Public chat notes / views /links.
On Catering on "The Mule" and wider on SWR see
http://www.passenger.chat/24340it's a pity the Department for Transport are removing the catering services from all south western railway main line trains this weekend including Exeter st David Exeter cental yeovil junction Salisbury London Waterloo. and Weymouth Bournemouth Southampton central London Waterloo.
if you want leasure travel from Devon and Dorset you need catering .
The catering removal is permanent
but its over priced. it puts people off. I don't want to spend ?3.50 on a coffee... I'd rather take my own.
the RMT staff are redundant
other catering services may follow
Department for transport said on catering being removed a full.passenger consultation tock.place but no group got consultation emails
Lots of comments on loss of catering on Salisbury to Exeter Line. It is now high on our lobbying agenda. The caterers contract has been cancelled but we are not sure if its Covid related and whether there are plans to re-instate post Covid. No catering is not acceptable.
Nick, Fine about the catering as people loose jobs. But needs to be affordable. SWR probably are saving money hence why it was cancelled. GWR removed all Catering on routes, with only limited on London as It was a trail period.
The department for transport are removing catering its never made money it's used to get leasure and Business travellers to use long distance trains
but is not in emergency contracts
----------
Wider comment on SERUGdoes serug propose the development of chard parkway at the existing dairy loop?
Redoubling Salisbury to Exeter would probably cost a lot less than A303 upgrade (including Stonehenge horror!)
How much of the improvement in punctuality is due to less trains and how much to less passengers (reduced station dwell times)?
Train performance not only is affected by line capacity, but - in the case of a single line with passing points - the resilience of the signalling/ points and proper train regulating policy; the latter hasn't performed properly since signalling was centralised in Basingstoke.
I did the GWR diversion from Exeter via Castle Cary, The timings for the trains were scheduled in around it. There was no delay. SWR had priority over the line.
The ultimate ambition. should be to restore double track throughout as has happened with the other lines singled in the 1960's by BR Western Region
The Cotswold Line had the same issues but reinstating more double track has pretty much solved timekeeping and enabled a more frequent service.
Chard Junction / Parkway - doesn't figure in our plans currently. We've met with South Somerset Council and have left the ball with them - if they can support a business case, it could be considered, but needs to be driven and examined by the council
----------------
On Bridporthttp://www.bridportrenewal.org.uk/http://www.bridportrenewal.org.uk/wp-content/uploads/2021/01/Bridport-Renewal-Vision-07-01-2020.pdfsupport reopening the maiden Newton to Bridport branch
we need good public transport to Bridport and Improvements in the bus links to Axminster railway station Dorchester and Weymouth
I agree David, Let's spend money on improving existing things before creating new things.
Need to open up the conversation about interlinking services to the wider region
Park and Ride is a brilliant idea. we are put off travelling to West Bay because of parking problems
From the point of view of people visiting area from Devon, idea of a P&R on A35 is welcome. Would it have overnight parking option? - eg so people could leave car while taking a walking / cycling break on the line?
You might want to talk to Christopher Maltin who is developing ultra light rail using bio methane
http://biomethane.co.uk/christopher-maltin/Presume plan for P&Rs will also include them being electric car charging hubs?
But First Group won't improve the service as they are a commercial business and only interested in money. That route doesn't make any... therefore no service.
Any suggestions for contact to talk about the wider services would be helpful - please feel free to send suggestions to
sayhello@bridportrenewal.org.ukis an of the Bridport Branch owned by Highway England
More Money = More Service for Bus Services. Council needs to spend.
Lots of different owners
department for transport is funding all bus services in England at 27 .5 million pounds a week including Dorset bus service not on rural buses
Yes David but if the funding stops then so will the services. X51 and X53 is a good route but finishes early and not frequent enough
--------------
And Also see also
http://www.passenger.chat/24469we need to stop the highway England destroying track beds and tunnel s
need to stop Highway England full stop