Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
No recent travel & transport from BBC stories as at 19:55 19 Apr 2024
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
19th Apr (1938)
Foundation, Beatties of London (link)

Train RunningCancelled
19:02 London Paddington to Bristol Temple Meads
19:18 London Paddington to Swansea
19:23 London Paddington to Oxford
21:02 Oxford to London Paddington
Short Run
15:50 Penzance to Gloucester
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 19, 2024, 20:07:45 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[333] Rail to refuge / Travel to refuge
[69] Rail delay compensation payments hit £100 million
[53] Somerset and Dorset Devonshire Tunnel flood
[30] Difficult to argue with e-bike/scooter rules?
[28] Signage - not making it easy ...
[6] IETs at Melksham
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: [1]
  Print  
Author Topic: Overrunning Engineering works - 26/09/2021 ??  (Read 2144 times)
johoare
Hero Member
*****
Posts: 2818


View Profile
« on: September 26, 2021, 14:21:01 »

I can't see anything else on here about this but does anyone know how long the engineering works were supposed to go on and at what point they became overrunning?

My son went to Maidenhead station about 11.15ish. Apparently at that time the trains were all showing as going to Paddington and there was no information (that he saw) to suggest anything was different to normal.

He spent at least an hour at Slough where apparently the information was sadly not forthcoming (again his opinion)

**update** I have just seen online that Paddington was due to open at 12

He got to Ealing Broadway at about 1.50pm.. Kind of missed his booked activity in Vauxhall at 2pm but fortunately that was able to be  rescheduled until later.
Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 12357


View Profile Email
« Reply #1 on: September 26, 2021, 17:12:56 »

I think I saw notification that Padd was shut until 1230
Logged
johoare
Hero Member
*****
Posts: 2818


View Profile
« Reply #2 on: September 26, 2021, 19:18:18 »

That doesn't totally explain him not getting to Ealing Broadway until 1.50pm then.

As a non commuter now (and my son isn't either) it's obvious how much information is missing for people who only occasionally get the train. On this occasion particularly when he got to the station and was allowed and able to board a train to Paddington. Then everyone had to get off at Slough and couldn't go either way.
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7163


View Profile
« Reply #3 on: September 26, 2021, 19:59:37 »

This was on the National Rail site, though not as soon as you might like. If you follow the Rail News link at the top of the forum pages to NewsNow, and page down to see reports from earlier today, there are links to out-of-date information pages there that still work for a while (but are presumably not accessible by links on the NR» (Network Rail - home page) site itself). The first one was still active earlier today, but has now gone. Its headline on NewsNow reads:

No Great Western Railway service to / from London Paddington until 12:00 on Sunday 26 September National Rail (Press Release) 00:41

Then there is this one timed at 14:04 (note there will have an earlier one, presumably timed at 12:32):
https://www.nationalrail.co.uk/service_disruptions/280202.aspx
Quote
Incident created
    26/09/2021 12:32
Last updated
    26/09/2021 14:04
Route affected
    All routes to / from London Paddington
     
TOC (Train Operating Company)(s) affected
    Great Western Railway;Heathrow Express;TfL» (Transport for London - about) Rail;

Description
    All lines have now reopened following overrunning engineering work between London Paddington and Slough.

    Trains between London Paddington and Slough may still be cancelled, delayed by up to 20 minutes or revised.

    Disruption is expected until 15:00.
« Last Edit: September 26, 2021, 20:25:16 by stuving » Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 12357


View Profile Email
« Reply #4 on: September 26, 2021, 20:11:19 »

That was accurate - I found a National Rail tweet timed at 1457 that indicated the line had just opened
Logged
johoare
Hero Member
*****
Posts: 2818


View Profile
« Reply #5 on: September 27, 2021, 13:14:05 »

So it appears to be the usual amazing lack of information and cover up when things went wrong.

I've now seen him and apparently at Maidenhead, as mentioned before, no mention of an issue, all trains showing on the board as going all the way to Paddington

He got a train to Paddington to change at Slough to a faster one. As at Maidenhead, no sign of any issues at Slough, his next train showing as on time (all the way to Paddington), then eventually delayed, then cancelled. After this lots of announcements about "the next train to Paddington will be from platform 3/5" and as only people who travel from stations with two lines heading in the same direction can vouch for, the announcers kept the waiting passengers amused by moving them from platform 3 to 5 and back (repeat as many times as possible) promising them a train which never arrived on each occasion.

Eventually having shuffled everyone back to platform 3 a train came and went from platform 5

Then eventually another train but this was too full for anyone at Slough to get on.
Eventually a train appeared he was able to get on hence arriving at Ealing Broadway at 13.50 (10 minutes before a booked activity in Vauxhall).

Not once was overrunning engineering works mentioned.

Customer Service lesson learnt? Or lack of information to the poor station staff lesson learned?

Logged
bobm
Administrator
Hero Member
*****
Posts: 9832



View Profile
« Reply #6 on: September 27, 2021, 15:40:40 »

There was an incident near Newbury which required an emergency switch off of the overhead lines.  As it was unplanned this also affected the line from Reading to Didcot.  Apparently the works in the Paddington area had involved some changes to the feed arrangements and an incident at Newbury would not normally have affected Didcot.

This took manpower away from restoring the supply to the overhead lines east of Reading and so delayed the final testing and restoration of services.

I was told this second hand but that was the basic gist.
Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4362


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #7 on: September 27, 2021, 18:39:25 »

There was an incident near Newbury which required an emergency switch off of the overhead lines.  As it was unplanned this also affected the line from Reading to Didcot.  Apparently the works in the Paddington area had involved some changes to the feed arrangements and an incident at Newbury would not normally have affected Didcot.

This took manpower away from restoring the supply to the overhead lines east of Reading and so delayed the final testing and restoration of services.

I was told this second hand but that was the basic gist.

This is the problem with current power supplies to the GWML (Great Western Main Line), the Grid sites are 50 miles apart!  On older 25kV electrification it is typically 20 or so miles and certainly somewhere are critical as Reading there would be an alternative supply.

GW (Great Western) electrification was designed to save money on "expensive" power distribution assets like grid connections.

The scenario could have been -

The work in Paddington area was apparently for HS2 (The next High Speed line(s)) enabling, Old Oak Common where HS2 is located is West of Kensal Green Grid site, so if an all line Isolation was need for this work the OLE (Overhead Line Equipment, more often "OHLE") west of Acton would be from Didcot. 

Emergency switch off has to be between Neutral Sections, currently there are no Neutral Sections between Reading and Newbury, the emergency switch off would therefore be between Maidenhead Neutral Sections and Didcot Neutral Sections, this would render the OLE dead between Maidenhead and Acton due to the all line isolation at Kensal.

The planned Grid feed from Bramley to Reading will alleviate this risk
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
johoare
Hero Member
*****
Posts: 2818


View Profile
« Reply #8 on: September 27, 2021, 20:01:52 »

All very interesting but shouldn't have affected Mai to Pad at that time.. or the (in)ability to provide proper information to passengers so they could make informed decisions rather than playing the platform shuffle game for an hour for no apparent reason.
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page