Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 16:15 28 Mar 2024
* Passengers pleaded with knifeman during attack
- How do I renew my UK passport and what is the 10-year rule?
- Jet2 launches first flight from Liverpool airport
- Easter travel warning as millions set to hit roads
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
28th Mar (1917)
Bideford, Westward Ho! and Appledore closed (link)

Train RunningCancelled
15:16 London Paddington to Cardiff Central
15:30 Bristol Temple Meads to London Paddington
16:51 Filton Abbey Wood to Bristol Temple Meads
16:54 Cardiff Central to London Paddington
17:04 Bristol Temple Meads to Filton Abbey Wood
17:51 Filton Abbey Wood to Bristol Temple Meads
17:54 Cardiff Central to London Paddington
17:57 London Paddington to Worcester Foregate Street
19:33 London Paddington to Worcester Shrub Hill
20:56 Worcester Foregate Street to London Paddington
Short Run
12:03 London Paddington to Penzance
13:10 Gloucester to Weymouth
13:28 Weymouth to Gloucester
15:10 Gloucester to Weymouth
15:23 Portsmouth Harbour to Cardiff Central
15:30 Cardiff Central to Portsmouth Harbour
16:19 Carmarthen to London Paddington
16:23 Portsmouth Harbour to Cardiff Central
Delayed
13:30 Cardiff Central to Portsmouth Harbour
13:55 Paignton to London Paddington
13:59 Cardiff Central to Penzance
14:30 Cardiff Central to Portsmouth Harbour
14:36 London Paddington to Paignton
17:23 Portsmouth Harbour to Cardiff Central
PollsOpen and recent polls
Closed 2024-03-25 Easter Escape - to where?
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
March 28, 2024, 16:31:55 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[142] West Wiltshire Bus Changes April 2024
[80] would you like your own LIVE train station departure board?
[56] Return of the BRUTE?
[46] If not HS2 to Manchester, how will traffic be carried?
[43] Infrastructure problems in Thames Valley causing disruption el...
[34] Reversing Beeching - bring heritage and freight lines into the...
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: [1]
  Print  
Author Topic: was the U.K slow to commence over head wire construction?  (Read 1538 times)
infoman
Hero Member
*****
Posts: 1286


View Profile
« on: January 14, 2021, 06:11:25 »

Looking at Victoria in Australia most of the Melbourne area had over head wires by the 1920's ish
Melbourne to Traralgon main line was completed in 1954.
I think I am correct in saying U.K. main line electrifcation started in the mid 1970's
Should/could the U.K. have jumped from steam to over heads earlier?
Or was it a case of cost fuel being cheaper/political reasons?
Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4355


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #1 on: January 14, 2021, 07:29:40 »

Looking at Victoria in Australia most of the Melbourne area had over head wires by the 1920's ish
Melbourne to Traralgon main line was completed in 1954.
I think I am correct in saying U.K. main line electrifcation started in the mid 1970's
Should/could the U.K. have jumped from steam to over heads earlier?
Or was it a case of cost fuel being cheaper/political reasons?

The UK (United Kingdom) stated much earlier than that, the 3 constituent parts of Southern Railway had stated electrification before the grouping in 1923; the LNER» (London North Eastern Railway - about) had commenced 1500V DC (Direct Current) OLE (Overhead Line Equipment, more often "OHLE") electrification of the routes out of Liverpool St before WW2, BR (British Rail(ways)) continued with 1500V DC post WW2 on the Woodhead Route.

BR took a brave decision in 1956 to adopt 25kV AC OLE electrification for the WCML (West Coast Main Line) and for future schemes, the WCML was completed to Glasgow in the early 1970's

  https://en.wikipedia.org/wiki/Railway_electrification_in_Great_Britain

The UK has been poor in its consistency with electrification which by and large is due to political decisions and not Railway Industry decisions
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
bradshaw
Transport Scholar
Hero Member
******
Posts: 1450



View Profile
« Reply #2 on: January 14, 2021, 08:26:18 »



From 1913 former Clarence Railway lines were electrified with 1,500 Vdc overhead lines and electric locomotives hauled coal trains between Shildon and Erimus marshalling yard, which had opened in 1908 between Middlesbrough and Thornaby (Wikipedia)
Logged
grahame
Administrator
Hero Member
*****
Posts: 40690



