Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 16:55 08 Dec 2023
- Wind and rain expected to bring weekend travel disruption
- Rail passengers stuck for hours in 'surreal' ordeal
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 10/12/23 - Winter Timetable starts
14/12/23 - Estimates of station usage: Ap
24/12/23 - Paddington closed
25/12/23 - No GWR trains

On this day
8th Dec (2013)
Restoration of useable service through Melksham (link)

Train RunningCancelled
12:50 Penzance to Cardiff Central
13:00 Cardiff Central to Penzance
14:36 London Paddington to Paignton
08/12/23 14:59 Cheltenham Spa to London Paddington
15:15 Plymouth to London Paddington
15:18 London Paddington to Cardiff Central
15:31 London Paddington to Cheltenham Spa
15:42 Exeter St Davids to London Paddington
15:47 Plymouth to Penzance
15:54 Cardiff Central to London Paddington
16:00 Cardiff Central to Taunton
16:01 Reading to Gatwick Airport
16:02 Oxford to London Paddington
16:13 Par to Newquay
16:23 London Paddington to Oxford
16:25 Looe to Liskeard
16:33 Reading to Basingstoke
16:50 Plymouth to London Paddington
16:50 Reading to Gatwick Airport
16:54 Liskeard to Looe
16:54 Cardiff Central to London Paddington
16:59 Cheltenham Spa to London Paddington
17:00 Plymouth to Liskeard
17:01 Oxford to London Paddington
17:10 Gloucester to Weymouth
17:11 Taunton to Cardiff Central
17:19 Newquay to Par
17:19 Basingstoke to Reading
17:25 Looe to Liskeard
17:29 Gatwick Airport to Reading
17:54 Cardiff Central to London Paddington
17:56 Liskeard to Plymouth
17:57 Liskeard to Looe
18:10 Taunton to Cardiff Central
18:23 London Paddington to Banbury
18:29 Gatwick Airport to Reading
18:30 Looe to Liskeard
18:59 Cheltenham Spa to London Paddington
19:00 Liskeard to Looe
19:20 Reading to Redhill
19:30 Looe to Liskeard
Additional 19:35 Westbury to Salisbury
19:58 Cardiff Central to Taunton
20:01 Reading to Gatwick Airport
20:05 Liskeard to Looe
20:06 Westbury to Cheltenham Spa
20:13 Swindon to Westbury
20:14 Weymouth to Bristol Temple Meads
20:37 Looe to Liskeard
21:05 Liskeard to Looe
21:16 Westbury to Swindon
21:29 Gatwick Airport to Reading
21:37 Looe to Liskeard
22:16 Cheltenham Spa to Swindon
22:24 Plymouth to Exeter St Davids
22:30 Swindon to Westbury
22:44 Taunton to Bristol Temple Meads
23:42 Swindon to Cheltenham Spa
Short Run
12:15 Penzance to London Paddington
13:28 Weymouth to Gloucester
14:00 Cardiff Central to Penzance
15:00 Cardiff Central to Taunton
15:18 Hereford to London Paddington
15:28 London Paddington to Weston-Super-Mare
15:30 Cardiff Central to Portsmouth Harbour
15:38 Bristol Temple Meads to Worcester Shrub Hill
15:38 Didcot Parkway to London Paddington
etc
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
December 08, 2023, 04:57:05 pm *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[152] Network Rail is failing.
[125] Annoying / amusing use of completely irrelevant stock photos t...
[88] Infrastructure problems in Thames Valley causing disruption el...
[56] A new era dawns on the TransWilts - 08 Dec 13
[18] County Cricket on the move from Bristol?
[14] 2023 - Train update and amendment log - Swindon <-> Westbury...
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: [1] 2 3 4
  Print  
Author Topic: Devon and Cornwall resignalling  (Read 16386 times)
FarWestJohn
Sr. Member
****
Posts: 232


View Profile
« on: June 26, 2021, 06:59:04 pm »

Has anyone seen any further information on this:

https://news.railbusinessdaily.com/siemens-mobility-to-deliver-low-cost-digital-solution-for-devon-and-cornwall-re-signalling-programme/?fbclid=IwAR1Ngm8QLBWeakyQ-XAV6NvmwPocHsx5CGQ54wIUYi7qX8te3Ox7yjA6MXQ

It says completion in late 2023!!

I did not see any mention of it in the current Modern Railways article on GWR (Great Western Railway).
Logged
bobm
Administrator
Hero Member
*****
Posts: 9716



View Profile
« Reply #1 on: June 26, 2021, 07:13:09 pm »

Quote
As well as installation of all signalling equipment, Siemens Mobility will be supplying its Controlguide Westcad control system at Exeter power signal box (PSB (Power Signal Box)) for Cornwall, and at Plymouth PSB for Devon, as well as taking responsibility for all telecommunications; power distribution and civil engineering works required for the new equipment.

Someone's geography has got confused!
Logged
infoman
Hero Member
*****
Posts: 1193


View Profile
« Reply #2 on: June 26, 2021, 07:45:02 pm »

Would this mean that all Semaphore signals would be no more?
Logged
AMLAG
Sr. Member
****
Posts: 216


View Profile
« Reply #3 on: June 26, 2021, 08:16:59 pm »


So far the Siemens Mobility press release seems unclear in how much of the current
signalling in Cornwall will instead be controlled from the Exeter Signalling Centre and which Cornish SBs (Signal Box) will be closed and just what the reported elsewhere, area of 'West Devon' that will be controlled from the existing early 1960's Plymouth PSB (Power Signal Box), which ?was/is
expected to close.
The last Semaphore signals could well, in 2024, be at Bodmin General.

