts: 9810



View Profile
« Reply #36 on: January 06, 2021, 10:21:31 »

Lovely photos, but torture we can't go to see for ourselves!
Logged
Thatcham Crossing
Transport Scholar
Hero Member
******
Posts: 793


View Profile
« Reply #37 on: January 06, 2021, 12:21:08 »

Lovely photos, but torture we can't go to see for ourselves!

Indeed so, I can just about see our favourite St Ives restaurant (Porthminster Beach Cafe) in the final shot!

Looks like the work is progressing well.
Logged
bobm
Administrator
Hero Member
*****
Posts: 9810



View Profile
« Reply #38 on: January 07, 2021, 07:44:43 »

A video featuring some of the work

https://www.youtube.com/watch?fbclid=IwAR0BhoUNPEEknzQuDAJANef7mWOsv0MfovsMwO66iqQao1dgLew7rpAmbYA&v=S6T5jjivQ88&feature=youtu.be
Logged
Thatcham Crossing
Transport Scholar
Hero Member
******
Posts: 793


View Profile
« Reply #39 on: January 07, 2021, 08:42:42 »


Thanks for posting, looks like quite a bit of new track is down already, including some with concrete sleepers.

Also interesting to see the latest large residence ("Skyfall") taking further shape on what I call "millionaires row" between St Ives and Carbis Bay, since I was last there back in August.

Interesting to see also what is being dug up on Porthminster Beach?
Logged
RailCornwall
Hero Member
*****
Posts: 642


View Profile
« Reply #40 on: January 07, 2021, 15:44:04 »

I note that although the whole line is seaward facing, that the apparent concrete sleepers shown in the video, appear to be on the most exposed stretch of the track being relaid. Reference to this aspect of the job was made earlier in this thread.

EDIT ...

More from Network Rail Western on Twitter







« Last Edit: January 07, 2021, 16:24:13 by RailCornwall » Logged
RailCornwall
Hero Member
*****
Posts: 642


View Profile
« Reply #41 on: January 11, 2021, 16:49:30 »

Drone Footage from Network Rail Western.

https://twitter.com/networkrailwest/status/1348662466486685698
Logged
RailCornwall
Hero Member
*****
Posts: 642


View Profile
« Reply #42 on: January 12, 2021, 16:29:44 »

More today from Network Rail Western (NRW» (Network Rail Western - about)) on Twitter







Edit: VickiS - Clarifying Acronyms
« Last Edit: March 14, 2021, 19:09:43 by VickiS » Logged
MVR S&T
Transport Scholar
Hero Member
******
Posts: 438


View Profile
« Reply #43 on: January 12, 2021, 16:38:41 »

Option for a 2 foot gauge line?
Logged
old original
Transport Scholar
Hero Member
******
Posts: 877


View Profile
« Reply #44 on: January 12, 2021, 17:06:13 »

Atmospheric railway pipe...
Logged

8 Billion people on a wet rock - of course we're not happy
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 2 [3] 4 5 ... 7
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page