View Profile WWW Email
« Reply #3 on: January 14, 2021, 08:46:49 »

From John Speller's Web Pages - Midland Railway

Quote
The Heysham to Morecambe line was opened to electric trains on 13 April 1908, followed by Lancaster Green Ayre on 8 June 1908 and Lancaster Castle on 14 September 1908. The electric multiple unit trains achieved an availability of 99.63% in their first year of operation, a reliability unprecedented on a steam railway, and indeed on electric and diesel ones as well. The units operated magnificently until their withdrawal in 1951, after which diesel traction was introduced.
Logged

Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
stuving
Transport Scholar
Hero Member
******
Posts: 7156


View Profile
« Reply #4 on: January 14, 2021, 11:54:10 »

Looking at Victoria in Australia most of the Melbourne area had over head wires by the 1920's ish
Melbourne to Traralgon main line was completed in 1954.
I think I am correct in saying U.K. main line electrifcation started in the mid 1970's
Should/could the U.K. have jumped from steam to over heads earlier?
Or was it a case of cost fuel being cheaper/political reasons?

The answer depends on how early "early" is, I think. In  "Outlines of Electrical Engineering" by Harold H Simmons* (Cassel, 1909), there is Section on electric traction, with three short chapters on trams and one on railways. He considers the economics of electric versus steam and (for trams) cable traction - but I can't see any mention of internal combustion, which seems odd (with hindsight, at least).

He concludes that electricity wins for trams, with the exception of very steep hills. Overhead feeding beats ground-level in streets, and always has done. For railways he finds the economics are not yet clearly in favour of electricity, but other factors (safety, smoke-free tunnels, and laws dictating the choice) often swing the choice in urban and some suburban systems.

For both trams and (sub)urban trains he sees the state of the art as mature - meaning good enough, not that it won't evolve incrementally. They use around 500-600 V DC (Direct Current), with an upper limit of 1200 V imposed by the commutators. AC motors were never used, since they had so little torque when starting and needing to accelerate.

Main lines, even then, were not suitable for third rail - a unanimous view, except in BR (British Rail(ways)) Southern Region down to quite recent times! While the Swiss had tried using AC motors, with a three-phase supply, this was a demonstration (in the Simplon Tunnel) and never found more general application. AC supply was being used, but with DC motors (which change direction by having the leads of their field coils swapped over). The commutators (again) and the inductance of the motors together meant that 50 Hz could not be used, but 25 Hz AC was already being used instead.

So while OLE (Overhead Line Equipment, more often "OHLE") was established, there was no clear way forward as to what flavour. With DC, voltages had to be too low to be efficient; while for AC, at 25 Hz the motors and transformers were big and performance not that great either. I think (though he doesn't say as much) he was not foreseeing big generators in public supplies, or a grid, but smaller steam power stations run by the railway. So steam locomotives still had a cost advantage against all that infrastructure and losses.

Again, it was external factors that pushed a few railways towards electric traction. Abundant hydro power, a shortage of coal, or long tunnels (all true for the Swiss, especially) are mentioned, plus imposed legal requirements again. He mentions the Midland Railway's line from Lancaster to Morecambe, but mainly as an example of the "Siemens" compound catenary (three wires). His main example is the New York, New Haven, and Hartford Railway, where the lines near New York City were forbidden to use steam. In various places they used third rail (bottom contact), an overhead rail (presumably also DC), and 11 kV overhead. The OLE was an odd system with two catenary wires side by side and V-shaped droppers to the contact wire - which seems now to be solving a non-problem.

*The full text (and some of the pictures) of Simmons was digitised by Google Books, but for some reason is only available from the Internet Archive - p787 (p832 on line) for the section on electric traction, and p815 (p860) for railways.
Logged
Bmblbzzz
Transport Scholar
Hero Member
******
Posts: 4256


View Profile
« Reply #5 on: January 14, 2021, 12:41:25 »

Didn't the Southern adopt third rail because the availability of their initially chosen OHLE system was interrupted by WWI?
Logged

Waiting at Pilning for the midnight sleeper to Prague.
stuving
Transport Scholar
Hero Member
******
Posts: 7156


View Profile
« Reply #6 on: January 14, 2021, 14:49:07 »

Didn't the Southern adopt third rail because the availability of their initially chosen OHLE system was interrupted by WWI?