Logged
GBM
Transport Scholar
Hero Member
******
Posts: 1335


View Profile Email
« Reply #4 on: June 27, 2021, 08:22:50 am »

I'm very confused (it's my age).
Plymouth will/might control some parts of West Cornwall; the rest going over to Exeter.
Why not do the lot from Plymouth; over even do it all from Exeter and shut Plymouth.  Huh
Logged

Personal opinion only.  Writings not representative of any union, collective, management or employer. (Think that absolves me...........)
bobm
Administrator
Hero Member
*****
Posts: 9716



View Profile
« Reply #5 on: June 27, 2021, 11:46:19 am »

I remember back in 2014 I was lucky enough to look round the Thames Valley Signalling Centre at Didcot.  At that stage the plan was still to control everything from Paddington to Penzance from there.

In this photo the Paddington workstation is the last video display on the right.  Penzance would, I believe, have been at the end of the semi-circular wood surround in the foreground. 

Logged
Pb_devon
Transport Scholar
Sr. Member
******
Posts: 286


View Profile
« Reply #6 on: June 27, 2021, 12:27:10 pm »

I hope it’s OK to quote from a post on RMweb earlier this week:

“ As one of the designers on the scheme, I can answer the questions:
 
1) Semaphore Signalling at Liskeard, St. Blazey, Goonbarrow and St. Erth is safe, and the mechanical frame at Penzance is also safe. I think the signal boxes that are being closed will remain standing, just in a different use.
 
2) The new workstation at Exeter will cover Cornwall, and eventually also control Plymouth when that’s done (although I don’t when that will be). There’s simply more space for a workstation at Exeter and it’s where the Cornish signallers are based at anyway (at least I think that was the case when we did the original scheme).
 
Simon”

I have asked him to clarify that the mechanical signals will be motor driven remotely.
Logged
GBM
Transport Scholar
Hero Member
******
Posts: 1335


View Profile Email
« Reply #7 on: June 27, 2021, 12:34:11 pm »

Thank you Pb_devon.
Clears my mind somewhat.
Wonder why Penzance is 'safe' as it only controls that area.
If Plymouth can be remoted from Exeter, then Penzance would be no problem to remote.
Logged

Personal opinion only.  Writings not representative of any union, collective, management or employer. (Think that absolves me...........)
Jamsdad
Sr. Member
****
Posts: 200


View Profile Email
« Reply #8 on: June 28, 2021, 12:10:00 pm »

Don't let Mebyon Kernow hear that!
Logged
Pb_devon
Transport Scholar
Sr. Member
******
Posts: 286


View Profile
« Reply #9 on: June 28, 2021, 04:24:06 pm »

And the answer Simon has provided is this:

“ Yes and no, the Mechanical Semaphores at Lostwithiel, Par and Truro are all being replaced with LED Colour Lights, they will be controlled by a VDU Workstation at Exeter rather than the panel. However, the Mechanical Semaphore Signals at Liskeard, St. Blazey, Goonbarrow and St. Erth will remain and worked by their respective boxes.”
 
So a partial resignalling then!
Logged
ellendune
Transport Scholar
Hero Member
******
Posts: 4398


View Profile
« Reply #10 on: June 28, 2021, 06:08:26 pm »

At first sight this looks a bit of a patchwork.  It would be more logical if Liskeard only covered the branch to Looe.  Where is the interface with Plymouth panel?
Logged
TonyK
Global Moderator
Hero Member
*****
Posts: 6382


The artist formerly known as Four Track, Now!


View Profile
« Reply #11 on: June 29, 2021, 08:12:48 am »

And the answer Simon has provided is this:

“ Yes and no, the Mechanical Semaphores at Lostwithiel, Par and Truro are all being replaced with LED Colour Lights, they will be controlled by a VDU Workstation at Exeter rather than the panel. However, the Mechanical Semaphore Signals at Liskeard, St. Blazey, Goonbarrow and St. Erth will remain and worked by their respective boxes.”
 
So a partial resignalling then!

It saves the cost of building a museum. One day, the UK (United Kingdom) signalling system will be controlled by one person from a smartphone app.
Logged

Now, please!
Pb_devon
Transport Scholar
Sr. Member
******
Posts: 286


View Profile
« Reply #12 on: June 29, 2021, 08:29:17 am »

Where is the interface with Plymouth panel?

Plymouth controls west up to the Liskeard distant.
Logged
Carvolth
Newbie
*
Posts: 2


View Profile Email
« Reply #13 on: January 23, 2022, 09:30:47 pm »

I still find it hard to understand the logic of a mixture of old mechanical signalling with that of a modern network all controlled from one ROC (Rail Operating Centre - a centralised location for railway signalling and train control operations for a specific route or region). It seems a "pig's ear" of a scheme to me and probably fraught with difficulties.
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 9935


View Profile
« Reply #14 on: January 23, 2022, 09:43:24 pm »

I still find it hard to understand the logic of a mixture of old mechanical signalling with that of a modern network all controlled from one ROC (Rail Operating Centre - a centralised location for railway signalling and train control operations for a specific route or region). It seems a "pig's ear" of a scheme to me and probably fraught with difficulties.


Cost.  Short term cost.  Undecided
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1] 2 3 4
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page