On the evidence, it was more to do with standardisation.

The 1956 decision Graham referred to was contained in a BTC report called "Modernisation of British Railways (at the Railways Archive). That is quite short, and includes a useful historical summary.

Before the 1956 decision, national policy was fixed in the 1932 "Standardisation of Electrification Order" (sadly not in RA). Generally, only 750 V DC (Direct Current) third rail and 1500 V DC overhead were to be allowed. But the committee report the order was based on referred back to a similar one in 1927, and that only reviewed another such report that made the same formal recommendation in 1921 (but with no legal backing).

So the industry was already thinking along those lines before the order confirmed it, and through running was a major reason for all this standardisation. The 1921 report said that the LBSC should be allowed to extend their 6.6 kV OLE (Overhead Line Equipment, more often "OHLE") to Brighton, but grudgingly. The move to the "big four" in 1923 pushed compatibility across the SR(resolve) up the agenda, so the 1927 report notes that the (by then) SR had decided to discontinue their existing system (and they had already done the extension with third rail).


« Last Edit: January 14, 2021, 16:24:10 by stuving » Logged
broadgage
Transport Scholar
Hero Member
******
Posts: 5398



View Profile
« Reply #7 on: January 14, 2021, 15:46:06 »

It should be remembered that steam locomotives compared well to electric power in the early days.
A steam power station as used 100 years might only have an efficiency of 20% under ideal conditions and perhaps 15% in practice. As much as 50% could be lost between power station and railway line.
A steam locomotive might be 10% efficient under favourable conditions.

By the 1960s, steam locomotives had improved only moderatly, but modern steam power stations had reached about 34% efficieny and losses between power station and track had also been reduced.
The National Grid allowed the best power stations to run continualy at full load, with stations lower down the "merit order" being kept for peak loads and breakdowns. A lot of local generating capacity was scrapped once cheap power from the national grid was available. As a report said, "Even when local conditions require a non standard supply, it will be economic to take a bulk supply at high voltage from the grid, inccur the conversion losses, and scrap local power stations"
A lot of otherwise obsolete generating plant was reprieved by the war, and immediate post war shortages.

And prior to the national grid, most local power stations could not supply main line electric railways economically. Trams were bad enough.

Electrification was a higher priority in nations with no or little coal, but ample hydroelectric power. Here in the UK (United Kingdom) we had plenty of cheap coal.
Logged

A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard.
It has space for cycles, surfboards,luggage etc.
A 5 car DMU (Diesel Multiple Unit) is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
Robin Summerhill
Transport Scholar
Hero Member
******
Posts: 1145


View Profile Email
« Reply #8 on: January 14, 2021, 16:34:46 »

And prior to the national grid, most local power stations could not supply main line electric railways economically. Trams were bad enough.


I read somewhere that the lack of sufficient local power generation was one of the reasons that the IOW electrification in 1967 only electrified the railwy as far as Shanklin and the remaining few miles to Ventnor was closed.
Logged
bradshaw
Transport Scholar
Hero Member
******
Posts: 1450



View Profile
« Reply #9 on: January 14, 2021, 17:31:53 »

Herbert Walker, the LSWR (London South Western Railway) General manager, sent Herbert Jones, their Electrical Engineer, on  a fact finding visit to the USA in 1912. Jones was impressed by the USA 3rd rail DC (Direct Current) system for its economy of installation and reliability in use. This led to its adoption by the LSWR. The scheme was presented to the Board in December 1912.
 (source Southern Electric by David Brown vol1 Capital Transport 2009)
Logged
Bmblbzzz
Transport Scholar
Hero Member
******
Posts: 4256


View Profile
« Reply #10 on: January 14, 2021, 18:01:10 »

Didn't the Southern adopt third rail because the availability of their initially chosen OHLE system was interrupted by WWI?

On the evidence, it was more to do with standardisation.

The 1956 decision Graham referred to was contained in a BTC report called "Modernisation of British Railways (at the Railways Archive). That is quite short, and includes a useful historical summary.

Before the 1956 decision, national policy was fixed in the 1932 "Standardisation of Electrification Order" (sadly not in RA). Generally, only 750 V DC (Direct Current) third rail and 1500 V DC overhead were to be allowed. But the committee report the order was based on referred back to a similar one in 1927, and that only reviewed another such report that made the same formal recommendation in 1921 (but with no legal backing).

So the industry was already thinking along those lines before the order confirmed it, and through running was a major reason for all this standardisation. The 1921 report said that the LBSC should be allowed to extend their 6.6 kV OLE (Overhead Line Equipment, more often "OHLE") to Brighton, but grudgingly. The move to the "big four" in 1923 pushed compatibility across the SR(resolve) up the agenda, so the 1927 report notes that the (by then) SR had decided to discontinue their existing system (and they had already done the extension with third rail).



I'm sure that's all correct, but those decisions are all after the end of WWI. I'm talking about something that happened immediately in 1914. What I remember reading is that the decision had been taken to electrify using overhead equipment and a supplier had been selected, based in Germany. Then with the outbreak of war, that became impossible, so they went for a British-made third rail system (possibly based on that already in used on the Underground?). However, I can't now find any reference to it, so possibly I'm getting several different things mixed up...
Logged

Waiting at Pilning for the midnight sleeper to Prague.
stuving
Transport Scholar
Hero Member
******
Posts: 7156


View Profile
« Reply #11 on: January 14, 2021, 19:30:12 »

I'm sure that's all correct, but those decisions are all after the end of WWI. I'm talking about something that happened immediately in 1914. What I remember reading is that the decision had been taken to electrify using overhead equipment and a supplier had been selected, based in Germany. Then with the outbreak of war, that became impossible, so they went for a British-made third rail system (possibly based on that already in used on the Underground?). However, I can't now find any reference to it, so possibly I'm getting several different things mixed up...

If you look at the sources I cited earlier, it's clear that the committees tolerated extending the "non-standard" LBSC system only because it was their standard. But they had only done their "suburban" lines - even if the choice of 6.6 kV was based on doing the Brighton main line. So the obvious conclusion is that what war stopped was the extension of their electrified network.

That's borne out by this page - which adds that some small planned extensions were made even by SR(resolve) after 1923, before they gave in to (presumably) industry pressure and the expected legislation in the 1932 order, as well as the logic of adopting LSWR (London South Western Railway)'s more extensive DC (Direct Current) system as standard.
Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4355


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #12 on: January 14, 2021, 20:03:29 »

I'm sure that's all correct, but those decisions are all after the end of WWI. I'm talking about something that happened immediately in 1914. What I remember reading is that the decision had been taken to electrify using overhead equipment and a supplier had been selected, based in Germany. Then with the outbreak of war, that became impossible, so they went for a British-made third rail system (possibly based on that already in used on the Underground?). However, I can't now find any reference to it, so possibly I'm getting several different things mixed up...

If you look at the sources I cited earlier, it's clear that the committees tolerated extending the "non-standard" LBSC system only because it was their standard. But they had only done their "suburban" lines - even if the choice of 6.6 kV was based on doing the Brighton main line. So the obvious conclusion is that what war stopped was the extension of their electrified network.

That's borne out by this page - which adds that some small planned extensions were made even by SR(resolve) after 1923, before they gave in to (presumably) industry pressure and the expected legislation in the 1932 order, as well as the logic of adopting LSWR (London South Western Railway)'s more extensive DC (Direct Current) system as standard.

The demise of the London Brighton and South Coast electrification OLE (Overhead Line Equipment, more often "OHLE") system was brought about when Grouping happened, the London and Southwestern won the day in the board room of the Southern Railway they had a larger and more established third rail system.  There were also engineering problems with tunnels on the LBSC using an OLE system.  The LBSC 6.6kV was an auto transformer system which required an addition live conductor at the top of the support masts, also it was not 50 Hz which had become the UK (United Kingdom) standard ac power frequency.
 
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page